1501:21-17-03 Approval of construction by the chief.

Upon receipt of the engineer's certification required in rule 1501:21-15-05 of the Administrative Code, the as-built plans and detailed final cost required in rule 1501:21-15-04 of the Administrative Code, the operation, maintenance, and inspection manual required in rule 1501:21-15-06 of the Administrative Code, and the emergency action plan required in rule 1501:21-15-07 of the Administrative Code, the chief shall within thirty days inspect the completed construction. If the chief finds that construction was completed in accordance with the approved plans, specifications, and changes, the chief shall within fourteen days after inspection approve the construction and so notify the owner and the surety in writing. The approval date shall be the date such notice is sent by the chief.

R.C. 119.032 review dates: 03/08/2010 and 03/05/2015
Promulgated Under: 119.03
Statutory Authority: 1521.06
Rule Amplifies: 1521.06 , 1521.061
Prior Effective Dates: 4-15-72, 10-15-81, 12-9-99