Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
comprar monedas FC 26 ps5 Visité Buyfc26coins.com. Confiable y transparente. Sin sorpresas..nfH9
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"comprar+monedas+FC++26+ps5+Visit%C3%A9+Buyfc26coins.com.+Confiable+y+transparente.+Sin+sorpresas..nfH9","start":1276,"pageSize":25,"sort":"BestMatch","title":""}
Results 1,276 - 1,300 of 1,377
Sort Options
Sort Options
Sections
Section
Section 5753.11 | Calculating student populations.

...r shall distribute funds in the gross casino revenue county student fund to public school districts. The commissioner shall calculate the amount of funds to distribute to each public school district as follows: (1) The commissioner shall calculate the proportional share of the funds attributable to each county by dividing the total student population certified for each county by the sum of the total student popula...

Section 5753.12 | Tax on unlicensed casino and sports gaming facilities.

...is chapter, any person who operates a casino facility without holding a current, valid license issued under Chapter 3772. of the Revised Code or a sports gaming facility without holding a current, valid license issued under Chapter 3775. of the Revised Code is liable for any amounts, including tax, interest, and penalties, imposed under this chapter in the same manner as persons that do hold such a license. (B) The...

Section 6131.01 | Single county drainage improvement definitions.

...sluice, revetment, reservoir, holding basin, control gate, breakwater, or other structure for the protection of lands from the overflow from any stream, lake, or pond, or for the protection of any outlet, or for the storage or control of water; (4) The removal of obstructions such as silt bars, log jams, debris, and drift from any ditch, drain, watercourse, floodway, river, creek, or run; (5) The vacating of a di...

Section 6131.02 | Authority of county commissioners to construct ditch improvements.

...sluice, revetment, reservoir, holding basin, control gate, breakwater, or other structure for control of water, or vacate any ditch or drain by proceedings as provided in sections 6131.01 to 6131.64 of the Revised Code.

Section 6131.03 | Co-ordinating system of water conservation and flood control.

...Boards of county commissioners in their respective counties, or in co-operation with any conservancy district which includes all or part of the lands of the county, or in co-operation with the proper authorities of the state or the proper authorities of the United States, may formulate, create, and construct a complete or co-ordinating system of water conservation and flood control, subject to the approval of the pro...

Section 6131.04 | Petition for construction of single county drainage improvement.

...sluice, revetment, reservoir, holding basin, control gate, breakwater, or other structure for control of water; (2) The course and termini of the proposed improvement and the branches, spurs, or laterals, if any are petitioned for; (3) That the construction of the improvement is necessary and will benefit the petitioner; (4) That all costs of engineering, construction, and future maintenance will be assessed to...

Section 6131.05 | Petition amendments.

...(A) Any benefiting owner may file an amendment to a petition for a drainage improvement that expands the length of the proposed improvement, provided that such amendment does not expand the area to be benefited by the proposed improvement. An owner shall file the amendment not more than twenty-one days after the date of the view. Such owner shall not propose an amendment that expands either the area or number of parc...

Section 6131.06 | Bond to be filed with petition.

...(A) The petitioner shall file with the petition referred to in section 6131.04 of the Revised Code a bond in the sum of one thousand five hundred dollars, plus the sum of five dollars for each parcel of land in excess of two hundred parcels that are listed in the petition as lands that will benefit from the improvement. (B) The bond shall be made payable to the county, to the credit of the general drainage improvem...

Section 6131.061 | [Former R.C. 6131.57, amended and renumbered by H.B. 340, 133rd General Assembly, effective 3/24/2021] Record keeping.

...(A) The clerk of the board of county commissioners shall maintain a file for the proposed improvement containing a record of the petition, amendments, comments, notices, proceedings, resolutions, orders, and any other record regarding the proposed improvement that is filed with the board. (B) The county engineer shall maintain a file for the proposed improvement that contains a record of the petition, amendments t...

Section 6131.07 | Notice and hearing on petition.

... managing agent at the usual place of business in the county. If such an owner is a foreign or domestic railroad company, regardless of whether the charter thereof prescribes the manner or place of service of process thereon, the notice shall be addressed to the property owner of record as listed by the county auditor on the general tax list. If such an owner other than a railroad company does not maintain a regular ...

Section 6131.08 | Comments on petition.

...Any owner who has not joined in a petition filed in accordance with section 6131.04 of the Revised Code may comment on the proposed improvement at any time before a final order on the petition is made by the board of county commissioners. Comments may be made in person at the public hearings on the petition or by filing written comments with the clerk of the board of county commissioners.

Section 6131.09 | Preliminary report by county engineer.

...(A) Upon receiving the notice required under division (A) of section 6131.07 of the Revised Code, the county engineer shall prepare a preliminary report on the proposed improvement, which shall include all of the following: (1) A preliminary estimate of the cost of the proposed improvement; (2) Comments on the feasibility of the project; (3) A statement of the engineer's opinion as to whether benefits from the ...

