(A)
(1) The owner or operator of a facility that has arranged to receive hazardous waste from a foreign source must notify the regional administrator of U.S. EPA in writing at least four weeks in advance of the date the waste is expected to arrive at the facility. Notice of subsequent shipments of the same waste from the same foreign source is not required.
(2) Reserved.
(B) The owner or operator of a facility that receives hazardous waste from an off-site source, except where the owner or operator is also the generator, must inform the generator in writing that he has the appropriate permit(s) for, and will accept, the waste the generator is shipping. The owner or operator must keep a copy of this written notice as part of the operating record.
(C) Before transferring ownership or operation of a facility during its operating life, or of a disposal facility during the post-closure care period, the owner or operator must notify the new owner or operator in writing of the requirements of Chapters 3745-54 to 3745-57 and 3745-205 of the Administrative Code.
[Comment: An owner’s or operator’s failure to notify the new owner or operator of the requirements of Chapters 3745-54 to 3745-57 and 3745-205 of the Administrative Code does not relieve the new owner or operator of his obligation to comply with all applicable requirements.]
Effective: 09/05/2010
R.C. 119.032 review dates: 04/14/2010 and 08/25/2014
Promulgated Under: 119.03
Statutory Authority: 3734.12
Rule Amplifies: 3734.12
Prior Effective Dates: 04/15/1981, 01/07/1983, 12/07/2000, 12/07/2004