5501:2-1-14 Conditions on approved facility.

(A) Any manufacture or steel or aluminum coil processing site may request to be designated as an approved facility for the purposes of shipping steel or aluminum coils.

(B) Every site making a request to be an approved facility shall send a letter to the department of transportation stating such request. Additionally, the site must document in its request that it has a scale facility capable of weighing each vehicle loaded with steel or aluminum coils and has policies, procedures and practices in place to assure that the vehicle is in compliance with the conditions and limitations of the special hauling permit issued for the movement.

(C) Any approved facility may have its approved facility designation suspended or revoked for cause.

Effective: 01/27/2014
R.C. 119.032 review dates: 11/12/2013 and 09/01/2018
Promulgated Under: 119.03
Statutory Authority: 5501.02
Rule Amplifies: 4513.34
Prior Effective Dates: 10/16/08