Section 6131.10 | Viewing of premises.

... overview of the proposed improvement, using methods and means that the board of county commissioners determines will adequately inform those attending the view about the proposed improvement's location and the drainage issues intended to be addressed by the proposed improvement. (B) Upon a request made by a commissioner or an owner in the area to be benefited by the proposed improvement, the board of county commi...

Section 6131.101 | First hearing on petition for proposed drainage improvement.

...(A) At the first hearing on a petition for a proposed improvement, the board of county commissioners shall do both of the following: (1) Hear the preliminary report of the county engineer required under section 6131.09 of the Revised Code; (2) Hear any evidence offered by any owner for or against the granting of the proposed improvement or for or against the granting of any laterals, branches, spurs, or change of...

Section 6131.11 | Dismissal of petition - appeal.

...(A) If the board of county commissioners finds at the conclusion of the first hearing for a proposed improvement that a proposed improvement is not necessary, will not be conducive to the public welfare, or that the estimated cost of the proposed improvement will exceed the benefits to be derived if it is constructed, the board shall dismiss the petition for the proposed improvement and enter its findings upon its jo...

Section 6131.12 | Grant of petition.

...(A) At the conclusion of the first hearing on a petition for a proposed improvement, the board of county commissioners may decide to proceed with the project survey and design for a proposed improvement if the board finds all of the following: (1) That a proposed improvement is necessary; (2) That the proposed improvement is conducive to the public welfare; (3) That it is reasonably certain that the benefits of...

Section 6131.13 | Consolidation of petitions.

...The board of county commissioners, on application of owners interested or at its own discretion, may consolidate and treat as a petition for one improvement petitions pending at the same time for two or more separate improvements which connect with each other, or which serve common territory, or which can readily be combined into one system. In case of such consolidation, the board shall enter its action upon its jou...

Section 6131.14 | County engineer's duties.

...(A) Upon the board's determination to proceed with the project survey and design on a proposed improvement under section 6131.12 of the Revised Code, the clerk of the board of county commissioners shall immediately forward a copy of the board's findings and orders to the county engineer. (B) The county engineer shall do all of the following: (1) Conduct all necessary surveys for the proposed improvement; (2) Pr...

Section 6131.15 | Schedule of assessments.

...(A) The county engineer shall prepare a schedule of assessments that includes all of the following: (1) The name and address of each private owner of land and a description of the land to be benefited by the proposed improvement. The engineer shall obtain the names and addresses from the tax duplicates of the county. The engineer shall obtain the description from the county recorder's office. For purposes of the de...

Section 6131.16 | Notice of assessments and final hearing.

...(A) Upon the filing with the clerk of the board of county commissioners of the reports, plans, and schedules by the county engineer as provided in section 6131.14 of the Revised Code, the board of county commissioners shall fix a date not fewer than twenty-five nor more than ninety days thereafter when a final hearing on the report shall be held. (B) At least twenty-one days prior to the date established for the h...

Section 6131.17 | Exceptions to engineer's schedules of assessments.

...(A) An owner may file an exception to the county engineer's schedules of assessments or file a claim for damages or compensation with the clerk of the board of county commissioners not less than five days before the date of the final hearing in the proceedings to construct the improvement. (B) An owner shall include with an exception or claim for compensation or damage the nature of the exception or claim, the amou...

Section 6131.19 | Hearing on compensation or damages.

...(A) At the final hearing, or at such time the final hearing is adjourned to hear claims for compensation or damages, the board of county commissioners shall hear any competent evidence offered by any affected owner upon the county engineer's estimate of damages and upon any claim filed for compensation or damages. (B) Upon consideration of all the evidence, the county engineer's schedule of estimated damages, and a...

Section 6131.20 | Final hearing.

...es filed by the engineer, thereby increasing the cost of the improvement, the final hearing shall be continued until the engineer makes proper schedules, which will include such changes. Before proceeding to make such change, all owners who will be affected thereby shall be notified of such proposed change, in the manner provided in sections 6131.01 to 6131.64, inclusive, of the Revised Code.

Section 6131.21 | Factors to be considered by commissioners at final hearing.

...(A) At the final hearing on a proposed improvement, after hearing all the evidence offered in the proceedings and after receiving and considering all the schedules, plans, and reports filed by the county engineer, the board of county commissioners shall review its former order to proceed with project survey and design for the proposed improvement and shall either affirm its former order and proceed to confirm the ass...

Section 6131.22 | Approval and confirmation of assessments.

...(A) At the final hearing on a proposed improvement, if the petition is not dismissed, the board of county commissioners shall hear any evidence offered for or against the assessment proposed to be levied against any owner or on any land as shown by the schedule of assessments filed by the county engineer and shall hear any competent evidence on the question of benefits. (B)(1) The board, from the evidence offered a...