Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
utilities
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"utilities","start":451,"pageSize":25,"sort":"BestMatch","title":""}
Results 451 - 475 of 1,779
Sort Options
Sort Options
Sections
Section
Section 4903.23 | Fees for copying and certifying documents - status as evidence.

...The public utilities commission or power siting board may charge and collect a fee, which shall not exceed cost, for furnishing any copy of any paper, record, testimony, or writing made, taken, or filed under Chapters 4901., 4903., 4905., 4906., 4907., 4909., 4921., 4923., and 4927. of the Revised Code, except such transcript and other papers as are required to be filed in any court proceedings authorized in th...

Section 4905.19 | Depreciation fund.

... except upon the approval of the public utilities commission.

Section 4905.23 | Electric generating plant closure prohibited.

...(A) As used in this section, "base load electric generating facility" means an electric generating plant and associated facilities located in this state that primarily uses a nonrenewable fuel source to generate electricity, including natural gas and nuclear reaction, and that is not owned or operated by a public utility, municipal corporation, or electric cooperative. (B) No person shall enter into a settlement to...

Section 4905.261 | Telephone call center for consumer complaints.

...The public utilities commission shall operate a telephone call center for consumer complaints, to receive complaints by any person, firm, or corporation against any public utility. The commission shall expeditiously provide the consumers' counsel with all information concerning residential consumer complaints received by the commission in the operation of the telephone call center and with any materials produced in t...

Section 4905.27 | Standard units.

...The public utilities commission shall ascertain and prescribe suitable and convenient standard commercial units of the product or service of any public utility when the character of its product or service is such that it can be determined. Such units shall be the lawful units for the purposes of Chapters 4901., 4903., 4905., 4907., 4909., 4921., 4923., and 4925. of the Revised Code.

Section 4905.28 | Standards of measurement.

...The public utilities commission may ascertain and fix adequate and serviceable standards for the measurement of quality, pressure, initial voltage, or other conditions pertaining to the supply or quality of the product furnished or adequacy of service rendered by any public utility and may prescribe reasonable regulations for examination, testing, and measurement of such product or service. It may establish reasonabl...

Section 4905.30 | Printed schedules of rates must be filed.

...y shall print and file with the public utilities commission schedules showing all rates, joint rates, rentals, tolls, classifications, and charges for service of every kind furnished by it, and all rules and regulations affecting them. The schedules shall be plainly printed and kept open to public inspection. The commission may prescribe the form of every such schedule, and may prescribe, by order, changes in ...

Section 4905.321 | Refund of improper charges.

...il the date when, on remand, the public utilities commission makes changes to the rider or rates to implement the supreme court's decision. (B) The commission shall order the payment of the refunds described in division (A) of this section in a manner designed to allocate the refunds to customer classes in the same proportion as the charges were originally collected. (C) The commission shall determine how to allo...

Section 4905.33 | Rebates, special rates, and free service prohibited.

...(A) No public utility shall directly or indirectly, or by any special rate, rebate, drawback, or other device or method, charge, demand, collect, or receive from any person, firm, or corporation a greater or lesser compensation for any services rendered, or to be rendered, except as provided in Chapters 4901., 4903., 4905., 4907., 4909., 4921., and 4923. of the Revised Code, than it charges, demands, collects, or rec...

Section 4905.46 | Restrictions on dividend or distribution.

...t is authorized to do so by the public utilities commission. This section does not apply to telephone companies.

Section 4905.55 | Liability for act of agent.

...The act, omission, or failure of any officer, agent, or other person, acting for or employed by a public utility or railroad, while acting within the scope of his employment, is the act or failure of the public utility or railroad.

Section 4905.57 | Actions to recover forfeitures.

...eral is directed to do so by the public utilities commission. Moneys recovered by such actions shall be deposited in the state treasury to the credit of the general revenue fund.

Section 4905.81 | Duties of public utilities commission.

...The public utilities commission shall: (A) Supervise and regulate each motor carrier; (B) Regulate the safety of operation of each motor carrier, and of each intermodal equipment provider as defined in section 4923.041 of the Revised Code; (C) Adopt reasonable safety rules applicable to the highway transportation of persons or property in interstate and intrastate commerce by motor carriers; (D) Adopt safety rule...

