4906.201 [Effective Until 9/15/2014] Setback requirements.

An electric generating plant that consists of wind turbines and associated facilities with a single interconnection to the electrical grid that is designed for, or capable of, operation at an aggregate capacity of fifty megawatts or more is subject to the minimum setback requirements established in rules adopted by the power siting board under division (B)(2) of section 4906.20 of the Revised Code. For any existing certificates and amendments thereto, and existing certification applications that have been found by the chairperson to be in compliance with division (A) of section 4906.06 of the Revised Code before the effective date of the amendment of this section by H.B. 59 of the 130th general assembly, the distance shall be seven hundred fifty feet instead of one thousand one hundred twenty-five feet.

History. Added by 130th General Assembly File No. 25, HB 59, §101.01, eff. 9/29/2013.

Note: This section is set out twice. See also § 4906.201 , as amended by 130th General Assembly File No. TBD, HB 483, §101.01, eff. 9/15/2014.