Ohio Revised Code Search
Section |
---|
Section 5537.05 | Construction of grade separations at intersections of turnpike projects.
... facility considers most favorable. The construction shall be of substantially the same type and in as good condition as the original road, railroad, or public utility facility. The cost of the reconstruction, relocation, or removal and any damage incurred in changing the location shall be ascertained and paid by the commission as a part of the cost of the turnpike project or from revenues or state taxes. (2) The co... |
Section 5540.03 | Powers of transportation improvement district.
...nations preliminary to the location and construction of projects for the district, without liability of the district or its agents or employees except for actual damage done; (8) Make and enter into all contracts and agreements necessary or incidental to the performance of its functions and the execution of its powers under this chapter; (9) Employ or retain or contract for the services of consulting engineers, s... |
Section 5540.031 | Special assessments for improvements.
...mprovement district may provide for the construction, reconstruction, improvement, alteration, or repair of any road, highway, public place, building, or other infrastructure and levy special assessments, if the board determines that the public improvement will benefit the area where it will be constructed, reconstructed, improved, altered, or repaired. However, if the improvement is proposed for territory in a... |
Section 5543.09 | Supervision by county engineer.
...the county engineer shall supervise the construction, reconstruction, improvement, maintenance, and repair of the highways, bridges, and culverts under the jurisdiction of the board of county commissioners, and the construction, reconstruction, resurfacing, and improvement of public roads by boards of township trustees under sections 5571.01, 5571.06, 5571.07, 5571.15, 5573.01 to 5573.15, 5575.02 to 5575.09, and 5577... |
Section 5543.10 | Constructing sidewalks, curbs, or gutters.
...ng property owners. The expense of the construction of these improvements may be paid by the county or township, or by the county or township and abutting property owners in such proportion as determined by the board of county commissioners or board of township trustees. The board of county commissioners or board of township trustees may assess part or all of the cost of these improvements against the abutting... |
Section 5573.22 | Construction and repair in township road districts outside municipal corporations.
...township is situated, providing for the construction, improvement, maintenance, or repair by the board of county commissioners of a road within such district. The board of township trustees may assume, on behalf of such district, the proportion of the compensation, damages, and expenses of such improvement as is proper. The remainder of the compensation, damages, and costs of such improvement shall be paid in part ... |
Section 5591.04 | Contract for construction.
...The bridge construction contract provided for by section 5591.03 of the Revised Code shall provide for the construction, use, and maintenance of that part of the joint bridge intended or to be used for general highway traffic and for sufficient pier supports to carry that part of such bridge used or intended to be used for general highway traffic, and shall be executed by the board of county commissioners, on behalf ... |
Section 5591.09 | Resolution to determine to proceed.
...on, a determination to proceed with the construction of a joint bridge. At the time of passing the resolution, the proposed contract between the county and the railroad or union depot company, for the construction, use, and maintenance of the joint bridge, together with the plans and specifications showing its location, elevation, and approaches, with such other information as may be required under said contract, sh... |
Section 5593.03 | Construction and acquisition of bridges.
...nty or city; (B) Pay the costs of such construction, acquisition, improvement, operation, and maintenance; (C) Issue bridge revenue bonds of the state, or of such county or city, as provided by Chapter 5593. of the Revised Code. No bridge shall be constructed by a bridge commission until the director of transportation has approved the location and determined, after public hearing as provided in section 5511.01 of ... |
Section 5593.04 | Resolution.
...ll pass a resolution declaring that the construction or acquisition of a bridge, or the partial acquisition and partial construction, together with adequate repairs and rehabilitation if such bridge is already completed, or adequate completion of construction if such bridge is in process of construction, will be a convenience, necessity, and benefit to such county or city. |
Section 5593.08 | Bridge commissions - powers and duties.
...operty necessary or convenient for the construction of a bridge or the improvement or efficient operation of any property acquired or constructed under this chapter, or for securing right-of-way leading to any such bridge or its approach facilities; (J) Make and enter into all contracts and agreements necessary or incidental to the performance of its duties and the execution of its powers under this chapter: ... |
Section 5705.06 | Special levies without vote of the people within ten-mill limitation.
...In the case of a county, a levy for the construction, reconstruction, resurfacing, and repair of roads and bridges, other than state roads and bridges; (E) In the case of a county, a levy for paying the county's proportion of the cost of the construction, improvement, and maintenance of state highways; (F) In the case of a township, a levy for the construction, reconstruction, resurfacing, and repair of roads an... |
Section 5709.56 | Residential development land exemption.
