1501:9-11-04 Notification and supervision.

Each plugging operation shall be conducted under the supervision of an inspector. The well owner or his authorized agent shall notify the inspector when plugging operations will commence at a dry hole or lost hole in sufficient time to enable the inspector to be present. For all other wells, the owner or his authorized agent shall notify the inspector a minimum of twenty-four hours prior to commencement of plugging operations. The chief may grant verbal authorization to the owner to commence plugging operations when the inspector is unable to be present in accordance with the provisions in sections 1509.13 and 1509.14 of the Revised Code.

Eff 7-16-82; 8-9-93; 4-15-04
Rule promulgated under: RC 119.03
Rule authorized by: RC 1509.03
Rule amplifies: RC 1509.13
RC 119.032 review dates: 9/16/03, 1/27/04, 4/15/09