Engineers estimate
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"Engineers+estimate","start":1,"pageSize":25,"sort":"BestMatch","title":""}
Results 1 - 25 of 210
Sort Options
Sort Options
Sections
Section
Section 5555.06 | Resolution by board - plans by county engineer.

...rveys, plans, profiles, cross sections, estimates of cost, and specifications for the improvement, together with an estimated assessment, based upon the estimates of cost upon the real estate to be charged therewith, of such part of the estimated damages and expenses of such improvement as are to be specially assessed. Such estimated assessment shall be according to the benefits which will result to such real estate....

Section 6131.15 | Schedule of assessments.

... bounds survey. (2) The amount of the estimated assessment to be assessed to each tract of land. An assessment shall not be less than ten dollars. The total amount of the estimated assessments, including the total estimated assessments allocated to public corporations and the state, shall equal the estimated cost of the proposed improvement. (3) An explanation of each assessment that is for purposes other than dr...

Section 5543.02 | Annual report.

...ounty roads, bridges, and culverts, and estimate the probable amount of funds required to maintain and repair or to construct any new roads, bridges, or culverts required within the county. The engineer, on or before the first day of June in each year, shall make an annual estimate for the board of township trustees of each township, setting forth the amount required by the township for the construction, reconstruct...

Section 5573.01 | Resolution for road improvement.

...rveys, plans, profiles, cross sections, estimates, and specifications as are required for the improvement. If an independent professional engineer is hired, the county engineer shall review all of the independent professional engineer's plans for improvements and provide the board of township trustees with comments on those plans within ten working days after receiving them. The county engineer shall monitor all of ...

Section 6131.14 | County engineer's duties.

...gs of the improvement; (5) Prepare an estimate of the cost of the improvement, which shall include actual construction cost, the cost of engineering, the cost of the first year maintenance, and the cost of notices, publication, and other incidental expenses. If applicable, the engineer may recommend the maintenance district in which the improvement shall be placed. The assessment of the improvement for maintenance ...

Section 504.19 | Adopting general plan of water supply or sewer services.

...are detailed plans, specifications, and estimates of the cost of the improvements, together with a tentative assessment of the cost based on the estimates. The tentative assessment shall be for the information of property owners and shall not be certified to the county auditor for collection. The detailed plans, specifications, estimates of cost, and tentative assessment, as prepared by the engineer and approved by ...

Section 6137.03 | Annual drainage improvement maintenance assessment.

... owners apportioned on the basis of the estimated benefits for all costs of the improvement. (2) An assessment shall represent such a percentage of the estimated benefits as is estimated by the engineer and found adequate by the board or joint board to effect the purpose of section 6137.02 of the Revised Code, except that at no time shall a maintenance fund have an unencumbered balance greater than twenty per cent...

Section 1514.02 | Surface or in-stream mining permit - application contents.

...f any coal, sought to be extracted, an estimate of the annual production rates for each mineral and coal, and a description of the land upon which the applicant proposes to engage in a surface or in-stream mining operation, which description shall set forth the names of the counties, townships, and municipal corporations, if any, in which the land is located; the location of its boundaries; and a description o...

Section 153.12 | Awarding and executing contract.

...estimates of expenses for architects or engineers, exceed in the aggregate the amount authorized by law. The unit or lump sum price stated in the contract shall be used in determining the amount to be paid and shall constitute full and final compensation for all the work. Partial payment to the contractor for work performed under the lump sum price shall be based on a schedule prepared by the contractor and app...

Section 5559.14 | Payment on contract - estimates.

...ll be made as the work progresses, upon estimates made by the county engineer. No payment on account of the contract for any improvement, shall, before the completion of such contract, exceed ninety per cent of the value of the work performed to the date of such payment, and, except as provided in this section and section 5559.15 of the Revised Code, ten per cent of the value of the work performed shall be held until...

Section 6131.40 | Acceptance of bids.

... for any part or thing that exceeds the estimate of the engineer unless only by such acceptance can a contract for the completion of an entire improvement be let for less than the aggregate estimate of the total improvement. If it is found that all bids for work and material, or all bids for any separate part of work and material, are in excess of the estimates reported by the engineer, the board shall order the rea...

Section 723.52 | Estimate of cost of construction by force account - competitive bidding - rejection of bids.

...e authority in a village, shall make an estimate of the cost of such work using the force account project assessment form developed by the auditor of state under section 117.16 of the Revised Code. In municipal corporations having an engineer, or an officer having a different title but the duties and functions of an engineer, the estimate shall be made by the engineer or other officer. Where the total estimated cost ...

Section 1513.07 | Coal mining and reclamation permit - application or renewal - reclamation plan.

