Ohio Revised Code Search
Section |
---|
Section 5559.10 | Estimated assessment - notice - hearing.
...gineer shall make, upon actual view, an estimated assessment upon the real estate to be charged therewith, of the compensation, damages, and costs of an improvement as provided by section 5559.02 of the Revised Code. Such estimated assessment shall be according to the benefit which will result to the real estate. In making such assessment the engineer may take into consideration any previous special assessments... |
Section 5573.10 | Estimated assessment on real estate.
...gineer shall make, upon actual view, an estimated assessment, upon the real estate to be charged, of such part of the compensation, damages, and costs of such improvement as is to be specially assessed. Such assessment shall be according to the benefits which will result to the real estate. In making such assessment the engineer may take into consideration any previous special assessment made upon such real estate fo... |
Section 5575.01 | Maintenance and repair of roads by contract or force account.
...se to be made by the county engineer an estimate of the cost of the work, which estimate shall include labor, material, freight, fuel, hauling, use of machinery and equipment, and all other items of cost. If the board finds it in the best interest of the public, it may, in lieu of constructing the road by contract, proceed to construct the road by force account. Except as otherwise provided under sections 505.08 and ... |
Section 5727.75 | Exemption on tangible personal property and real property of certain qualified energy projects.
...f development, whichever is greater. To estimate the number of employees to be employed in the construction or installation of an energy project, the director shall use a generally accepted job-estimating model in use for renewable energy projects, including but not limited to the job and economic development impact model. The director may adjust an estimate produced by a model to account for variables not accounted ... |
Section 6103.02 | Powers of county commissioners regarding public water supply.
...ixes water rates or charges may render estimated bills periodically, provided that at least quarterly it shall schedule an actual reading of each customer's meter so as to render a bill for the actual amount shown by the meter reading to be due, with credit for prior payments of any estimated bills submitted for any part of the billing period, except that estimated bills may be rendered if a customer's meter ... |
Section 6131.16 | Notice of assessments and final hearing.
... all of the following: (1) An owner's estimated assessment, the estimated damages, if any, and of any compensation for land or other property necessary to be taken on each tract of land owned by the owner, as estimated and described in the schedules; (2) The date, time, and location of the final hearing by the board on the report of the engineer and on the proceedings for the improvement; (3) A statement that a... |
Section 122.09 | Transformational mixed use development tax credit.
... of the amount of state and local taxes estimated to be derived from economic activity occurring within the project site, but excluding any other phases of the development project for developments completed in phases, during the completion period minus the amount of such taxes that are estimated to be derived from such economic activity in that site during the same period if the transformational mixed use development... |
Section 123.01 | Powers and duties.
...y include attorneys, financial experts, engineers, and other necessary experts. The department shall review the development plans and may enter into a lease if it finds all of the following: (a) The best interests of the state will be promoted by entering into a lease with the developer; (b) The development plans are satisfactory; (c) The developer has established the developer's financial responsibility and... |
Section 133.06 | Net indebtedness of school district.
... (b) The projected needs; (c) The estimated cost of permanent improvements proposed to meet such projected needs. (3) The director of education and workforce shall certify the district as an approved special needs district if the director finds both of the following: (a) The district does not have available sufficient additional funds from state or federal sources to meet the projected needs. (b) The p... |
Section 1514.03 | Annual report.
... acres affected and the number of acres estimated to be affected during the next year of operation. An annual report is not required to be filed if a final report is filed in lieu thereof. Each annual report for a surface mining operation shall include a progress map indicating the location of areas of land affected during the period of the report and the location of the area of land estimated to be affected during ... |
Section 153.01 | Architect must submit accurate plans, estimates, bills of materials, and details to scale.
...lled or material supplied therefor, the estimated cost of which amounts to two hundred thousand dollars or more, or the amount determined pursuant to section 153.53 of the Revised Code or more, each officer, board, or other authority upon which devolves the duty of constructing, erecting, altering, or installing the same, referred to in sections 153.01 to 153.60 of the Revised Code as the public authority, shall caus... |
Section 3745.11 | Fees.
...e one-hundredths of one per cent of the estimated project cost through June 30, 2028, and a nonrefundable application fee of one hundred dollars plus two-tenths of one per cent of the estimated project cost on and after July 1, 2028, except that the total fee shall not exceed fifteen thousand dollars through June 30, 2028, and five thousand dollars on and after July 1, 2028. The fee shall be paid at the time the appl... |
Section 4981.11 | Bond proceedings definitions.
