Ohio Administrative Code Search
| Rule |
|---|
|
Rule 1501:3-10-06 | Conversions and additions.
...(A) In the event a portion of the certified forest land is converted to a use for a purpose other than production of a merchantable forest product the owner will be required to obtain an amended forest management plan and revised certification of the portion not converted which will be subject to the requirements of forest land eligibility of rule 1501:3-10-02 of the Administrative Code. Failure t... |
|
Rule 1501:3-10-06 | Conversions and additions.
...(A) In the event a portion of the certified forest land is converted to a use for a purpose other than production of a merchantable forest product the owner shall be required to obtain an amended forest management plan and revised certification of the portion not converted which shall be subject to the requirements of forest land eligibility of rule 1501:3-10-02 of the Administrative Code. Failure... |
|
Rule 1501:3-10-07 | Special provisions for property certified prior to November 7, 1994.
...Forest land certified as eligible by the division for taxation in accordance with section 5713.23 of the Revised Code prior to November 7, 1994 shall not be subject to rules 1501:3-10-02 to 1501:3-10-06 of the Administrative Code. These forest lands will be subject to the following provisions. (A) The forest land certified under this rule will consist of a minimum of five contiguous acres and will be no ... |
|
Rule 1501:3-10-07 | Special provisions for property certified prior to November 7, 1994.
...Forest land certified as eligible by the division for taxation in accordance with section 5713.23 of the Revised Code prior to November 7, 1994 shall not be subject to rules 1501:3-10-02 to 1501:3-10-06 of the Administrative Code. These forest lands shall be subject to the following provisions. (A) The forest land certified under this rule shall consist of a minimum of five contiguous acres and shall be ... |
|
Rule 1501:3-12-07 | Chief's orders.
...(A) Issuing orders. When the chief or the chief's designee investigates a complaint and the owner, operator, or person responsible fails to implement a corrective action in accordance with paragraph (B)(C) or (C)(5) of rule 1501:3-12-05 of the Administrative Code, the chief or the chief's designee shall decide if an order will be issued. The chief, or the chief's designee, may, upon obtaining agre... |
|
Rule 1501:3-12-07 | Chief's orders.
...(A) Issuing orders. When the chief or the chief's designee investigates a complaint and the owner, operator, or person responsible fails to implement a corrective action in accordance with paragraph (B)(5) or (C)(5) of rule 1501:3-12-06 of the Administrative Code, the chief or the chief's designee shall decide if an order will be issued. The chief or the chief's designee, may, upon obtaining agree... |
|
Rule 1501:9-1-01 | General provisions.
...(A) Definitions. As used in Chapters 1501:9-1 to 1501:9-12 of the Administrative Code: (1) "Access road" means any road used as primary ingress and egress to the wellhead, tank battery, and associated equipment used in the production of a well. (2) "Active underground mine" means an underground excavation of coal or industrial minerals in any phase of the mining operation which is required t... |
|
Rule 1501:9-1-02 | Permits.
...(A) Application for permit--supplementary statutory requirements: (1) The date of application; (2) Designation of the well by name and number; (3) The plan for disposal of water and other waste substances resulting from, obtained, or produced in connection with exploration, drilling, or production of oil or gas. The plan for disposal of salt water shall include identification of any disposa... |
|
Rule 1501:9-1-05 | Simultaneous Operations.
...(A) As used in this rule: (1) "Fall impact radius" means either of the following as applicable: (a) The distance calculated in feet by multiplying the total height of overhead equipment by a safety factor of 1.2 and measured laterally from the well being constructed or accessed; or (b) For drilling rigs, the distance calculated in feet by multiplying the total height of overhead equipment from th... |
|
Rule 1501:9-1-08 | Well construction.
...(A) General. A well permitted under Chapters 1501:9-1 to 1501:9-12 of the Administrative Code shall be constructed in a manner that is approved by the chief as specified by these rules, the terms and conditions of the approved permit, plans submitted in the approved permit, and the standards established in section 1509.17 of the Revised Code. The casing and cementing plans in the approved permit are understood to be ... |
|
Rule 1501:9-2-02 | Horizontal well site construction.
...This rule applies to a well site for the drilling of one or more horizontal wells and associated production operations. The well site shall be designed and constructed in a manner that supports the safe drilling and production operations of one or more horizontal wells, and in a manner that protects public health and safety and minimizes damage to natural resources by managing stormwater, protecting surface water and... |
|
Rule 1501:9-2-02 | Horizontal well site construction.
...This rule applies to a well site for the drilling of one or more horizontal wells and associated production operations. The well site will be designed and constructed in a manner that supports the safe drilling and production operations of one or more horizontal wells, and in a manner that protects public health and safety and minimizes damage to natural resources, including conservation of topsoil where pr... |
|
Rule 1501:9-3-01 | Definitions.
