Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
cost of public records
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"cost+of+public+records","start":1676,"pageSize":25,"sort":"BestMatch","title":""}
Results 1,676 - 1,700 of 4,716
Sort Options
Sort Options
Sort Options
Sections
Section
Section 4907.48 | Regulation of crossing signals.

...ices erected under the direction of the public utilities commission shall be built within the time, in the manner, and of materials approved by the commission. Such devices so authorized shall be located in the highway or street on one or both sides of the railroad tracks, as the commission deems the public safety requires. Such gates shall be so constructed that when closed they obstruct or prevent passage across su...

Section 4907.49 | Dangerous crossings.

...be used to pay the public share of the cost under such an agreement. If a gate is erected or a flagger is stationed and maintained by a railroad, either alone or pursuant to such an agreement, the gate or flagger shall not be abandoned nor an automatic bell or other mechanical device substituted for the gate or flagger, unless the commission consents to the abandonment or substitution.

Section 4907.50 | Engines or trains may pass crossings without stopping.

...g works or fixtures was approved by the public utilities commission, and a plan thereof prepared by such railroads and filed with the commission.

Section 4907.51 | Unsafe interlocking works or fixtures.

...If in the opinion of the public utilities commission any system of interlocking works or fixtures referred to in section 4907.50 of the Revised Code proves to be unsafe or impracticable, the commission may order than no engines or trains shall pass over any such crossing or bridge without stopping, and the laws regulating the running of engines and trains shall apply. Before such order is made or enforced the commiss...

Section 4907.52 | Safety devices at grade crossings.

...oss at grade, if, in the opinion of the public utilities commission, public safety requires protection, the commission, upon its own motion or upon complaint, after notice to the railroads interested and full investigation, may make an order requiring the railroads so intersecting and crossing to install such devices as in the opinion of the commission will properly protect such crossing. The commission may make any...

Section 4907.54 | Compulsory interlocking.

...ommission at such crossing, and pay the costs of such fixtures and the expenses of installing them. The maintenance and operation of such fixtures shall be apportioned equally between the railroads by the commission. This section does not apply to crossings of sidetracks only.

Section 4907.55 | Crossing without stopping.

...When interlocking works or other fixtures are constructed and maintained in compliance with law by railroads and electric railways where railroads referred to in section 4907.54 of the Revised Code cross each other, engines, trains, or cars of an electric railway may be run over such crossing without stopping.

Section 4907.56 | Forfeiture for noncompliance with order.

...glecting to comply with an order of the public utilities commission concerning the protection of persons and property from danger at grade crossings of any such railroad over another, or over a swing bridge or drawbridge and at junction points, by providing interlocking works or other fixtures, shall forfeit five hundred dollars per week for each week such railroad refuses or neglects to obey such orders. Such forfei...

Section 4907.57 | Damage claims.

...such railroad, may be submitted to the public utilities commission by a formal complaint. Such complaint shall be made upon blank forms which the commission shall provide upon demand of the claimant. Such complaint shall be verified as petitions in civil actions and may be accompanied by the sworn statements of any witnesses who have knowledge of any fact material to the inquiry. Upon the filing of such compl...

Section 4907.58 | Immediate trial.

...e plaintiff shall not be liable for any costs unless they accrue upon his appeal.

Section 4907.59 | Counsel for commission.

...Upon request of the public utilities commission, the attorney general or the prosecuting attorney of the proper county shall aid in an investigation, prosecution, hearing, or trial had under Chapters 4901., 4903., 4905., 4907., and 4909. of the Revised Code, and shall institute and prosecute necessary actions or proceedings for the enforcement of such chapters and of other laws of this state relating to railroa...

Section 4907.60 | Forfeiture for violation.

...awful requirement or order made by the public utilities commission or order of any court upon application of the commission, the railroad, except as otherwise specifically provided in section 4905.95 of the Revised Code, shall forfeit into the state treasury not less than one hundred nor more than ten thousand dollars for each violation or failure. In construing and enforcing this section, the act, omission, o...

Section 4907.61 | Venue of forfeiture action by attorney general.

...Except as otherwise specifically provided in sections 4905.96 and 4923.99 of the Revised Code, when the attorney general prosecutes an action for the recovery of a forfeiture provided for in Chapter 4901., 4903., 4905., 4907., 4909., 4921., 4923., or 4959. of the Revised Code, the attorney general may bring the action in the court of common pleas of Franklin county or of any county having jurisdiction of the d...

