Rule 3745-52-263 | Amendment of contingency plan - preparedness, prevention, and emergency procedures for large quantity generators.
The contingency plan shall be reviewed, and immediately amended if necessary, when any of the following occur:
(A) Applicable regulations are revised.
(B) The contingency plan fails in an emergency.
(C) The generator facility changes - in the generator facility's design, construction, operation, maintenance, or other circumstances - in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency.
(D) The list of emergency coordinators changes.
(E) The list of emergency equipment changes.