Ohio Revised Code Search
| Section |
|---|
|
Section 4104.10 | Inspection of unfired pressure vessels.
...r is filed in the office of the superintendent of industrial compliance. All unfired pressure vessels shall conform in every detail with applicable rules adopted by the board of building standards pursuant to section 4104.02 of the Revised Code. |
|
Section 4104.101 | Registration and permits from division of industrial compliance.
... one hundred dollars. (C) The superintendent of industrial compliance shall require annual registration of all contractors who install, make major repairs to, or modify any boiler. The board of building standards shall establish a reasonable fee to cover the cost of processing registrations. (D) Notwithstanding any provision of this section to the contrary, the superintendent shall register a contractor to instal... |
|
Section 4104.11 | Inspecting boilers.
...inspected internally and externally and under operating conditions at intervals of not more than one year, unless approved for biennial inspection under section 4104.13 of the Revised Code, and shall not be operated at pressures in excess of the safe working pressure stated in the certificate of operation mentioned in sections 4104.12, 4104.13, and 4104.15 of the Revised Code. (B) All low pressure boilers and their ... |
|
Section 4104.12 | Inspecting boiler installation.
...en installed and shall not be operated until an appropriate certificate of operation has been issued by the superintendent of industrial compliance. The certificate of operation required by this section shall not be issued for any boiler which has not been thoroughly inspected during construction and upon completion, by either a general or special inspector, and which does not conform in every detail with the ... |
|
Section 4104.13 | Interval inspection of boilers.
...ing internal continuous water treatment under the general supervision of a registered professional engineer having experience in the treatment of boiler water where said water treatment is for the purpose of controlling and limiting serious corrosion, and other deteriorating factors shall be thoroughly inspected internally and externally and under operating conditions at intervals of not more than two years and shall... |
|
Section 4104.14 | Preparing boiler for inspection.
... The inspector, when making inspections under operating conditions, shall observe the pressure carried and the general condition of each boiler, and ascertain if the safety valve and the appliances for indicating the pressure and level of water in the boiler are in proper working order. No person shall remove or tamper with any safety appliances prescribed by the board of building standards, and no person shall in an... |
|
Section 4104.15 | Certificates of inspection and operation.
... unless sooner withdrawn by the superintendent of industrial compliance. The owner or user of any such boiler shall obtain an appropriate certificate of operation for such boiler, and shall not operate such boiler, or permit it to be operated unless a certificate of operation has been obtained in accordance with section 4104.17 of the Revised Code. (B) If a boiler owner or user is in compliance with sections 4104.13... |
|
Section 4104.16 | Notifying superintendent of the division of industrial compliance of safety defect or of relocation.
..., shall immediately notify the superintendent of industrial compliance in case a defect affecting the safety of the boiler is discovered. The owner or user of any stationary boiler required by such sections to be inspected, who moves the same, shall report to the superintendent the new location of the boiler. Such boiler shall be inspected before it is again operated. |
|
Section 4104.17 | Certificates of operation - issuance and renewal.
... the Revised Code shall be issued and renewed in accordance with and at dates prescribed by rules and regulations adopted by the superintendent of industrial compliance. |
|
Section 4104.18 | Fees.
... be paid into the state treasury to the credit of the industrial compliance operating fund created in section 121.084 of the Revised Code. (G) Any person who fails to pay an invoiced renewal fee or an invoiced inspection fee required for any inspection conducted by the division of industrial compliance pursuant to this chapter within forty-five days of the invoice date shall pay a late payment fee equal to twenty-f... |
|
Section 4104.19 | Operator's license.
...as obtained or renewed a license issued under this chapter by fraud, misrepresentation, or deception. (D) The superintendent shall issue a license to each applicant who receives a passing score on the examination, as determined by the superintendent, for the license for which the applicant applied. (E) The superintendent may select and contract with one or more persons to do all of the following relative to the e... |
|
Section 4104.20 | Boiler operation.
...vided in such sections or hinder or prevent a general or special inspector of boilers from entering any premises in or on which a boiler is situated for the purpose of inspection. No owner or operator of any pressure vessel shall operate the same in violation of section 4104.10 of the Revised Code, or of any rule or regulation adopted by the board of building standards, pursuant to section 4104.02 of the Revised Code... |
|
Section 4104.21 | Effect of child support default on license or certificate.
