The department of administrative services, pursuant to Chapter 119. of the Revised Code and not later than June 30, 2012, shall adopt rules to do all of the following:
(A) Prescribe the procedures and criteria for determining the best value selection of a construction manager at risk or design-build firm;
(B) In consultation with the state architect’s office, set forth standards to be followed by construction managers at risk and design-build firms when establishing prequalification criteria pursuant to section 153.502 of the Revised Code;
(C) Prescribe the form for the contract documents to be used by a construction manager at risk, design-build firm, or general contractor when entering into a subcontract;
(D) Prescribe the form for the contract documents to be used by a public authority when entering into a contract with a construction manager at risk or design-build firm.
Added by 129th General Assembly File No. 28, HB 153, § 101.01, eff. 9/29/2011.