Ohio Revised Code Search
Section |
---|
Section 1506.32 | Application for salvage permit for submerged watercraft or aircraft.
...ins all of the following information: (1) The name and address of the applicant; (2) The name, if known, of the watercraft or aircraft on, in, or around which the operation is proposed and a current photograph or drawing of the watercraft or aircraft, if available; (3) The location of the abandoned property to be recovered, altered, salvaged, or destroyed and the depth of water in which it may be found; (4) A des... |
Section 1506.35 | Revoking salvage permit.
...d or revoke, in accordance with Chapter 119. of the Revised Code, a permit issued under section 1506.32 of the Revised Code if the permit holder has done either of the following: (1) Failed to comply with sections 1506.30 to 1506.36 of the Revised Code, any rules adopted under those sections, or any provision or condition of the holder's permit; (2) Damaged abandoned property other than in accordance with the provi... |
Section 1506.44 | Agreements for loans for erosion control structures.
...ho has received a permit under section 1506.40 of the Revised Code to construct an erosion control structure in that coastal erosion area. The board shall enter into an agreement with the person that complies with all of the following requirements: (1) The agreement shall identify the person's real property for which the erosion control structure is being constructed and shall include a legal description of t... |
Section 1509.021 | Surface locations of new wells.
...On and after June 30, 2010, all of the following apply: (A) The surface location of a new well or a tank battery of a well shall not be within one hundred fifty feet of an occupied dwelling that is located in an urbanized area unless the owner of the land on which the occupied dwelling is located consents in writing to the surface location of the well or tank battery of a well less than one hundred fifty feet... |
Section 1509.03 | Administrative rules.
..., and amend, in accordance with Chapter 119. of the Revised Code, rules for the administration, implementation, and enforcement of this chapter. The rules shall include an identification of the subjects that the chief shall address when attaching terms and conditions to a permit with respect to a well and production facilities of a well that are located within an urbanized area or with respect to a horizontal well an... |
Section 1509.04 | Enforcement - injunction against violation.
...ce officer, as defined in section 2935.01 of the Revised Code, may arrest for violations of this chapter involving transportation of brine by vehicle. The enforcement authority of the chief includes the authority to issue compliance notices and to enter into compliance agreements. (B)(1) The chief or the chief's authorized representative may issue an administrative order to a person that is subject to this chapter... |
Section 1509.062 | Temporary inactive well status.
...(A)(1) The owner of a well that has not been completed, a well that has not produced within one year after completion, an existing well that is not a horizontal well and that has no reported production for two consecutive reporting periods as reported in accordance with section 1509.11 of the Revised Code, or an existing horizontal well that has no reported production for eight consecutive reporting periods as ... |
Section 1509.12 | Defective wells and well plugging.
...(A)(1) No person shall construct or operate a well, that causes damage to other permeable strata, underground sources of drinking water, or the surface of the land or that threatens the public health and safety or the environment. (2) No owner of a well shall permit a well to leak fluids or gases. (3) Upon the discovery that the casing in a well is defective or that a well was not adequately constructed, the pers... |
Section 1509.227 | Permits for operations in existence prior to 1/1/2014.
...standing division (B)(2)(a) of section 1509.22 of the Revised Code, on and after January 1, 2014, a person that is in operation prior to the date may store, recycle, treat, process, or dispose of in this state brine or other waste substances associated with the exploration, development, well stimulation, production operations, or plugging of oil and gas resources without an order or a permit issued under sectio... |
Section 1509.34 | Priority liens by division of oil and gas resources management for well owner's failure to pay fees or for costs incurred to correct conditions causing health of safety risks.
...(A)(1) If an owner fails to pay the fees imposed by this chapter, or if the chief of the division of oil and gas resources management incurs costs under division (F) of section 1509.071 of the Revised Code to correct conditions associated with the owner's well that the chief reasonably has determined are causing imminent health or safety risks, the division of oil and gas resources management shall have a priority l... |
Section 151.40 | Issuing obligations for paying costs of revitalization projects.
...(A) As used in this section: (1) "Bond proceedings" includes any trust agreements, and any amendments or supplements to them, as authorized by this section. (2) "Costs of revitalization projects" includes related direct administrative expenses and allocable portions of the direct costs of those projects of the department of development or the environmental protection agency. (3) "Issuing authority" means the... |
Section 1510.01 | Oil and natural gas marketing program definitions.
...hapter: (A) "First purchaser" means: (1) With regard to crude oil and condensate, the person to whom title first is transferred beyond the gathering tank or tanks, beyond the facility from which the crude oil was first produced, or both; (2) With regard to natural gas, the person to whom title first is transferred beyond the inlet side of the measurement station from which the natural gas was first produced. (B)... |
Section 1513.01 | Coal surface mining definitions.