Section 4906.103 | No power siting board certificate or amendment where limited.

...If a board of county commissioners has adopted a resolution which limits the boundaries of the proposed utility facility to a smaller geographic area of the county, completely within what was proposed by the applicant, as described in section 303.62 of the Revised Code, the power siting board shall not grant a certificate or material amendment that includes an area outside of the geographic area approved by the board...

Section 4906.12 | Procedures of public utilities commission to be followed.

... manner as if the board were the public utilities commission under such sections.

Section 4906.13 | No local jurisdiction.

...(A) As used in this section and sections 4906.20 and 4906.98 of the Revised Code, "economically significant wind farm" means wind turbines and associated facilities with a single interconnection to the electrical grid and designed for, or capable of, operation at an aggregate capacity of five or more megawatts but less than fifty megawatts. The term excludes any such wind farm in operation on June 24, 2008. The term ...

Section 4906.20 | Certificate required to construct certain wind farms.

...(A) No person shall commence to construct an economically significant wind farm in this state without first having obtained a certificate from the power siting board. An economically significant wind farm with respect to which such a certificate is required shall be constructed, operated, and maintained in conformity with that certificate and any terms, conditions, and modifications it contains. A certificate shall b...

Section 4906.211 | Decommissioning plan requirements and estimated costs.

...(A) The decommissioning plan submitted to the power siting board under section 4906.21 of the Revised Code shall be prepared by a professional engineer registered with the state board of registration for professional engineers and surveyors. The board may reject the engineer chosen by the applicant and to require the applicant to choose another qualified engineer. (B) The plan shall contain the following: (1) A l...

Section 4906.30 | No power siting board certificate or amendment for nonconformity.

...(A) For purposes of this section and section 4906.31 of the Revised Code, "material amendment" and "utility facility" have the same meanings as in section 303.57 of the Revised Code. (B) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, t...

Section 4906.98 | Prohibited acts.

...(A) No person shall construct a major utility facility or economically significant wind farm without first obtaining a certificate. (B) No person shall construct, operate, or maintain a major utility facility or economically significant wind farm other than in compliance with the certificate the person has obtained. (C) No person or economically significant wind farm shall fail to comply with any order issu...

Section 4907.10 | Commission may make examinations.

...Upon demand, the public utilities commission, a public utilities commissioner, or any person employed by the commission for that purpose, may inspect the books and papers of a railroad and examine under oath any officer, agent, or employee of a railroad, in relation to any matter which is the subject of complaint and investigation. A person, other than one of the commissioners, who makes such demand shall produce his...

Section 4907.21 | Refusal to fill blank forms.

...urn a blank form required by the public utilities commission, or by law, or willfully fail to answer a question propounded in a blank form, knowingly give a false answer to such question or evade the answer to it, if the fact inquired of is within his knowledge, or, upon proper demand, willfully fail to exhibit a book, paper, or account of such railroad which is in his possession or under his control, to a public uti...

Section 4907.49 | Dangerous crossings.

...laggers, and apportioned by the public utilities commission as railroad expense, shall be shared equally by the railroads. Chapters 4901., 4903., 4905., 4907., and 4909. of the Revised Code do not prevent the use of automatic bells or other mechanical devices by a railroad at a public crossing not declared dangerous by the public utilities commission, nor do they prevent state, county, township, or municipal ...

Section 4909.01 | Public utilities commission - fixation of rates definitions.

...As used in this chapter: (A) "Public utility" has the same meaning as in section 4905.02 of the Revised Code. (B) "Electric light company," "gas company," "natural gas company," "pipeline company," "water-works company," "sewage disposal system company," and "street railway company" have the same meanings as in section 4905.03 of the Revised Code. (C) "Railroad" has the same meaning as in section 4907.02 of ...

Section 4909.057 | Deferral of post-in-service carrying costs.

...on of the acquiring company, the public utilities commission may authorize the acquiring company to defer post-in-service carrying costs on any improvements made to the company that is acquired after an acquisition described in section 4909.052 of the Revised Code. Such costs shall be calculated at the acquiring company's weighted average cost of debt as determined in its last rate case. Such deferrals shall commence...