Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Title
:
Title 55 | Roads-Highways-Bridges
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"","start":1201,"pageSize":25,"sort":"BestMatch","title":"29"}
Results 1,201 - 1,225 of 1,459
Sort Options
Sort Options
Sections
Section
Section 5555.22 | Action by joint board on petition.

...The boards of county commissioners shall meet as a joint board at the time and place designated by the board of the county where the original petition is filed pursuant to section 5555.21 of the Revised Code. The time so designated for the joint meeting shall be within thirty days from the date of the filing of the petition. Such joint board shall determine whether the petition has been signed by the requisite number...

Section 5555.23 | Improvement by joint board without petition.

...The boards of county commissioners of two or more counties, acting as a joint board, may, by a resolution passed by unanimous vote, order the construction, reconstruction, improvement, or repair of any road located in said counties, or extending from one of said counties into or through adjoining counties, or along the line between said counties, and the joint board shall thereupon proceed with the improvement as if ...

Section 5555.24 | Appointment of county engineer by joint board - copies of surveys transmitted to each board.

...After the joint board of county commissioners has granted the improvement, it shall appoint a county engineer of one of the counties interested, who shall make such surveys, plans, profiles, cross sections, estimates, and specifications as are necessary and transmit copies of them to each board interested in said improvement. If a majority of the joint board is unable to agree as to the appointment of an engineer, th...

Section 5555.25 | Method of payment and proportion of costs - notice of assessments - apportionment by director of transportation.

...When a joint board of county commissioners is proceeding upon a petition for a road improvement, the compensation, damages, and expenses of the improvement shall be apportioned and paid in the method specified in the petition, which may be any one of the methods provided by section 5555.41 of the Revised Code. When a joint board acts by unanimous vote and without the filing of a petition, it shall set forth in its re...

Section 5555.26 | Each county may choose different method of apportionment.

...When a petition asking for the construction, reconstruction, improvement, or repair of a road in two or more counties, or along the county line between two or more counties in this state, is filed with the board of county commissioners of any one of said counties, the petitioners are not limited to the statement of a single method of paying the compensation, damages, and expenses of the improvement, but may request i...

Section 5555.27 | Hearing for objections by joint board - notice.

...As soon as the county engineer has transmitted to the several boards of county commissioners copies of the engineer's surveys, plans, profiles, cross sections, estimates, and specifications for the improvement, the joint board of county commissioners shall, except in cases of reconstruction or repair of roads where no lands or property are taken, fix a time and place for hearing objections to said improvement. ...

Section 5555.30 | Decision of joint board as to improvement.

...After all questions relating to compensation and damages have been disposed of, the joint board shall decide whether it will proceed with the improvement, and if it decides to proceed therewith, it shall adopt the surveys, plans, profiles, cross sections, estimates, and specifications for the improvement as reported by the county engineer or with such modifications as the joint board and the engineer agree upon.

Section 5555.31 | Procedure when improvement is in one county but within assessment distance of another.

...When the proposed improvement is wholly within one county but within less than the legal assessment distance of the county line, and a petition is filed asking for such improvement, signed by fifty-one per cent of the persons to be specially assessed therefor, such improvement shall be regarded as joint county improvement, and shall be made in accordance with sections 5555.21 to 5555.30, inclusive, of the Revised Cod...

Section 5555.32 | Joint board may place portion of improvement wholly within one county.

... A joint board of county commissioners has jurisdiction to provide for the construction of a portion a road improvement wholly within one county when it is necessary to avoid some place on the county line where the construction thereof would be unusually expensive or difficult.

Section 5555.33 | Bond issue by each county.

...If bonds are issued in anticipation of the collection of taxes and assessments on account of the improvement, such bonds as are required shall be issued separately by each county to cover its proportion of the costs and expenses of such improvement.

Section 5555.34 | Single county procedure applicable to joint board.

...Sections 5555.01 to 5555.72, inclusive, of the Revised Code relating to improvements wholly within one county shall when applicable apply to improvements authorized by a joint board of county commissioners.

Section 5555.41 | Apportionment of costs.

...The compensation, damages, and expenses of the improvement shall be apportioned and paid in any one of the following methods, as set forth in the petition described in section 5555.03 of the Revised Code: (A) Not less than thirty-five nor more than fifty per cent thereof shall be paid out of the proceeds of any levies for road purposes upon the grand duplicate of all taxable property in the county, or out of any fun...

Section 5555.42 | Application to court if equitable assessment cannot be made.

...A board of county commissioners desiring to construct a county road improvement, and finding that no equitable method of apportioning the compensation, damages, and expenses thereof is provided by section 5555.41 of the Revised Code, or finding that an equitable assessment cannot be made by the use of any of the several assessment areas authorized by said section, may order the county engineer to make a tentati...

