Skip to main content
This website publishes administrative rules on their effective dates, as designated by the adopting state agencies, colleges, and universities.

Ohio Administrative Code Search

Busy
 
Keywords
:
poa#3
{"removedFilters":"","searchUpdateUrl":"\/ohio-administrative-code\/search\/update-search","keywords":"poa%233","start":3576,"pageSize":25,"sort":"BestMatch"}
Results 3,576 - 3,600 of 6,179
Sort Options
Sort Options
Rules
Rule
Rule 3745-352-40 | How can I get a waiver from complying with certain requirements of rule 3745-352-20 of the Administrative Code?.

...You must comply with the provisions in this rule. (A) What do I need to do? You can ask for a waiver from complying with paragraphs (A)(1)(b) to (A)(1)(c) and (A)(2) of rule 3745-352-20 of the Administrative Code only if you will be temporarily discontinuing all regulated operations at the facility for a period exceeding three hundred sixty-five days. To request a waiver, you must submit your request within forty-f...

Rule 3745-352-40 | How can I get a waiver from complying with certain requirements of rule 3745-352-20 of the Administrative Code?.

...You must comply with the provisions in this rule. (A) What do I need to do? You can ask for a waiver from complying with paragraphs (A)(1)(b) to (A)(1)(c) and (A)(2) of rule 3745-352-20 of the Administrative Code only if you will be temporarily discontinuing all regulated operations at the facility for a period exceeding three hundred sixty-five days. To request a waiver, you must submit your r...

Rule 3745-400-01 | Definitions.

...As used in this chapter: (A) (1) "Administrative change" means an amendment to an authorizing document that does not constitute a modification or alteration to the processing facility or permit to install for the processing facility. An administrative change is not an action. (2) "Alteration" means a change other than a modification to a processing facility or an administrative change to a permit to install issu...

Rule 3745-400-01 | Definitions.

...As used in this chapter: (A) (1) "Administrative change" means an amendment to an authorizing document that does not constitute a modification or alteration to the processing facility or permit to install for the processing facility. An administrative change is not an action. (2) "Alteration" means a change other than a modification to a processing facility or an administrative change to ...

Rule 3745-400-07 | Facility design requirements and construction specifications.

...(A) The owner or operator shall submit the facility design plan required by this rule as part of the license application. The facility design plan shall contain information in accordance with paragraphs (C) to (E) of this rule and shall be comprised of all the following: (1) The site characterization report as outlined in paragraph (C) of rule 3745-400-09 of the Administrative Code. [Comment: The presentation of na...

Rule 3745-400-07 | Design requirements and construction specifications.

...(A) The owner or operator shall submit the facility design plan as part of the license application. The facility design plan shall contain information in accordance with this rule for the facility and, if applicable, for a co-located processing facility and be comprised of all the following: (1) The site characterization report as outlined in paragraph (C) of rule 3745-400-09 of the Administrative Code. [Comment: T...

Rule 3745-400-08 | Construction and final closure certification.

...(A) Upon completion of construction of an engineered component required by rule 3745-400-07 of the Administrative Code, the owner or operator shall submit to the licensing authority, a construction certification report. The construction certification report shall certify that construction complies with the construction and performance specifications contained in rules 3745-400-07 and 3745-400-10 of the Administrative...

Rule 3745-400-08 | Construction and final closure certification.

...(A) Upon completion of construction of an engineered component specified in rule 3745-400-07 of the Administrative Code, the owner or operator shall submit to the licensing authority a construction certification report certifying that the construction complies with the construction and performance specifications contained in rules 3745-400-07 and 3745-400-10 of the Administrative Code. [Comment: ...

Rule 3745-400-09 | Site characterization.

...(A) Site characterization for employment of the recompacted soil liner requirement. (1) A recompacted soil liner, as described in paragraph (F)(5)(a) of rule 3745-400-07 of the Administrative Code, is required for all unfilled areas in a facility except when the in situ or added geologic material separating the uppermost aquifer system from the bottom of the leachate collection system in unfilled areas meets the cri...

Rule 3745-400-09 | Site characterization.

...(A) Site characterization for employment of the recompacted soil liner requirement. (1) A recompacted soil liner, as described in paragraph (F)(5)(a) of rule 3745-400-07 of the Administrative Code, is required for all unfilled areas in a facility except when the in situ or added geologic material separating the uppermost aquifer system from the bottom of the leachate collection system in unfilled...

Rule 3745-400-11 | Operation of facilities.

...(A) Applicability. The owner or operator shall comply with the requirements and operational criteria specified in this rule until final closure has been completed in accordance with paragraph (G) of rule 3745-400-12 of the Administrative Code, as specified in this paragraph as follows: (1) For active licensed disposal areas, the owner or operator shall comply with all the requirements and ope...

Rule 3745-400-11 | Operations.

...(A) Applicability. The owner or operator shall comply with the requirements and operational criteria specified in this rule until final closure has been completed in accordance with rule 3745-400-12 of the Administrative Code, as specified in this paragraph as follows: (1) For active licensed disposal areas, paragraphs (B)(1) to (B)(17), (C), (D), (E)(1) to (E)(3), (F), (G), (H)(1), and (I) to (S) of this rule. (2)...