...and expenses of attorneys, accountants, engineers, and consultants and the costs and expenses of preparing, printing, and delivering any documents or instruments required to be delivered by any person, qualifying subdivision, or local or regional transportation authority under its participation agreement with the commission. (M) "Person" means any natural person, partnership, joint venture, corporation, foreign or d... |
Section 5525.15 | Cost estimates may be confidential.
...he bid opening, the official engineer's estimate of cost of any project to be constructed by the department of transportation shall be confidential information. After the bid opening, only the total official engineer's estimate of cost may be published. The unit price components and the estimate of cost of any particular item of work involved therein shall be kept and regarded by the director and all the dire... |
Section 5555.07 | Copies of surveys, plans, and estimates transmitted to board - notice, hearing.
...veys, plans, profiles, cross sections, estimates of costs, and specifications for the improvement and estimated assessments upon lands benefited thereby. Thereupon such board shall file such copies in its office for the inspection and examination of all persons interested. Except in a case involving the improvement of a public road in which no land or property is taken or assessed, the board shall publish in a... |
Section 5557.07 | Proceedings when greater width desired by municipal corporation.
...rveys, plans, profiles, cross sections, estimates, and specifications for improving such road or part thereof to an additional width. The estimates for the improvement shall set forth the probable cost of so much of the improvement as is made necessary by the proposed increase in width. After such surveys, plans, profiles, cross sections, estimates, and specifications have been completed by the engineer he shall fil... |
Section 5559.05 | County road improvement.
...rveys, plans, profiles, cross sections, estimates, and specifications as are required for such improvement. Only such storm sewers may be included in plans as are needed solely for the drainage of the street to be improved and of the lots and lands to be specially assessed for the improvement. The board may order the engineer to make alternate surveys, plans, profiles, cross sections, estimates, and specifications, ... |
Section 5559.06 | Copies of plans - notice of hearing.
...veys, plans, profiles, cross sections, estimates, and specifications for an improvement under section 5559.02 of the Revised Code by the county engineer, the engineer shall transmit to the board of county commissioners copies of such surveys, plans, profiles, cross sections, estimates, and specifications. The board shall then publish, in a newspaper of general circulation within the county, once a week for two... |
Section 6137.112 | Permanent base review of improvements; estimation of construction cost.
...oard may request the county engineer to estimate the construction cost of the improvement if that improvement were to be constructed at the time of the permanent assessment base review. Not less than thirty days prior to a hearing at which the board will consider the estimate as the construction cost of the improvement, the clerk of the board shall send to each owner that would be affected a notice by certified mail,... |
Section 123.21 | Authority of the commission.
...specifications, bills of materials, and estimates of cost for any projects, improvements, or public buildings to be constructed by state agencies that may be authorized by legislative appropriations or any other funds made available therefor, provided that the construction of the projects, improvements, or public buildings is a statutory duty of the commission. This section does not require the independent employment... |
Section 1509.06 | Application for permit to drill, reopen, convert, or plug back a well.
... of the owner's knowledge, the proposed estimated rate and volume of the water withdrawal for the production operations. If recycled water will be used in the production operations, the owner shall provide the estimated volume of recycled water to be used. The owner shall submit to the chief an update of any of the information that is required by division (A)(8)(a) of this section if any of that information changes b... |
Section 1513.16 | Performance standards.
...re occurrence of the pollution, and the estimated cost of abating the pollution. The chief shall notify the permittee in writing of the decision to release or not to release all or part of the performance security within sixty days after the filing of the request if no public hearing is held pursuant to division (F)(6) of this section or, if there has been a public hearing held pursuant to division (F)(6) of this sec... |
Section 153.693 | Evaluation of design-build firms.
...guaranteed maximum price, including the estimated level of design on which such guaranteed maximum price is based; (g) The form of the design-build services contract; (h) Except for projects under division (A)(2) of this section, a request for a pricing proposal that shall be divided into a design services fee and a preconstruction and design-build services fee. The pricing proposal of each design-build firm shal... |
Section 156.02 | Contract for report containing analysis and recommendations pertaining to implementation of energy conservation measures.
...e institution. The report shall include estimates of all costs of such installations, including the costs of design, engineering, installation, maintenance, repairs, and debt service, and estimates of the energy, water, or wastewater cost savings, operating cost savings, and avoided capital costs created. |
Section 315.08 | Duties of county engineer.
...are all plans, specifications, details, estimates of cost, and submit forms of contracts for the construction, maintenance, and repair of all bridges, culverts, roads, drains, ditches, roads on county fairgrounds, and other public improvements, except buildings, constructed under the authority of any board within and for the county. The engineer shall not be required to prepare plans, specifications, details, estimat... |