Section 5555.43 | All costs may be paid by county - agreement with townships to pay proportion.

...The board of county commissioners, unless acting pursuant to section 5555.022 of the Revised Code, or the joint board of county commissioners, upon a unanimous vote, may order, without a petition, that all of a county's costs for constructing any improvement be paid out of the proceeds of any tax levies for road purposes on the grand duplicate of the county or out of any road improvement fund available for the paym...

Section 5555.44 | Funds from which costs are paid.

...When the compensation, damages, and expenses of an improvement, other than the portion thereof to be specially assessed against benefited real estate, are to be paid in part by the county and in part by the townships in which such improvement is situated, under an agreement between the board of county commissioners and the boards of township trustees entered into under section 5555.41 or 5555.43 of the Revised Code, ...

Section 5555.45 | Assessment of property separated from improvement by canal or railway.

... If property is separated from an improvement by a canal, street or interurban railway, steam railway, or in any other similar manner, such property shall be regarded for the purpose of assessment under the road improvement laws as property abutting upon said improvement. Land owned or occupied by such street or interurban railway or steam railroad and the land lying back thereof shall be assessed on account of said ...

Section 5555.46 | Special duplicate of assessments - collection - installments.

...All assessments, with interest accrued on them, made under sections 5555.01 to 5555.72 of the Revised Code shall be placed by the county auditor upon a special duplicate to be collected as taxes, and the principal of the assessments shall be payable in not more than forty semiannual installments extending over a period of not more than twenty years, as determined by the board of county commissioners. If any assessmen...

Section 5555.47 | Apportionment between owners of life estate and fee - appeal.

...If any lands to be assessed are subject to a life estate, the assessment made therein shall, upon application of the life tenant to the board of county commissioners, be apportioned between the owner of the life estate and the owner of the fee in proportion to the value of their respective estates. Upon the filing of the application, the board shall fix a date for hearing it and cause notice of such hearing to be ser...

Section 5555.48 | Payment of county's share - tax levy.

...The proportion of the compensation, damages, and expenses of the improvement to be paid by the county shall be paid out of any road improvement fund available therefor. For the purpose of providing by taxation a fund for the payment of the county's proportion of the compensation, damages, and expenses of constructing, reconstructing, improving, maintaining, and repairing roads under sections 5555.01 to 5555.72, incl...

Section 5555.49 | Payment of township's share - tax levy.

...For the purpose of providing by taxation a fund for the payment of the proportion of the compensation, damages, and expenses of the improvement to be paid by the townships in which such improvement is situated in whole or in part, the board of county commissioners may levy a tax not exceeding three mills in any one year upon all the taxable property of such townships. Such levy shall be in addition to all other levie...

Section 5555.50 | Procedure for paying expenses applicable to joint county improvement.

...Sections 5555.41 to 5555.49, inclusive, of the Revised Code apply to the proportion of the compensation, damages, and expenses of any improvement to be paid by any county or township if such improvement is authorized and constructed by any joint board of county commissioners, or by agreement entered into between such joint board and the board of township trustees of one or more townships.

Section 5555.51 | Issuing anticipation public obligations for road improvements.

...The board of county commissioners, in anticipation of the collection of taxes, or taxes and assessments, for a road improvement or any part of a road improvement may issue and sell, or incur, public obligations of the county under Chapter 133. of the Revised Code to pay the estimated costs of the improvement. The making of any special assessments referred to in sections 5555.41 to 5555.50 of the Revised Code shall ...

Section 5555.61 | Contract for improvement not to exceed ten per cent above estimates.

... After the board of county commissioners decides to proceed with the improvement, it shall do so in accordance with sections 307.86 to 307.92 of the Revised Code. No contract for any improvement shall be awarded at a price more than twenty per cent in excess of the estimated cost.

Section 5555.66 | Payment on estimates of materials delivered shall not exceed ninety per cent.

...In addition to the estimates provided for by section 153.13 of the Revised Code, the county engineer may, under such conditions as he prescribes, allow and pay to a contractor a sum not exceeding ninety per cent of the value of material delivered by such contractor, and safely stored at a railroad station or siding or other point in the vicinity of the work. When such estimate is allowed, the material on which it is ...

Section 5555.67 | Limitation of time for completion - account of expenditures.

...Each contract let under section 5555.61 of the Revised Code, shall contain a provision to the effect that if such contract is not completed within the time therein fixed, the county engineer shall, after the expiration of the time fixed for the completion of such contract, keep an accurate account of all expenditures for inspection, supervision, and all other similar engineering services in connection with the improv...