Skip to main content
Back To Top Top Back To Top
This website publishes administrative rules on their effective dates, as designated by the adopting state agencies, colleges, and universities.

Ohio Administrative Code Search

Busy
 
Keywords
:
support@lawyer-1.online
{"removedFilters":"","searchUpdateUrl":"\/ohio-administrative-code\/search\/update-search","keywords":"support%40lawyer-1.online","start":6476,"pageSize":25,"sort":"BestMatch"}
Results 6,476 - 6,500 of 12,148
Sort Options
Sort Options
Rules
Rule
Rule 3745-400-08 | Construction and final closure certification.

...(A) Upon completion of construction of an engineered component specified in rule 3745-400-07 of the Administrative Code, the owner or operator shall submit to the licensing authority a construction certification report certifying that the construction complies with the construction and performance specifications contained in rules 3745-400-07 and 3745-400-10 of the Administrative Code. [Comment: ...

Rule 3745-400-09 | Site characterization.

...(A) Site characterization for employment of the recompacted soil liner requirement. (1) A recompacted soil liner, as described in paragraph (F)(5)(a) of rule 3745-400-07 of the Administrative Code, is required for all unfilled areas in a facility except when the in situ or added geologic material separating the uppermost aquifer system from the bottom of the leachate collection system in unfilled areas meets the cri...

Rule 3745-400-09 | Site characterization.

...(A) Site characterization for employment of the recompacted soil liner requirement. (1) A recompacted soil liner, as described in paragraph (F)(5)(a) of rule 3745-400-07 of the Administrative Code, is required for all unfilled areas in a facility except when the in situ or added geologic material separating the uppermost aquifer system from the bottom of the leachate collection system in unfilled...

Rule 3745-400-10 | Ground water monitoring.

...(A) Ground water monitoring well system. The owner or operator of any facility disposing of debris on or after September 30, 1996, shall have a ground water monitoring well system unless the limits of debris placement meet the criteria in paragraph (B) of rule 3745-400-09 of the Administrative Code. Ground water monitoring shall be implemented not later than required by paragraph (R) of rule 3745-...

Rule 3745-400-11 | Operation of facilities.

...(A) Applicability. The owner or operator shall comply with the requirements and operational criteria specified in this rule until final closure has been completed in accordance with paragraph (G) of rule 3745-400-12 of the Administrative Code, as specified in this paragraph as follows: (1) For active licensed disposal areas, the owner or operator shall comply with all the requirements and ope...

Rule 3745-400-11 | Operations.

...(A) Applicability. The owner or operator shall comply with the requirements and operational criteria specified in this rule until final closure has been completed in accordance with rule 3745-400-12 of the Administrative Code, as specified in this paragraph as follows: (1) For active licensed disposal areas, paragraphs (B)(1) to (B)(17), (C), (D), (E)(1) to (E)(3), (F), (G), (H)(1), and (I) to (S) of this rule. (2)...

Rule 3745-400-12 | Final closure of facilities.

...(A) An owner or operator shall complete closure of a construction and demolition debris facility in a manner that reasonably accomplishes the following: (1) Minimizes the need for maintenance at the facility. (2) Prevents the failure of final slopes. (3) Protects public health and safety and the environment. (4) Does not create a nuisance or fire hazard. (5) Does not cause or contribute to air or water pollutio...

Rule 3745-400-12 | Final closure.

...(A) The owner or operator shall complete closure in a manner that reasonably accomplishes the following: (1) Minimizes the need for maintenance. (2) Prevents the failure of final slopes. (3) Protects public health and safety and the environment. (4) Does not create a nuisance or fire hazard. (5) Does not cause or contribute to air or water pollution. (6) Minimizes erosion; infiltration of surface water; produc...

Rule 3745-400-13 | Financial assurance for construction and demolition debris facility final closure.

...[Comment: Financial assurance for construction and demolition debris facilities includes financial assurance for final closure as required by this rule and financial assurance for post-closure care as required by rule 3745-400-18 of the Administrative Code.] (A) The owner or operator of a construction and demolition debris facility shall establish and maintain financial assurance for final closure of t...

Rule 3745-400-13 | Financial assurance for final closure.

...[Comment: Financial assurance for construction and demolition debris facilities includes financial assurance for final closure as required by this rule and financial assurance for post-closure care as required by rule 3745-400-18 of the Administrative Code.] (A) Financial assurance procedures. (1) Construction and demolition debris facility and co-located processing facility. The owner or operator of a construction...

Rule 3745-400-13 | Financial assurance for construction and demolition debris facility and construction and demolition debris processing facility final closure.

...[Comment: Financial assurance for construction and demolition debris facilities includes financial assurance for final closure as required by this rule and financial assurance for post-closure care as required by rule 3745-400-18 of the Administrative Code.] (A) Financial assurance procedures. (1) Construction and demolition debris facility. The owner or operator of a construction and demolition debri...

Rule 3745-400-14 | Wording of the financial instruments.