... with division (A)(8) of section 1513.16 of the Revised Code. (B) "Coal mining and reclamation operations" means coal mining operations and all activities necessary and incident to the reclamation of such operations. (C) "Degrees" means inclination from the horizontal. (D) "Deposition of sediment" means placing or causing to be placed in any waters of the state, in stream beds on or off the ... |
Section 1513.073 | Designating areas as unsuitable for coal mining operations.
...(A)(1) Upon petition pursuant to division (B) of this section, the chief of the division of mineral resources management shall designate an area as unsuitable for all or certain types of coal mining operations if the chief determines that reclamation pursuant to the requirements of this chapter is not technologically and economically feasible. (2) Upon petition pursuant to division (B) of this section, a surf... |
Section 1513.075 | Potential acidity and neutralization of disturbed strata.
...(A) As used in this section: (1) "Potential acidity" means a laboratory measurement of the amount of acidity that could be produced by material in a rock strata proposed to be disturbed by mining and that is expressed by a numeral indicating the number of tons of that acidity that would be present in one thousand tons of disturbed overburden. (2) "Neutralization potential" means a laboratory measurement of th... |
Section 1513.372 | Immunity from liability.
...(A) As used in this section: (1) "Abandoned mine land" means land or water resources adversely affected by coal mining practices to which one of the following applies: (a) The coal mining practices occurred prior to August 3, 1977, and there is no continuing reclamation responsibility under state or federal law. (b) The coal mining practices occurred prior to April 10, 1972. (c) The coal mining practices we... |
Section 1514.081 | Administrative rules establishing standards and requirements for beneficial use of lime mining wastes and monitoring of ground water.
...(A) As used in this section: (1) "Lime mining wastes" means residual solid or semisolid materials generated from lime calcining, lime processing, or lime manufacturing operations, including, without limitation, lime kiln dust, scrubber sludge from lime kiln operations, lime materials not meeting product specification, lime hydrating materials, and other lime manufacturing, processing, or calcining materials... |
Section 1514.12 | Use of explosives.
...which a permit was issued under section 1514.02 or 1514.021 of the Revised Code. (B) The ground vibration resulting from the use of explosives when measured at any dwelling, public or commercial building, school, church, or community or institutional building that is located outside the area for which a permit was issued under section 1514.02 or 1514.021 of the Revised Code and that is not owned by the operator sha... |
Section 1514.13 | Establishing projected cone of depression for surface mining operation that may result in dewatering.
... water modeling submitted under section 1514.02 of the Revised Code to establish a projected cone of depression for any surface mining operation that may result in dewatering. The chief shall consult with the chief of the division of water resources when projecting a cone of depression. An applicant for a surface mining permit for such an operation may submit ground water modeling that shows a projected cone of depre... |
Section 1521.062 | Inspection of dams and levees.
...vision of water resources under section 1521.06 of the Revised Code shall be inspected periodically by the chief, except for classes of dams that, in accordance with rules adopted under this section, are required to be inspected by registered professional engineers who have been approved for that purpose by the chief. The inspection shall ensure that continued operation and use of the dam or levee does not constitute... |
Section 1521.20 | Duties of director.
...urces shall do all of the following: (1) Determine the amount of dredging that is needed in each inland lake in this state to improve access, water quality, safety, and other applicable standards; (2) Develop a plan to meet the needs identified under division (A)(1) of this section. In doing so, the director shall make every effort to optimize the utilization of dredging resources to maximize the amount of sedime... |
Section 1521.26 | Accompanying documentation with hydrogeologic description.
... required under division (B) of section 1521.24 of the Revised Code: (A) A detailed description of the geology within the proposed withdrawal and hydrologic study area down to the lowest level of any aquifer from which water is proposed to be withdrawn. The description must include the areal and structural geology of the withdrawal and hydrologic study area, and any other parameter that may affect the occurrence, a... |
Section 1522.12 | Program for issuance of withdrawal and consumptive use permits.
...t is not otherwise exempt under section 1522.14 of the Revised Code shall obtain a withdrawal and consumptive use permit from the chief of the division of water resources if the facility meets any of the following threshold criteria: (1) The facility has a new or increased capacity for withdrawals or consumptive uses from Lake Erie or a recognized navigation channel of at least two and one-half million gallons per ... |
Section 1522.123 | Documentation with hydrogeologic description.
... required under division (B) of section 1522.121 of the Revised Code: (A) A detailed description of the geology within the proposed withdrawal and hydrologic study area down to the lowest level of any aquifer from which water is proposed to be withdrawn. The description must include the areal and structural geology of the withdrawal and hydrologic study area, and any other parameter that may affect the occurrence, ... |
Section 1522.16 | Petitions regarding baseline reports.
...(A)(1) The owner or operator of a facility may petition the chief of the division of water resources for either of the following: (a) Inclusion in the baseline report if the owner or operator believes that the facility was erroneously excluded from the report; (b) The amendment of the amount of a withdrawal and consumptive use or other information included in the baseline report regarding the facility if the owner ... |