(A) To the extent that manure is not managed through distribution and utilization methods in accordance with rule 901:10-2-11 of the Administrative Code, then the owner or operator shall prepare a manure management plan with a total nutrient budget for the facility based on the following:
(1) Targeted crop yields based on actual crop yields;
(2) Soil productivity information;
(3) Historical yield data;
(4) Potential yield; or
(5) Combinations of yield data.
(B) The manure management plan shall include the quantity of manure and manure nutrients for a twelve month period as derived from rule 901:10-2-10 of the Administrative Code.
(C) The manure management plan shall include the total summary of acres of land to be used for land application sites. This summary includes the land that is available for the duration of the permit and the land that is available for manure that is generated by the facility. The total summary shall be further characterized as follows:
(1) The total nutrient budget requirements on land application sites under the control of the owner or operator; and
(2) The quantity of commercial fertilizer nutrients or residual nutrients from all sources to be applied on land application sites under the control of the owner or operator for a twelve month period; and
(3) The quantity of nutrients to be managed by the owner or operator through distribution and utilization methods utilized for a twelve month period, in accordance with rule 901:10-2-11 of the Administrative Code.
Effective: 09/15/2005
R.C. 119.032 review dates: 04/21/2005 and 08/15/2010
Promulgated Under: 119.03
Statutory Authority: 903.08, 903.10
Rule Amplifies: 903.01, 903.02, 903.04, 903.07, 903.08, 903.081, 903.082, 903.09, 903.10
Prior Effective Dates: 07/02/2002