...(A) Trust agreement. (1) The trust agreement for the trust fund specified in paragraph (B) of rule 3745-400-13 of the Administrative Code and the trust fund agreement for the trust fund specified in paragraph (B) of rule 3745-400-18 of the Administrative Code shall be worded as follows on forms prescribed by the director, except that instructions in brackets are to be replaced with the relevant i...

Rule 3745-400-14 | Wording of the financial assurance instruments.

...(A) Trust agreement. (1) The trust agreement for the trust fund specified in paragraph (B) of rule 3745-400-13 of the Administrative Code and the trust fund agreement for the trust fund specified in paragraph (B) of rule 3745-400-18 of the Administrative Code shall be worded as follows on forms prescribed by the director, except that instructions in brackets are to be replaced with the relevant i...

Rule 3745-400-15 | Modifications and exemptions.

...(A) Facility modifications. The following shall be deemed a modification to a construction and demolition debris facility: (1) Any extension beyond the approved limits of debris placement specified in the valid operating license. (2) Any extension beyond the active licensed disposal area specified in the valid operating license. (3) Any other substantial change to the approved facility ...

Rule 3745-400-15 | Modifications and exemptions.

...(A) Facility modifications. The following shall be deemed a modification to a construction and demolition debris facility: (1) Any extension beyond the approved limits of debris placement specified in the valid operating license; or (2) Any extension beyond the active licensed disposal area specified in the valid operating license; or (3) Any other substantial change to the approved facility design plan contained ...

Rule 3745-400-16 | Post-closure care of a construction and demolition debris facility.

...(A) Unless the owner or operator of the construction and demolition debris facility has complied with paragraph (B)(1) of this rule, an owner or operator of a facility that has accepted construction and demolition debris in calendar year 2006 or later shall conduct post-closure care activities at the construction and demolition debris facility upon the licensing authority's written concurrence wit...

Rule 3745-400-18 | Financial assurance for post-closure care of construction and demolition debris facilities.

...(A) The owner or operator of a construction and demolition debris facility shall establish and maintain financial assurance for post-closure care of the facility as required by this rule. Financial assurance may be established and maintained through the use of one of the options specified in paragraphs (B) to (F) of this rule, unless it is demonstrated to the satisfaction of the director or health...

Rule 3745-400-20 | Leachate sampling and analysis and additional requirements to monitor ground water for leachate parameters.

...(A) Leachate sampling and analysis. Throughout the operation, closure, and post-closure care, the owner or operator shall do the following: (1) Sample and test leachate in accordance with the following unless the facility was licensed and operating on December 22, 2005, and was not required to have a leachate monitoring system on that date. For the purposes of this rule, a "leachate monitorin...

Rule 3745-400-21 | Construction and demolition debris facility - leachate sampling and ground water monitoring parameter list.

...This rule contains the common names of parameters that are widely used in government regulation, scientific publications, and commerce. However, synonyms may exist for many parameters. The chemical abstract service registry number (CAS RN) for each parameter has been provided. (A) Metals and cyanide. The metals include all species in leachate or ground water that contain the element and laboratory analysis shall be ...

Rule 3745-400-50 | Processing facility permit to install.

...(A) Permit to install application. (1) A person proposing to establish, maintain, or modify a processing facility shall submit to the permitting authority a permit to install application that contains the information specified in this rule so that the permitting authority can determine whether the criteria set forth in rules 3745-400-52 and 3745-400-54 of the Administrative Code are satisfied. Th...

Rule 3745-400-56 | Financial assurance for final closure of processing facilities.

...(A) Final closure cost estimate. The owner or operator of a processing facility shall prepare a written final closure cost estimate calculated in current dollars that is not less than the sum of the following, adjusted as provided in paragraphs (C) and (D) of this rule: (1) A fixed amount calculated as follows: (a) For a processing facility with a horizontal limits of construction and demolition...

Rule 3745-400-57 | Three year transition for final closure financial assurance for construction and demolition debris processing facilities.

...(A) Notwithstanding paragraph (B)(1) of rule 3745-400-56 of the Administrative Code, the owner or operator of a processing facility for the license year 2023 may use a three year transition period for funding financial assurance by submitting a written notice each year of the transition period that complies with the following: (1) The initial written notice is submitted to the licensing authority...

Rule 3745-400-58 | Processing facility operations.

...(A) The owner or operator of a processing facility shall comply with this rule until final closure has been deemed complete in accordance with rule 3745-400-60 of the Administrative Code. (B) Construction requirements for processing facility components. Prior to acceptance of construction and demolition debris, the owner or operator of a processing facility shall construct the processing faci...

Rule 3745-400-60 | Final closure of a processing facility.

...(A) The owner or operator of a processing facility shall conduct final closure when any of the following occur: (1) The owner or operator of a processing facility declares to the licensing authority in writing that the processing facility will cease accepting construction and demolition debris. (2) The permit to install issued for the processing facility expires, and no further permit to ins...

Rule 3745-500-02 | General administration- definitions.

...As used in this chapter and any chapter making these definitions applicable, terms in this rule are defined as follows: (A) (1) "Administrative change" means an amendment to an authorizing document that does not constitute a modification or alteration to the facility or permit to install for the facility. An administrative change is not an action. (2) "Alteration" means a change to a facility f...