1501:21-11-03 On-site construction materials.

Where local and in-place materials, such as borrow soil, aggregate, riprap stone, and filter material, are proposed for use in the dam or levee, the applicant shall determine the locations and extents of these materials, and their structural properties and gradations when incorporated into the proposed dam or levee. The applicant shall show the locations of these materials on the plans.

R.C. 119.032 review dates: 03/08/2010 and 03/05/2015
Promulgated Under: 119.03
Statutory Authority: 1521.06
Rule Amplifies: 1521.06 , 1521.061
Prior Effective Dates: 4-15-72; 10-15-81; 12-9-99; 1-16-05