...el of unimproved real property on which construction of one or more residential buildings is planned but has not yet commenced. The construction of streets, sidewalks, curbs, or driveways or the installation of water, sewer, or other utility lines on a subdivided parcel does not cause construction of a residential building to commence for purposes of division (A)(1) or (B) of this section. "Pre-residential developmen... |
Section 5713.17 | Duty to notify county auditor of improvement costing over $2,000 - penalty - examination of buildings.
... has been completed or is in process of construction. The notice shall be in writing, shall contain an estimate of the cost of the building or improvement, shall describe the lot or land and its ownership in a manner reasonably calculated to allow the county auditor to identify the lot or tract of land on the tax list, and shall be served upon the county auditor not later than sixty days after construction of the bui... |
Section 5739.026 | County sales tax for specific purposes.
...additional revenue for the acquisition, construction, equipping, or repair of any specific permanent improvement or any class or group of permanent improvements, which improvement or class or group of improvements shall be enumerated in the resolution required by division (D) of this section, and to pay principal, interest, premium, and other costs associated with the issuance of bonds or notes in anticipation of bon... |
Section 5739.03 | Consumer to pay tax - report of tax - exemption certificates.
...ent with a contractor or vendor for the construction of real property or for the sale and installation onto real property of tangible personal property. Any contractor or vendor may request from any contractee a certification of what portion of the property to be transferred under such contract or agreement is to be incorporated into the realty and what portion will retain its status as tangible personal property ... |
Section 6101.181 | Appropriation of property for sewer construction to address public health nuisance.
...nitary conditions compels the immediate construction of sewers for the protection of the public health and welfare; (2) The issuance of an order by the board of health of a health district to mitigate or abate a public health nuisance that is caused by an occasion of unavoidable urgency and suddenness due to unsanitary conditions and compels the immediate construction of sewers for the protection of the public healt... |
Section 6103.04 | Jurisdiction in area incorporated as or annexed to municipal corporation.
...rs for purposes of the acquisition and construction of water supply improvements until all of the improvements for the area for which a resolution described in division (A) or (E) of section 6103.05 of the Revised Code has been adopted by the board have been acquired or completed or until the board has abandoned the improvements. The board, unless and until a conveyance is made to a municipal corporation in ac... |
Section 6111.03 | Water pollution control powers of director of environmental protection.
...; (D) Administer state grants for the construction of sewage and waste collection and treatment works; (E) Encourage, participate in, or conduct studies, investigations, research, and demonstrations relating to water pollution, and the causes, prevention, control, and abatement thereof, that are advisable and necessary for the discharge of the director's duties under this chapter; (F) Collect and disseminate in... |
Section 6111.314 | Reporting and monitoring requirements.
... following the completion of mitigation construction activities. If the mitigation areas meet or exceed the performance criteria before the end of the second year of mitigation monitoring, no further monitoring shall be required. If the mitigation areas are not meeting the performance criteria by the end of the second year of mitigation monitoring, the monitoring period may be extended and the existing mitigation pla... |
Section 6115.221 | Appropriation of property for sewer construction to address public health nuisance.
...nitary conditions compels the immediate construction of sewers for the protection of the public health and welfare; (2) The issuance of an order by the board of health of a health district to mitigate or abate a public health nuisance that is caused by an occasion of unavoidable urgency and suddenness due to unsanitary conditions and compels the immediate construction of sewers for the protection of the public healt... |
Section 6117.05 | Continuing jurisdiction where area is incorporated into or annexed to municipal corporation.
...rs for purposes of the acquisition and construction of sanitary and drainage facility and prevention or replacement facility improvements until all of those improvements for the area for which a resolution described in division (A) or (E) of section 6117.06 of the Revised Code has been adopted by the board have been acquired or completed or until the board has abandoned the improvements. The board, unless and ... |
Section 6117.07 | Determination to proceed with construction.
...hether or not it will proceed with the construction of the improvement mentioned in such section. Notice of the time and place of each meeting of the board of county commissioners, at which the resolution to proceed with the construction of such improvement will be considered, shall be given in writing to all persons who filed written objections as provided in section 6117.06 of the Revised Code. Such notice sh... |
Section 6119.061 | Continuing jurisdiction over water resource projects.
...trict for purposes of the acquisition, construction, or operation of a water resource project until the water resource project has been acquired or completed or until the project is abandoned by the district. The board of trustees of the district, unless and until a conveyance is made to a municipal corporation in accordance with division (B) of this section, shall continue to have jurisdiction in the area so ... |
Section 6119.29 | Construction of main sewers and drains and branch sewers and drains without adoption of plan.
... and sewer district may provide for the construction of main sewers and drains and branch sewers and drains connecting therewith without previously adopting any plan of sewerage or division of the area or any part thereof into districts, and may assess the cost and expense of such construction upon such lots and lands as are designated in the resolution to improve, or such cost and expense may be paid from the genera... |