Rule 4101:14-1-04 | Acceptance tests.

 

All new passenger tramway installations and modifications of existing passenger tramways shall be thoroughly inspected and tested before the system is put into operation for the public. Load test reports for aerial passenger tramways or chair lifts shall be retained by the ski area operator for review by the ski tramway board or its inspector. The inspection and test shall include those items outlined in ANSI B77.1-2017.