Rule 3745-400-12 | Final closure of facilities.

...(A) An owner or operator shall complete closure of a construction and demolition debris facility in a manner that reasonably accomplishes the following: (1) Minimizes the need for maintenance at the facility. (2) Prevents the failure of final slopes. (3) Protects public health and safety and the environment. (4) Does not create a nuisance or fire hazard. (5) Does not cause or contribute to air or water pollutio...

Rule 3745-400-12 | Final closure.

...(A) The owner or operator shall complete closure in a manner that reasonably accomplishes the following: (1) Minimizes the need for maintenance. (2) Prevents the failure of final slopes. (3) Protects public health and safety and the environment. (4) Does not create a nuisance or fire hazard. (5) Does not cause or contribute to air or water pollution. (6) Minimizes erosion; infiltration of surface water; produc...

Rule 3745-400-13 | Financial assurance for construction and demolition debris facility final closure.

...[Comment: Financial assurance for construction and demolition debris facilities includes financial assurance for final closure as required by this rule and financial assurance for post-closure care as required by rule 3745-400-18 of the Administrative Code.] (A) The owner or operator of a construction and demolition debris facility shall establish and maintain financial assurance for final closure of t...

Rule 3745-400-13 | Financial assurance for final closure.

...[Comment: Financial assurance for construction and demolition debris facilities includes financial assurance for final closure as required by this rule and financial assurance for post-closure care as required by rule 3745-400-18 of the Administrative Code.] (A) Financial assurance procedures. (1) Construction and demolition debris facility and co-located processing facility. The owner or operator of a construction...

Rule 3745-400-13 | Financial assurance for construction and demolition debris facility and construction and demolition debris processing facility final closure.

...[Comment: Financial assurance for construction and demolition debris facilities includes financial assurance for final closure as required by this rule and financial assurance for post-closure care as required by rule 3745-400-18 of the Administrative Code.] (A) Financial assurance procedures. (1) Construction and demolition debris facility. The owner or operator of a construction and demolition debri...

Rule 3745-400-14 | Wording of the financial instruments.

...(A) Trust agreement. (1) The trust agreement for the trust fund specified in paragraph (B) of rule 3745-400-13 of the Administrative Code and the trust fund agreement for the trust fund specified in paragraph (B) of rule 3745-400-18 of the Administrative Code shall be worded as follows on forms prescribed by the director, except that instructions in brackets are to be replaced with the relevant i...

Rule 3745-400-14 | Wording of the financial assurance instruments.

...(A) Trust agreement. (1) The trust agreement for the trust fund specified in paragraph (B) of rule 3745-400-13 of the Administrative Code and the trust fund agreement for the trust fund specified in paragraph (B) of rule 3745-400-18 of the Administrative Code shall be worded as follows on forms prescribed by the director, except that instructions in brackets are to be replaced with the relevant i...

Rule 3745-400-15 | Modifications and exemptions.

...(A) Facility modifications. The following shall be deemed a modification to a construction and demolition debris facility: (1) Any extension beyond the approved limits of debris placement specified in the valid operating license. (2) Any extension beyond the active licensed disposal area specified in the valid operating license. (3) Any other substantial change to the approved facility ...

Rule 3745-400-15 | Modifications and exemptions.

...(A) Facility modifications. The following shall be deemed a modification to a construction and demolition debris facility: (1) Any extension beyond the approved limits of debris placement specified in the valid operating license; or (2) Any extension beyond the active licensed disposal area specified in the valid operating license; or (3) Any other substantial change to the approved facility design plan contained ...

Rule 3745-400-18 | Financial assurance for post-closure care of construction and demolition debris facilities.

...(A) The owner or operator of a construction and demolition debris facility shall establish and maintain financial assurance for post-closure care of the facility as required by this rule. Financial assurance may be established and maintained through the use of one of the options specified in paragraphs (B) to (F) of this rule, unless it is demonstrated to the satisfaction of the director or health...

Rule 3745-400-21 | Construction and demolition debris facility - leachate sampling and ground water monitoring parameter list.

...This rule contains the common names of parameters that are widely used in government regulation, scientific publications, and commerce. However, synonyms may exist for many parameters. The chemical abstract service registry number (CAS RN) for each parameter has been provided. (A) Metals and cyanide. The metals include all species in leachate or ground water that contain the element and laboratory analysis shall be ...

Rule 3745-400-50 | Processing facility permit to install.

...(A) Permit to install application. (1) A person proposing to establish, maintain, or modify a processing facility shall submit to the permitting authority a permit to install application that contains the information specified in this rule so that the permitting authority can determine whether the criteria set forth in rules 3745-400-52 and 3745-400-54 of the Administrative Code are satisfied. Th...

Rule 3745-400-52 | Processing facility design requirements.

...Processing facility design plan. The processing facility design plan shall be signed and sealed by a professional engineer registered in Ohio. All drawings, calculations, and narrative shall appear on plan sheets with minimum dimensions of twenty-four inches by thirty-six inches. If narrative is necessary to explain the drawings or calculations, the narrative shall appear on the plan sheet with that drawing...