Skip to main content
Back To Top Top Back To Top
This website publishes administrative rules on their effective dates, as designated by the adopting state agencies, colleges, and universities.

Ohio Administrative Code Search

Busy
 
Keywords
:
1-719-323-9442
{"removedFilters":"","searchUpdateUrl":"\/ohio-administrative-code\/search\/update-search","keywords":"1-719-323-9442","start":1476,"pageSize":25,"sort":"BestMatch"}
Results 1,476 - 1,500 of 10,288
Sort Options
Sort Options
Rules
Rule
Rule 1501:13-4-08.1 | Application, supplemental and hydrologic maps, and cross-sections, designs and plans for underground workings.

...on is required by state law, showing: (1) All boundaries of land and names of present owners of record of those lands, both surface and subsurface, included in or contiguous to the proposed shadow area; noting the boundaries of land within the proposed shadow area upon which the applicant has the legal right to enter and begin coal mining operations and which areas the applicant does not yet have this right; (2) Th...

Rule 1501:13-4-09 | General map requirements.

...l maps and drawings required by Chapter 1513. of the Revised Code or Chapters 1501:13-1 to 1501:13-14 of the Administrative Code shall, in addition to other applicable requirements, be in quadruplicate and, where the area of land to be permitted is ten acres or less, have a scale of one inch equals one hundred feet; where the area of land to be permitted is greater than ten acres but less than one hundred acres, have...

Rule 1501:13-4-09 | General map requirements.

...l maps and drawings required by Chapter 1513. of the Revised Code or Chapters 1501:13-1 to 1501:13-14 of the Administrative Code shall, in addition to other applicable requirements, be submitted to the division and, where the area of land to be permitted is ten acres or less, have a scale of one inch equals one hundred feet; where the area of land to be permitted is greater than ten acres but less than one ...

Rule 1501:13-4-10 | Uniform color code and map symbols.

...

Rule 1501:13-4-11 | Maps showing reaffection of permit area.

...(A) All maps required by Chapter 1513. of the Revised Code or Chapters 1501:13-4 to 1501:13-14 of the Administrative Code showing land affected under a permit and reaffected under a subsequent permit shall conform to the requirements of paragraph (A) of rule 1501:13-4-08 of the Administrative Code. In addition to other applicable requirements, all maps shall show the following information in the prescribed manner set...

Rule 1501:13-4-12 | Requirements for permits for special categories of mining.

...ermit requirements contained in Chapter 1501:13-4 of the Administrative Code. All of the provisions of Chapter 1501:13-4 of the Administrative Code apply to such operations, unless otherwise specifically provided in this rule. (B) Experimental mining practices. (1) "Experimental practices," as used in this rule, means the use of alternative coal mining and reclamation operation practices for experimental or researc...

Rule 1501:13-4-12 | Requirements for permits for special categories of mining.

...ermit requirements contained in Chapter 1501:13-4 of the Administrative Code. All of the provisions of Chapter 1501:13-4 of the Administrative Code apply to such operations, unless otherwise specifically provided in this rule. (B) Experimental mining practices. (1) "Experimental practices," as used in this rule, means the use of alternative coal mining and reclamation operation practices for...

Rule 1501:13-4-13 | Underground mining permit application requirements for information on environmental resources.

...(A) General requirements. (1) This rule applies only to underground mining operations. (2) (a) Each application shall describe and identify the nature of cultural, historic and archeological resources listed or eligible for listing on the "National Register of Historic Places," administered by the national parks service, U.S. department of the interior, and known archeological sites within the proposed permit an...

Rule 1501:13-4-13 | Underground mining permit application requirements for information on environmental resources.

...(A) General requirements. (1) This rule applies only to underground mining operations. (2) (a) Each application shall describe and identify the nature of cultural, historic and archeological resources listed or eligible for listing on the "National Register of Historic Places," administered by the national parks service, U.S. department of the interior, and known archeological sites within the proposed permit an...

Rule 1501:13-4-14 | Underground mining permit application requirements for reclamation and operations plans.

...ation plan: general requirements. (1) This rule shall apply only to underground mining operations. (2) Each application shall contain a description of the mining operations proposed to be conducted during the life of the mine including: (a) A narrative description of the type and method of coal mining procedures and proposed engineering techniques, anticipated annual and total production of...

Rule 1501:13-4-14 | Underground mining permit application requirements for reclamation and operations plans.

...ation plan: general requirements. (1) This rule shall apply only to underground mining operations. (2) Each application shall contain a description of the mining operations proposed to be conducted during the life of the mine including: (a) A narrative description of the type and method of coal mining procedures and proposed engineering techniques, anticipated annual and total production of...

Rule 1501:13-4-15 | Authorization to conduct coal mining on pollution abatement areas.

...(A) Applicability. (1) This rule shall apply to applicants who seek authorization to conduct coal mining operations under modified effluent limitations of a remining NPDES permit on certain previously mined areas in which the earlier coal mining operations have resulted in continuing water pollution, and sets forth the terms and conditions under which the chief may release performance security to...

Rule 1501:13-4-16 | Requirements for exemption for coal extraction incidental to the extraction of other minerals.

