Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
monedas FC 26 precio Visité Buyfc26coins.com. ¡Excelente! Recomendado al 100%..SVbM
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"monedas+FC++26+precio+Visit%C3%A9+Buyfc26coins.com.+%C2%A1Excelente%21+Recomendado+al+100%25..SVbM","start":2901,"pageSize":25,"sort":"BestMatch","title":""}
Results 2,901 - 2,925 of 15,258
Sort Options
Sort Options
Sort Options
Sections
Section
Section 1567.79 | Instruction on hazards.

...Employees assigned to work on a longwall working section shall be instructed in the hazards of longwall mining, including, but not limited to, a review of all of the following: (A) Escapeway and travel routes; (B) Ventilation; (C) Roof support; (D) Communications; (E) Stop controls and signals; (F) Location of first aid equipment; (G) Safety rules for longwall mining.

Section 1567.99 | Penalty.

...Whoever knowingly violates any section of this chapter is guilty of a minor misdemeanor.

Section 1571.01 | Underground storage of gas definitions.

...rotective area of which, is within a coal bearing township, into which gas is or may be injected for the purpose of storing it therein and removing it therefrom, or for the purpose of testing whether such stratum is suitable for such storage purposes. (B) "Gas" means any natural, manufactured, or by-product gas or any mixture thereof. (C) "Reservoir operator" or "operator," when used in referring to the opera...

Section 1571.011 | Chapter does not apply to chapter 1514 activities.

...Nothing in this chapter applies to activities that are permitted and regulated under Chapter 1514. of the Revised Code.

Section 1571.012 | Applicants for position of gas storage well inspector.

...osition of gas storage well inspector shall register the applicant's name with the chief of the division of oil and gas resources management and file with the chief an affidavit as to all matters of fact establishing the applicant's right to take the examination for that position and a certificate from a reputable and disinterested physician, clinical nurse specialist, or certified nurse practitioner as to the physic...

Section 1571.013 | Examinations for gas storage well inspector.

... of oil and gas resources management shall conduct examinations for the position of gas storage well inspector. The chief annually shall provide for the examination of candidates for appointment as gas storage well inspector. Special examinations may be held whenever it becomes necessary to make an appointment of gas storage well inspector. (B) Public notice shall be given through the press or otherwise, not...

Section 1571.014 | Appointment of gas storage well inspector.

... of oil and gas resources management shall appoint a gas storage well inspector from the eligible list of candidates for that position that is prepared under section 124.24 of the Revised Code. If a vacancy occurs in the position of gas storage well inspector, the chief shall fill the position by selecting a person from that list. The chief shall adopt rules in accordance with Chapter 119. of the Revised Code...

Section 1571.02 | Filing of map by reservoir operator.

...in, or removing gas from a reservoir shall within sixty days after such date file with the division of oil and gas resources management a map thereof as described in division (C) of this section, provided that if a reservoir operator is, on September 9, 1957, injecting gas into or storing gas in a reservoir solely for testing, the reservoir operator shall at once file such map with the division. (B) If the in...

Section 1571.03 | Excavations and extensions to be shown on maps - notices sent.

...(A) Every operator of a coal mine who is required by sections 1563.03 to 1563.05 of the Revised Code, to file maps of such mine, shall cause to be shown on each of such maps, in addition to the boundary lines of each tract under which excavations are likely to be made during the ensuing year, as referred to in section 1563.03 of the Revised Code: (1) The boundary of such coal mine in accordance with the meani...

Section 1571.04 | Gas storage well inspector to examine maps.

...s required by this chapter, and each coal mine map with the division of mineral resources management as required by sections 1563.03 to 1563.05 and division (A) of section 1571.03 of the Revised Code, the gas storage well inspector shall cause an examination to be made of all maps on file in those divisions as the gas storage well inspector may deem necessary to ascertain whether any part of a reservoir protect...

Section 1571.05 | Plugging and reconditioning of wells within reservoir area.

...otective area underlies any part of a coal mine, or is, or within nine months is expected or intended to be, within two thousand linear feet of the boundary of a coal mine that is operating in a coal seam any part of which extends over any part of the storage reservoir or its protective area, the operator of the reservoir, if the reservoir operator or some other reservoir operator has not theretofore done so, shall: ...

Section 1571.06 | Accuracy or correctness of maps.

...servoirs, reservoir protective areas, coal mines, coal mine protective areas, and wells, as shown on the most recent maps of storage reservoirs and of coal mines filed with the division of oil and gas resources management or the division of mineral resources management as required by this chapter and sections 1563.03 to 1563.05 of the Revised Code, may be accepted and relied upon as being accurate and correct, ...

