Section 3706.40 | Definitions for sections 3706.40 to 3706.65.
Effective:
June 30, 2021
Latest Legislation:
House Bill 128 - 134th General Assembly
As used in sections 3706.40 to 3706.65 of the Revised Code:
(A) "Qualifying solar resource" means an electric generating facility in this state to which all of the following apply:
(1) The facility uses or will use solar energy as the primary energy source.
(2) The facility obtained a certificate for construction of a major utility facility from the power siting board prior to June 1, 2019.
(3) The facility is interconnected with the transmission grid that is subject to the operational control of PJM interconnection, L.L.C., or its successor organization.
(B) "Electric distribution utility" has the same meaning as in section 4928.01 of the Revised Code.
Last updated May 17, 2021 at 2:34 PM
Available Versions of this Section
- October 22, 2019 – Enacted by House Bill 6 - 133rd General Assembly [ View October 22, 2019 Version ]
- June 30, 2021 – Amended by House Bill 128 - 134th General Assembly [ View June 30, 2021 Version ]