...cation and quality of aquifers; and the estimated elevation of the water table. Registered surveyors shall be allowed to perform all plans, maps, and certifications under this chapter as they are authorized under Chapter 4733. of the Revised Code. (ii) A statement of the quality and locations of subsurface water. The chief shall provide by rule the number of locations to be sampled, frequency of collection, and par...

Section 5543.19 | Construction or reconstruction by force account.

...ngineer shall first cause to be made an estimate of the cost of such work using the force account project assessment form developed by the auditor of state under section 117.16 of the Revised Code. When the total estimated cost of the work exceeds seventy thousand dollars per mile, the county commissioners shall invite and receive competitive bids for furnishing all the labor, materials, and equipment necessary to co...

Section 307.041 | Contracts to analyze reducing energy consumption in buildings owned by county.

...e buildings owned by that county; (2) Estimates of all costs of those installations, those modifications, or that remodeling, including costs of design, engineering, installation, maintenance, and repairs; (3) Estimates of the amounts by which energy consumption could be reduced; (4) The interest rate used to estimate the costs of any energy conservation measures that are to be financed; (5) The average syste...

Section 3375.405 | Evaluating library buildings for energy conservation; energy conservation report; implementation.

...ergy consumption in the buildings; (2) Estimates of all costs of the recommended installations, modifications, or remodeling, including costs of design, engineering, installation, maintenance, and repair; (3) Estimates of the amounts by which energy consumption could be reduced; (4) The interest rate used to estimate the costs of any energy conservation measures that are to be financed by the library; (5) Th...

Section 6103.05 | General plan of water supply.

... detailed plans, specifications, and an estimate of cost for the improvement, together with a tentative assessment of the cost based on the estimate. The tentative assessment shall be for the information of property owners and shall not be levied or certified to the county auditor for collection. The detailed plans, specifications, estimate of cost, and tentative assessment, if approved by the board, shall be c...

Section 6117.06 | General plan of sewerage or drainage.

... detailed plans, specifications, and an estimate of cost for the improvement, together with a tentative assessment of the cost based on the estimate. The tentative assessment shall be for the information of property owners and shall not be levied or certified to the county auditor for collection. The detailed plans, specifications, estimate of cost, and tentative assessment, if approved by the board, shall be c...

Section 717.02 | Installment payment contracts for energy conservation measures.

...rgy consumption in the buildings; (2) Estimates of all costs of the recommended installations, modifications, or remodeling, including costs of design, engineering, installation, maintenance, and repair; (3) Estimates of the amounts by which energy consumption could be reduced; (4) The interest rate used to estimate the costs of any energy conservation measures that are to be financed by the municipal corporati...

Section 1521.06 | Construction permits for dams or levees required; exceptions.

...ecifications, including a detailed cost estimate, for the proposed construction, prepared by a registered professional engineer, together with any filing fee specified by rules adopted by the chief in accordance with division (I) of this section and the bond or other security required by section 1521.061 of the Revised Code, shall be filed with the chief. The detailed estimate of the cost shall include all costs asso...

Section 164.05 | Director of the Ohio public works commission duties.

...shall not exceed ninety per cent of the estimated total cost of the capital improvement project. Grants approved for new or expanded infrastructure shall not exceed fifty per cent of the estimated cost of the new or expansion elements of the capital improvement project. A local subdivision share of the estimated cost of a capital improvement may consist of any of the following: (1) The reasonable value, as determin...

Section 345.06 | Appointment of board of trustees prior to vote of electors.

... levy. Such board may call upon county engineers, city engineers, and other agencies of the appropriate subdivision to assist such board in preparing its proposals for such war memorial. The taxing authority of the township, county, or municipal corporation may appropriate such amounts as are reasonably necessary to defray the preliminary expenses of such board incurred in hiring architects, engineers, and other pe...

Section 4906.211 | Decommissioning plan requirements and estimated costs.

...ity facility ceases operation; (3) An estimate of the full costs of decommissioning the utility facility, including the proper disposal of all facility components and restoration of the land on which the facility is located to its pre-construction state. The estimate shall not take into account the salvage value of any materials from the facility.

Section 5543.17 | Avoiding closing to traffic at any one time entire width of highway or bridge.

...rveys, plans, profiles, cross sections, estimates, and specifications for any county, township, or district road improvement, or plans for the construction, improvement or repair of any bridge or culvert, determine whether the making of the improvement will require the closing to traffic of such highway, bridge, or culvert. The engineer shall, whenever practicable, so prepare the plans and specifications for an impro...

Section 5555.67 | Limitation of time for completion - account of expenditures.

...penditures shall be retained out of any estimates due or to become due to such contractor. When the engineer allows an estimate to any contractor after the time fixed in the contract for the completion of the improvement, such engineer shall deduct from such estimate any expense for supervision, inspection, or other similar engineering services incurred after the date set for the completion of such contract. The cont...