...As used in Chapter 1501:9-3 of the Administrative Code: (A) "Amendment" means a written authorization of the chief to revise an operating surface facility including any of the following: (1) Any substantial alteration to the design or operation of the surface facility; (2) Alteration to the design or operation of the surface facility that impacts the ability of the surface facility to safely... |
|
Rule 1501:9-3-05 | Construction of and conversion to saltwater injection wells.
...(A) Each saltwater injection well permitted after June 1, 1982 shall be constructed in the following manner: (1) Surface casing shall be free of apparent defects and set at least fifty feet below the deepest underground source of water containing less than ten thousand mg/L chlorides, and sealed by circulating cement to the surface under the supervision of the division. In the event cement fails to circulate to the ... |
|
Rule 1501:9-3-05 | Permit to construct a class II disposal well and a surface facility.
...This rule applies to a new permit to construct a class II disposal well and a surface facility, a new permit to construct a class II disposal well, a new permit to convert a well to a class II disposal well and construct a surface facility, or a new permit to convert a well to a class II disposal well. A class II disposal well and a surface facility shall be designed, constructed, and operated in a manner that protec... |
|
Rule 1501:9-3-06 | Permit.
...Any person who proposes to construct, convert to, or operate a brine injection well shall submit an application for a permit to the division on a form provided by the division. (A) Permit required. Unless an appropriate application has been approved by the chief and a permit issued by the division, no person shall drill, reopen, deepen, plug back, rework, or use a well for brine injection. In order to evaluate the p... |
|
Rule 1501:9-3-06 | Construction, authorization to operate, and amendments to/of a class II disposal well or surface facility.
...(A) Construction/converion (1) No construction may commence at the well, class II disposal well or class II disposal well and surface facility until a permit is issued. The well shall be constructed in accordance with the requirements established in rule 1501:9-1-08 of the Administrative Code and in accordance with all the following: (a) The well shall be constructed with casing that is mechanically centralized and... |
|
Rule 1501:9-3-07 | Design and operational requirements of a class II disposal well or a surface facility.
...(A) On and after the effective date of this rule, any person who operates a class II disposal well or a surface facility shall comply with all of the operational requirements and standards in this rule, unless specifically exempted in this rule. Compliance with this rule does not eliminate the requirement that a person comply with any other applicable laws. (B) Only brine and other waste substan... |
|
Rule 1501:9-3-08 | Annular disposal.
...(A) Approval required. (1) On and after the effective date of this rule, the chief will not authorize the disposal of brine in any annular space. (2) If the chief approved annular disposal of brine prior to the effective date of this rule, the annular disposal well owner may continue to dispose brine in the already-approved annular space in accordance with paragraphs (B) to (F) of this rule unle... |
|
Rule 1501:9-4-01 | Definitions.
...As used in Chapter 1501:9-4 of the Administrative Code: (A) "Amendment" means a written authorization of the chief to make a revision to a certified oil and gas waste facility. "Amendment" means any of the following: (1) Any substantial alteration in the operational processes at an oil and gas waste facility; (2) Any substantial alteration in the volume of brine or other waste substances th... |
|
Rule 1501:9-4-02 | General Provisions.
...(A) A person may only store, recycle, treat, process or dispose of brine and other waste substances at an oil and gas waste facility in accordance with Chapter 1509. of the Revised Code and rules adopted under it. (B) No person may allow brine or other waste substances at an oil and gas waste facility to migrate into an underground source of drinking water. (C) Not later than one hundred eighty ... |
|
Rule 1501:9-4-04 | Permit to
construct an oil and gas waste facility.
...(A) This rule applies to oil and gas waste facilities. This rule applies to both a long-term and a short-term oil and gas waste facility unless specifically excluded within this rule. An oil and gas waste facility shall be designed, constructed, and operated in a manner that safely supports the proposed operations occurring at the oil and gas waste facility and in a manner that protects public health and safety and p... |
|
Rule 1501:9-4-06 | Design and operational requirements of an oil and gas waste facility.
...(A) On and after the effective date of this rule, any person who stores, recycles, treats, processes, or disposes of brine or other waste substances at an oil and gas waste facility shall comply with all the operational requirements and standards in this rule, unless specifically exempted in this rule. Compliance with this rule does not eliminate the requirement that a person comply with any other applicable laws. ... |
|
Rule 1501:9-5-05 | Permit.
...Any person who proposes to construct, convert to, or operate an enhanced recovery project shall submit an application for a permit to the division on a form provided by the division. (A) Permit required. No person shall conduct an enhanced recovery project unless an appropriate application for such a project has been approved by the chief and a permit issued by the division. In addition to a project permit, no perso... |
|
Rule 1501:9-5-09 | Construction of and conversion to enhanced recovery input wells.
...(A) Each input well permitted after June 1, 1982 shall be constructed in the following manner: (1) Surface casing shall be free of apparent defects and set at least fifty feet below the deepest underground source of water containing less than ten thousand mg/L total dissolved solids or less than five thousand mg/L chlorides, and sealed by circulating cement to the surface under the supervision of the division. In th... |