...ng operations regulated under Chapter 1514. of the Revised Code may extract coal which they encounter incidentally while recovering other minerals, without being subject to the permitting and performance standards of Chapter 1513. of the Revised Code. Continued qualification for the exemption from the requirements of Chapter 1513. of the Revised Code shall depend upon annual demonstration of maintenance o...

Rule 1501:13-5-01 | Review, public participation, and approval or disapproval of permit applications and permit terms and conditions.

... applications for permit renewal. (1) After the chief determines an application for a permit, for a significant revision to a permit, or for a permit renewal to be complete, the applicant shall place an advertisement in a local newspaper of general circulation in the locality of the proposed coal mining and reclamation operations at least once a week for four consecutive weeks. The advertisem...

Rule 1501:13-5-02 | Improvidently issued permits.

...sing the criteria in this rule. (B) (1) The chief shall make a preliminary finding that a coal mining and reclamation permit was improvidently issued if: (a) Under the permit eligibility criteria in effect at the time the permit was issued: (i) The chief should not have issued the permit because of an unabated or uncorrected violation; or (ii) The permit was issued on the presumption that a violation was in th...

Rule 1501:13-6-03 | Small operator assistance program.

...(A) General. (1) The small operator assistance program (S.O.A.P.) governs the procedures for providing financial assistance to qualified small mine operators who request assistance under division (B)(3) of section 1513.07 of the Revised Code for: (a) The determination of the probable hydrologic consequences of mining and reclamation under division (B)(1)(k) of section 1513.07 of the Revised Code...

Rule 1501:13-7-01 | General requirements for providing performance security for coal mining and reclamation operations.

...irement to file performance security. (1) After an application for a permit to conduct coal mining and reclamation operations has been approved under these rules, the applicant shall file with the chief performance security in compliance with these rules. (a) If the applicant provides performance security together with reliance on the reclamation forfeiture fund in accordance with paragraph (C)(2) of this rule, the...

Rule 1501:13-7-01 | General requirements for providing performance security for coal mining and reclamation operations.

...ent to file performance security. (1) After an application for a permit to conduct coal mining and reclamation operations has been approved under these rules, the applicant shall file with the chief performance security in compliance with these rules. (a) If the applicant provides performance security together with reliance on the reclamation forfeiture fund in accordance with paragraph (C)(2) ...

Rule 1501:13-7-02 | Amount and duration of performance security.

...ccordance with paragraph (C)(2) of rule 1501:13-7-01 of the Administrative Code. (1) The amount of the performance security shall be two thousand five hundred dollars per acre of land on which the permittee will conduct a coal mining and reclamation operation under the initial term of the permit as indicated in the application. (2) A permittee's responsibility for repairing material damage and replacement of water ...

Rule 1501:13-7-03 | Form, conditions, and terms of performance security.

... forfeiture as provided in section 2323.13 of the Revised Code; (f) The bond shall provide that the surety and the permittee shall be jointly and severally liable; and (g) The bond shall provide that: (i) The surety will give prompt notice to the permittee and the chief of any notice received or action filed alleging the insolvency or bankruptcy of the surety, or alleging any violation of...

Rule 1501:13-7-03 | Form, conditions, and terms of performance security.

...upon forfeiture as provided in section 2323.13 of the Revised Code; (f) The bond shall provide that the surety and the permittee shall be jointly and severally liable; and (g) The bond shall provide that: (i) The surety will give prompt notice to the permittee and the chief of any notice received or action filed alleging the insolvency or bankruptcy of the surety, or alleging any violatio...

Rule 1501:13-7-05 | Procedures, criteria, and schedule for release of performance security for permits reliant on the reclamation forfeiture fund.

...ccordance with paragraph (C)(2) of rule 1501:13-7-01 of the Administrative Code. (A) Procedures for seeking release of performance security. (1) Request for approval of reclamation. After all reclamation, restoration, and abatement work in a reclamation phase, as defined in paragraph (B)(1) of this rule, is completed on the entire permit area or on an incremental area, the permittee, or any person authorized to act...

Rule 1501:13-7-05.1 | Procedures, criteria, and schedule for release of performance security for permits not reliant on the reclamation forfeiture fund.

...e fund in accordance with paragraph (C)(1) of rule 1501:13-7-01 of the Administrative Code. (A) Procedures for seeking approval of a reclamation phase and release of performance security. (1) Request for approval of reclamation. (a) After all reclamation, restoration, and abatement work in a reclamation phase, as defined in paragraph (B)(1) of this rule, is completed on the entire permit area or on an entire incre...

Rule 1501:13-7-06 | Performance security forfeiture criteria and procedures.

...f the following criteria applies: (1) The permittee failed to comply with a notice of violation issued for failure to complete any phase of reclamation within the time required by the mining and reclamation plan and any time extensions given for good cause; or (2) The coal mining and reclamation operations on the area under performance security are abandoned; or (3) The permittee lacks the abil...

Rule 1501:13-7-06 | Performance security forfeiture criteria and procedures.

...f the following criteria applies: (1) The permittee failed to comply with a notice of violation issued for failure to complete any phase of reclamation within the time required by the mining and reclamation plan and any time extensions given for good cause; or (2) The coal mining and reclamation operations on the area under performance security are abandoned; or (3) The permittee lacks ...