...d Code and any applicable rules adopted under section 3123.63 of the Revised Code with respect to a certificate or license issued pursuant to this chapter. |
|
Section 4104.31 | Historical boiler definitions.
...n sections 4104.31 to 4104.37: (A) "Boiler" has the same meaning as in section 4104.01 of the Revised Code. (B) "Historical boiler" means a steam boiler of riveted construction that is preserved, restored, or maintained for hobby or demonstration. |
|
Section 4104.32 | Operating historical boiler in place open to public.
...e in a place that is open to the public unless both of the following requirements are satisfied: (A) The person operating the boiler is licensed under section 4104.35 of the Revised Code. (B) The owner of the boiler holds a current valid certificate of operation for the historical boiler pursuant to section 4104.36 of the Revised Code. |
|
Section 4104.33 | Historical boilers licensing board.
...om the date of the member's appointment until the end of the term for which the member was appointed. Members may be reappointed. Vacancies shall be filled by the director of commerce, and shall not require the advice and consent of the senate. Any member appointed to fill a vacancy occurring prior to the expiration date of the term for which the member's predecessor was appointed shall hold office as a member for th... |
|
Section 4104.34 | Historical boilers licensing board - powers and duties.
...s license, which shall include an opportunity for appeal and hearing in accordance with Chapter 119. of the Revised Code; (5) Standards for requalifying for a license after revocation of a license; (6) Standards and procedures for conducting hydrostatic tests, and requirements for reporting the results of those tests to the board, as required under division (F) of section 4104.36 of the Revised Code; (7) Standa... |
|
Section 4104.35 | License to operate historical boiler in public.
...orical boilers; (4) Has at least one hundred hours of actual operating experience or training in the operation of historical boilers. (B) A person who satisfies the criteria described in division (A) of this section shall pay a one-time fee of fifty dollars for the issuance of a license under this section. (C) A license issued under this section is valid for the lifetime of the operator unless the license is re... |
|
Section 4104.36 | Certificate of operation and inspection of historical boiler.
...roughly, internally and externally, and under operating conditions, all historical boilers that are operated in public and their appurtenances. Inspectors shall examine the smoke box, barrel, wrapped sheet, dome, water column and water glass, firebox, external plumbing, fusible plug, pressure relief valve, and pressure gauge. (C) After conducting the inspection required under division (B) of this section, the inspe... |
|
Section 4104.37 | Exemption for small boilers.
...determined by the historical boilers licensing board pursuant to division (I) of section 4104.34 of the Revised Code. |
|
Section 4104.41 | Power or process piping definitions.
...boiler pressures greater than fifteen pounds per square inch gauge, high temperature water piping from high pressure and high temperature boilers, power boiler steam condensate piping, high pressure and high temperature water condensate piping, and compressed air and hydraulic piping upstream of the first stop valve off a system distribution header. (C) "Process piping" means piping systems and their component parts... |
|
Section 4104.42 | Owner to ensure compliance with pressure piping standards.
...e performed in compliance with applicable sections of the B31 standards contained in the code for pressure piping, published by the American society of mechanical engineers: (1) The design, fabrication, assembly, installation, testing, examination, and inspection of power and process piping systems; (2) Qualification of personnel and qualification of welding and brazing procedures; (3) The implementation of ... |
|
Section 4104.43 | Board of building standards to adopt requirements for building services piping.
... medical vacuum piping systems. (B) A municipal, township, or county building department certified under division (E) of section 3781.10 of the Revised Code shall enforce the rules the board adopts pursuant to division (A)(2) of this section if that building department requests and obtains special certification to enforce those rules. (C) In a health district where no municipal, township, or county building de... |
|
Section 4104.44 | Welding and brazing to conform to industry standards.
.... The owner shall maintain, at the job site, the certified performance qualification records of all welders and brazers employed at the facility. The owner shall submit copies of all certified welding and brazing procedure specifications, procedure qualification records, and performance qualification records for building services piping for review to the superintendent of industrial compliance in the department... |
|
Section 4104.45 | Inspectors or testing witnesses to be certified.
... witnesses the testing of any nonflammable medical gas and vacuum piping system shall be certified to do so pursuant to division (E) of section 3781.10 of the Revised Code. |