Ohio Revised Code Search
Section |
---|
Section 1563.33 | Roof control system and plan.
...Each operator shall carry out on a continuing basis a program to improve the roof control system of each coal mine and the means and measures to accomplish such system. The roof and ribs of all active underground roadways, travelways, and working places shall be supported or otherwise controlled adequately to protect persons from falls of the roof or ribs. A roof control plan and revisions thereof suitable to the roo... |
Section 1563.34 | Operator program for improving roof control systems.
...Each operator shall adopt an adequate program for improving roof control systems. This program shall include a roof control plan, provision for the training of miners, a history of all unintentional roof falls, and systematic evaluation of the effectiveness of the roof control system in use. Each operator shall adopt a roof control plan suitable to the roof conditions and the mining system for all underground roadway... |
Section 1563.35 | Criteria or specifications applied to plans.
...The chief of the division of mineral resources management shall approve roof control plans on a mine-by-mine basis in accordance with the criteria or specifications set forth in this section. Additional measures may be required. Roof control plans that do not conform to these criteria or specifications may be approved if the operator satisfies the chief that the resultant roof conditions will provide no less protecti... |
Section 1563.36 | Excessive widths of rooms and entries or faulty pillar recovery methods.
...The method of mining followed in any coal mine shall not expose the miner to unusual dangers from roof falls caused by excessive widths of rooms and entries or faulty pillar recovery methods. (A) The method of mining shall provide widths of openings and pillar dimensions compatible with effective roof control. These widths and dimensions shall be incorporated into the roof control plan submitted for approval. Where... |
Section 1563.37 | Operator to supply roof support materials - roof bolts - testing of danger areas.
...(A) The operator, in accordance with the approved plan, shall provide at or near each working face and at such other locations in the coal mines as the chief of the division of mineral resources management may prescribe an ample supply of suitable materials of proper size with which to secure the roof of all working places in a safe manner. Safety posts, jacks, or other approved devices shall be used to protect the w... |
Section 1563.39 | Precautions when working place approaches completed or abandoned workings.
...When any working place approaches within fifty feet of accurately surveyed completed workings in the same mine, or within two hundred feet of any other abandoned workings, that cannot be inspected and which may contain dangerous accumulations of water or gas, boreholes shall be drilled at least twenty feet in advance of the face, and forty-five degree angle rib holes shall be drilled at least twenty feet deep and not... |
Section 1563.40 | Closing of openings to abandoned mines - closing abandoned vertical shafts.
...The operator shall effectively close or fence all openings to mines abandoned after June 3, 1941, so that persons or animals cannot inadvertently enter therein. Abandoned vertical shafts and other abandoned openings leading to underground workings, which shafts and other openings are abandoned after August 26, 1949, shall be closed within ninety days after abandonment as follows: (A) Vertical shafts shall be comple... |
Section 1563.41 | Sealing off abandoned workings.
...The operator of a mine, before sealing off any abandoned workings, shall obtain the approval of the deputy mine inspector and the chief of the division of mineral resources management. The seals used in sealing off such workings, when approved by the chief, shall be constructed of not less than eighteen-inch concrete or masonry bulkheads effectively anchored to the ceiling, ribs, and floor, except where seals are use... |
Section 1563.42 | Filing of map of abandoned mine.
...The operator of a mine, before the pillars are drawn previous to the abandonment of any part of the mine, shall have a correct map of such part of the mine made, showing its area and workings to the day of the abandonment and the pillars drawn previous to abandonment, and file such map within ninety days after the abandonment of such mine, in the office of the county recorder of the county where such mine is located,... |
Section 1563.43 | When notice to chief required.
...The operator of a mine shall give notice to the chief of the division of mineral resources management when: (A) A change occurs in the name of a mine, in the name of the operator thereof, or in the officers of an incorporated company owning or operating such mine; (B) Work is commenced opening a new shaft, slope, or mine; (C) A mine is abandoned, or the working thereof is discontinued; (D) The working of a mine i... |
Section 1563.45 | Abandoned mines recorded.
...The county recorder, when presented with a map of an abandoned mine by the owner, lessee, or agent thereof, as provided for in section 1563.42 of the Revised Code, shall properly label, file, and preserve such map as a part of the records of the land upon which said mine is located. |
Section 1563.46 | Injunction.