Section 1571.07 | Prohibited acts - exceptions.

... into or storage of gas in a mineable coal seam, whether or not such coal seam is being mined, and the injection of gas into or storage of gas in a coal seam which has been mined, and the appropriation of any coal seam or any interest therein, is prohibited. (B) Nothing in this chapter shall be construed to prohibit any necessary use of the surface of the earth above a coal mine, or the drilling of a well through a ...

Section 1571.08 | Use of alternate methods or materials - filing of objections.

...er in this chapter, the method or material to be used in discharging any obligations imposed by this chapter is specified, an alternative method or material may be used if approved by the gas storage well inspector or the chief of the division of oil and gas resources management. A person desiring to use such alternative method or material shall file with the division of oil and gas resources management an applicatio...

Section 1571.09 | Records and facilities.

...examine records and facilities of any coal mine operator or reservoir operator, for the purpose of determining the accuracy or correctness of any map, data, statement, report, or other item or article, filed with or otherwise received by the division pursuant to this chapter. When a material question is raised by any reservoir operator or coal mine operator as to the accuracy or correctness of any such map, dat...

Section 1571.10 | Request for conference - request for hearing by chief of division - procedures.

...ssing and endeavoring to resolve by mutual agreement any question or issue relating to the administration of this chapter, or to compliance with its provisions, or to any violation thereof. Such request shall describe the matter concerning which the conference is requested. Thereupon the gas storage well inspector shall promptly fix the time and place for the holding of such conference and shall send written notice t...

Section 1571.11 | Rules governing administrative procedures.

... of oil and gas resources management shall adopt rules governing administrative procedures to be followed in the administration of this chapter, which shall be of general application in all matters and to all persons affected by this chapter. No rule adopted by the chief pursuant to this section shall be effective until the tenth day after a certified copy thereof has been filed in the office of the secretary...

Section 1571.14 | Appeals to director of natural resources.

... or 1571.16 of the Revised Code may appeal to the director of natural resources for an order vacating or modifying such order. Upon receipt of the appeal, the director shall appoint an individual who has knowledge of the laws and rules regarding the underground storage of gas and who shall act as a hearing officer in accordance with Chapter 119. of the Revised Code in hearing the appeal. The person appealing to th...

Section 1571.15 | Appeals to court of common pleas.

...ion 1571.14 of the Revised Code may appeal to the court of common pleas of any county in which the well, or part of the gas storage reservoir, or part of the coal mine, involved in the order of the hearing officer which is being appealed, is located. Any party desiring to so appeal shall file with the director of natural resources a notice of appeal designating the order appealed from and stating whether the appeal i...

Section 1571.16 | Filing of complaint - hearing - injunctions.

...n of oil and gas resources management shall promptly fix the time for the holding of a hearing on such complaint and shall send by certified mail or electronic format to the person so complained of, a copy of such complaint together with at least five days' notice of the time and place at which such hearing will be held. Such notice of such hearing shall also be given to all persons having a direct interest in the ma...

Section 1571.17 | Appropriation of private property.

...ther located entirely or in part in a coal bearing township or elsewhere, any private property or interest therein as is necessary for the establishment, operation or protection of such reservoir. The right to appropriate granted in this section shall be exercised in accordance with the law prescribing how appropriation of private property by corporations shall be made. A corporation instituting a proceeding to appro...

Section 1571.18 | Gas storage well regulatory fee.

...cated in a reservoir protective area shall pay to the chief of the division of oil and gas resources management a gas storage well regulatory fee of one hundred twenty-five dollars for each well that the owner owned as of the thirty-first day of December of the previous year for the purposes of administering this chapter and Chapter 1509. of the Revised Code. The chief may prescribe and provide a form for the ...

Section 1571.30 | Class VI injection wells.

...of this section, the department of natural resources shall initiate a process to work with the United States environmental protection agency and the United States department of energy to develop a statewide underground injection control program for class VI injection wells in order to obtain primary enforcement authority over those wells in this state from the United States environmental protection agency.

Section 1571.99 | Penalty.

...ficer appointed by the director of natural resources under section 1571.14 of the Revised Code, or of the director, made pursuant to this chapter shall be punished by a fine not exceeding two thousand dollars, or imprisoned in jail for a period not exceeding twelve months, or both, in the discretion of the court.

Section 164.01 | Aid to local government improvement definitions.

...As used in this chapter: (A) "Capital improvement" or "capital improvement project" or "project" means the acquisition, construction, reconstruction, improvement, planning, and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, waste water treatment systems, water supply systems, solid waste disposal facilities, and storm wat...