Section 4907.62 | Punitive damages.

...If a railroad does, causes, or permits anything prohibited by Chapters 4901., 4903., 4905., 4907., and 4909. of the Revised Code to be done, or omits doing anything required to be done by such chapters, such railroad is liable to the person, firm, or corporation injured thereby in treble the amount of damages sustained in consequence of such violation or omission. A recovery provided by this section shall not a...

Section 4907.63 | Violation.

...r employee in an official capacity of a public utility or railroad shall knowingly violate section 4907.43 of the Revised Code, or willfully fail to comply with any lawful order or direction of the public utilities commission made with respect to any public utility or railroad. Each day's continuance of such failure is a separate offense.

Section 4907.99 | Penalty.

...(A) Whoever violates section 4907.21 of the Revised Code shall be fined not less than one hundred nor more than one thousand dollars. (B) Whoever violates section 4907.22 of the Revised Code shall be fined not less than five hundred nor more than one thousand dollars. (C) Whoever violates section 4907.32 of the Revised Code shall be fined not less than fifty nor more than five hundred dollars. (D) Whoever violates...

Section 4909.01 | Public utilities commission - fixation of rates definitions.

...As used in this chapter: (A) "Public utility" has the same meaning as in section 4905.02 of the Revised Code. (B) "Electric light company," "gas company," "natural gas company," "pipeline company," "water-works company," "sewage disposal system company," and "street railway company" have the same meanings as in section 4905.03 of the Revised Code. (C) "Railroad" has the same meaning as in section 4907.02 of ...

Section 4909.02 | Regulations and practices prescribed by commission prima-facie reasonable.

...f railroad companies prescribed by the public utilities commission shall be in force and be prima-facie reasonable, unless suspended or found otherwise in an action brought for that purpose pursuant to Chapters 4901., 4903., 4905., 4907., and 4909. of the Revised Code, or until changed or modified by the commission.

Section 4909.03 | Effect of rates fixed by commission.

...ates of railroad companies fixed by the public utilities commission shall be in force and be prima-facie lawful for two years from the day they take effect, or until changed or modified by the commission or by an order of a competent court in an action under Chapters 4901., 4903., 4905., 4907., and 4909. of the Revised Code.

Section 4909.04 | Valuation of property to determine justice of rates.

...orts of engineers, and other documents, records, and papers, or copies of any of them, in aid of any investigation and ascertainment of the value of its property; (2) Grant to the commission or its agents free access to all of its premises and property and its accounts, records, and memoranda whenever and wherever requested by any such authorized agent; (3) Cooperate with and aid the commission and its agents in th...

Section 4909.041

...nt" is an agreement pursuant to which a public utility leasing property is required to make rental payments for the term of the agreement and either the utility is granted the right to purchase the property upon the completion of the term of the agreement and upon the payment of an additional fixed sum of money or title to the property vests in the utility upon the making of the final rental payment. (B) A "leaseba...

Section 4909.042

...ing facts in detail: (1) The original cost of each parcel of land owned in fee and projected to be owned in fee and in use during the test period, determined by the commission; and also a statement of the conditions of acquisition, whether by direct purchase, by donation, by exercise of the power of eminent domain, or otherwise; (2) The actual acquisition cost, not including periodic rental fees, of rights-of-way...

Section 4909.05 | Report of valuation of property.

...ing facts in detail: (1) The original cost of each parcel of land owned in fee and in use, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be owned in fee and in use as of the date certain, determined by the commission; and also a statement of the conditions of acquisition, whether by direct purchase, by donation, by exercise of the power of eminent domain, or otherwi...

Section 4909.051 | Definitions for sections 4909.052 to 4909.055.

...As used in sections 4909.052 to 4909.055 of the Revised Code: "Large water-works or sewage disposal system company" means a water-works or sewage disposal system company that has annual operating revenues of two hundred fifty thousand dollars or more. "Municipal water-works or sewage disposal system company" means any water-works or sewage disposal system company owned or operated by a political subdivision defin...

Section 4909.052 | Evaluation of petition for purchase of municipal water-works or sewage disposal system; acceptance of cost report.

...such costs are just and reasonable, the public utilities commission in evaluating a petition submitted under section 4905.481 of the Revised Code shall accept the original cost, reported under division (C)(3) of section 4909.05 of the Revised Code, of the acquisition of a municipal water-works or sewage disposal system company that is acquired by a large water-works or sewage disposal system company, provided that th...