...If the appliances of a mine for the safety of the persons working therein do not conform to this chapter and Chapters 1509., 1561., 1565., and 1567. of the Revised Code, or if the owner, lessee, or agent disregards the requirements of such chapters, on application by the chief of the division of mineral resources management, in the name of the state, any court of competent jurisdiction may enjoin or restrain the owne... |
Section 1563.99 | Penalty.
...Whoever knowingly violates any section of this chapter is guilty of a minor misdemeanor. |
Section 4551.01 | Requiring bill of sale or invoice.
...icle upon any public highway, road, or street in this state for the purpose of transporting five or more cut trees, or one hundred pounds or more of boughs, of any species of pine, spruce, fir, hemlock, or other narrow-leafed or broad-leafed evergreen tree or shrub, shall have upon his person during such transporting a bill of sale or invoice for such trees or boughs signed by the owner or custodian of the lands from... |
Section 4551.02 | Requiring true written statement.
...Whenever any trees or boughs described in section 4551.01 of the Revised Code are being transported within this state by any person other than a person required by said section to have a bill of sale or invoice, a true written statement shall accompany such shipment, which written statement shall set forth: (A) The location of the lands from which such trees or boughs were removed. Such statement of location shall ... |
Section 4551.03 | Demand for proof of ownership.
...ed in the transporting of the evergreen trees or boughs described in section 4551.01 of the Revised Code, except trucks or trailers licensed for and engaged in interstate commerce, and require the operator to produce the bill, invoice, or statement of ownership required by sections 4551.01 and 4551.02 of the Revised Code as evidence of lawful ownership or custody of the cut trees or boughs. Failure to produce upon de... |
Section 4551.04 | Prohibition.
...(A) No person shall transport trees or boughs described in section 4551.01 of the Revised Code in violation of sections 4551.01 to 4551.03 of the Revised Code. (B) Whoever violates this section shall be fined not more than one thousand dollars, imprisoned not more than thirty days, or both. |
Section 4551.05 | Disposition of impounded trees.
...inclusive, of the Revised Code, the cut trees or boughs being transported at the time of the offense may immediately be disposed of at the highest obtainable price, and the money obtained from such sale shall be impounded by the court, pending determination of the ownership of such trees or boughs. If such owners are unknown and cannot be ascertained within thirty days after such sale, or if there is money remaining ... |
Section 4951.01 | Authority to construct street railways.
...Street railways, with single or double tracks, sidetracks, and turnouts, may be constructed or extended within or without, or partly within and partly without, any municipal corporation. Offices, depots, and other necessary buildings for street railways may be constructed. |
Section 4951.02 | Grant of right to construct.
...The right to construct or extend a street railway within or beyond the limits of a municipal corporation may be granted only by its legislative authority by ordinance. The right to construct such street railway without the limits of a municipal corporation may be granted only by the board of county commissioners by an order entered on its journal. The legislative authority or the board may fix the conditions upon whi... |
Section 4951.03 | Grantee not to be released from obligation.
...After a grant to construct or extend a street railway, or the renewal of any such grant, has been made by general or special ordinance or by the order of the board of county commissioners, neither the municipal corporation nor the board shall release a grantee from any obligations or liabilities imposed by the grant or renewal during the term for which such grant or renewal was made. |
Section 4951.04 | Right to occupy tracks of existing companies.
...ouble, or other structure, of existing street railways for more than one eighth of the distance between the termini of the route, as actually constructed, operated, and run over, of the company or person to whom such grant is made. In granting permission to extend existing routes in cities, the cities and companies owning such route shall have all the rights and powers which they possess under existing laws and contr... |
Section 4951.05 | Extension to be constructed as new route.
...No extension of a street railway located wholly outside a city, or of one wherever located, which is built in pursuance of a right obtained from authority other than that of a municipal corporation, shall be made within the limits of such city, except as a new route. |
Section 4951.06 | Written consent of property owners required.
... of the lots and lands abutting on the street or public way along which it is proposed to construct such street railway or extension, and evidence that ordinances of the legislative authority relating to such grant have in all respects been complied with, whether the railway proposed is an extension of an old or the granting of a new route. |
Section 4951.07 | Written consent not required.
...s obtained, on and along any part of a street or public way upon which a street railway has been operated within one year preceding under a grant or renewal of a grant which has expired or within two years will expire or when such a grant is made by the legislative authority of a municipal corporation or the board of county commissioners of a county on and along any part of a street or public way upon the order or fi... |