Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
utilities
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"utilities","start":451,"pageSize":25,"sort":"BestMatch","title":""}
Results 451 - 475 of 1,757
Sort Options
Sort Options
Sections
Section
Section 4905.46 | Restrictions on dividend or distribution.

...t is authorized to do so by the public utilities commission. This section does not apply to telephone companies.

Section 4905.55 | Liability for act of agent.

...The act, omission, or failure of any officer, agent, or other person, acting for or employed by a public utility or railroad, while acting within the scope of his employment, is the act or failure of the public utility or railroad.

Section 4905.57 | Actions to recover forfeitures.

...eral is directed to do so by the public utilities commission. Moneys recovered by such actions shall be deposited in the state treasury to the credit of the general revenue fund.

Section 4905.81 | Duties of public utilities commission.

...The public utilities commission shall: (A) Supervise and regulate each motor carrier; (B) Regulate the safety of operation of each motor carrier, and of each intermodal equipment provider as defined in section 4923.041 of the Revised Code; (C) Adopt reasonable safety rules applicable to the highway transportation of persons or property in interstate and intrastate commerce by motor carriers; (D) Adopt safety rule...

Section 4906.03 | Powers and duties of power siting board.

...The power siting board shall: (A) Require such information from persons subject to its jurisdiction as it considers necessary to assist in the conduct of hearings and any investigations or studies it may undertake; (B) Conduct any studies or investigations that it considers necessary or appropriate to carry out its responsibilities under this chapter; (C) Adopt rules establishing criteria for evaluating the ...

Section 4906.103 | No power siting board certificate or amendment where limited.

...If a board of county commissioners has adopted a resolution which limits the boundaries of the proposed utility facility to a smaller geographic area of the county, completely within what was proposed by the applicant, as described in section 303.62 of the Revised Code, the power siting board shall not grant a certificate or material amendment that includes an area outside of the geographic area approved by the board...

Section 4906.105 | Report to the general assembly.

...The power siting board shall submit a report to the general assembly, not later than December 1, 2021, on whether the current requirements for the planning of the power transmission system and associated facilities investment in this state are cost effective and in the interest of consumers. The board shall hold at least one public meeting before completing the report. The board shall complete the report in consultat...

Section 4906.12 | Procedures of public utilities commission to be followed.

... manner as if the board were the public utilities commission under such sections.

Section 4906.13 | No local jurisdiction.

...(A) As used in this section and sections 4906.20 and 4906.98 of the Revised Code, "economically significant wind farm" means wind turbines and associated facilities with a single interconnection to the electrical grid and designed for, or capable of, operation at an aggregate capacity of five or more megawatts but less than fifty megawatts. The term excludes any such wind farm in operation on June 24, 2008. The term ...

Section 4906.20 | Certificate required to construct certain wind farms.

...(A) No person shall commence to construct an economically significant wind farm in this state without first having obtained a certificate from the power siting board. An economically significant wind farm with respect to which such a certificate is required shall be constructed, operated, and maintained in conformity with that certificate and any terms, conditions, and modifications it contains. A certificate shall b...

Section 4906.211 | Decommissioning plan requirements and estimated costs.

...(A) The decommissioning plan submitted to the power siting board under section 4906.21 of the Revised Code shall be prepared by a professional engineer registered with the state board of registration for professional engineers and surveyors. The board may reject the engineer chosen by the applicant and to require the applicant to choose another qualified engineer. (B) The plan shall contain the following: (1) A l...

Section 4906.30 | No power siting board certificate or amendment for nonconformity.

...(A) For purposes of this section and section 4906.31 of the Revised Code, "material amendment" and "utility facility" have the same meanings as in section 303.57 of the Revised Code. (B) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, t...

Section 4906.98 | Prohibited acts.

...(A) No person shall construct a major utility facility or economically significant wind farm without first obtaining a certificate. (B) No person shall construct, operate, or maintain a major utility facility or economically significant wind farm other than in compliance with the certificate the person has obtained. (C) No person or economically significant wind farm shall fail to comply with any order issu...

Section 4907.10 | Commission may make examinations.

...Upon demand, the public utilities commission, a public utilities commissioner, or any person employed by the commission for that purpose, may inspect the books and papers of a railroad and examine under oath any officer, agent, or employee of a railroad, in relation to any matter which is the subject of complaint and investigation. A person, other than one of the commissioners, who makes such demand shall produce his...

Section 4907.21 | Refusal to fill blank forms.

...urn a blank form required by the public utilities commission, or by law, or willfully fail to answer a question propounded in a blank form, knowingly give a false answer to such question or evade the answer to it, if the fact inquired of is within his knowledge, or, upon proper demand, willfully fail to exhibit a book, paper, or account of such railroad which is in his possession or under his control, to a public uti...

Section 4907.49 | Dangerous crossings.

...laggers, and apportioned by the public utilities commission as railroad expense, shall be shared equally by the railroads. Chapters 4901., 4903., 4905., 4907., and 4909. of the Revised Code do not prevent the use of automatic bells or other mechanical devices by a railroad at a public crossing not declared dangerous by the public utilities commission, nor do they prevent state, county, township, or municipal ...

Section 4909.01 | Public utilities commission - fixation of rates definitions.

...As used in this chapter: (A) "Public utility" has the same meaning as in section 4905.02 of the Revised Code. (B) "Electric light company," "gas company," "natural gas company," "pipeline company," "water-works company," "sewage disposal system company," and "street railway company" have the same meanings as in section 4905.03 of the Revised Code. (C) "Railroad" has the same meaning as in section 4907.02 of ...

Section 4909.057 | Deferral of post-in-service carrying costs.

...on of the acquiring company, the public utilities commission may authorize the acquiring company to defer post-in-service carrying costs on any improvements made to the company that is acquired after an acquisition described in section 4909.052 of the Revised Code. Such costs shall be calculated at the acquiring company's weighted average cost of debt as determined in its last rate case. Such deferrals shall commence...

Section 4909.09 | Ascertainment of valuation.

...e obligation is imposed upon the public utilities commission to ascertain the value of any public utility or railroad, such valuation shall be made in accordance with sections 4901.01 to 4901.14, 4901.17 to 4901.24, 4903.10, 4903.12 to 4903.19, and 4909.04 to 4909.15 of the Revised Code.

Section 4909.11 | Filing and review of findings.

...The public utilities commission shall make and file its findings of fact in writing upon all matters, concerning which evidence has been introduced before it, which in its judgment have bearing on the value of the property of the public utility or railroad affected. Such findings shall be subject to review by the supreme court in the same manner and within the same time as other orders and decisions of the commission...

Section 4909.12 | Admissibility of findings in evidence.

...The findings of the public utilities commission made and filed under section 4909.11 of the Revised Code, when properly certified under the seal of the commission, are admissible in evidence in any action, proceeding, or hearing before the commission or any court, in which the commission, the state or any officer, department, or institution thereof, or any county, municipal corporation, or other body politic, and the...

Section 4909.13 | Additional hearings.

...The public utilities commission may cause further hearings and investigations to be had for the purpose of making revaluations or ascertaining the value of any betterments, improvements, additions, or extensions made by any public utility or railroad subsequent to any prior hearing or investigation, and may examine into all matters which may change, modify, or affect any finding of fact previously made, and may at su...

Section 4909.17 | Approval required for change in rate.

...hall become effective until the public utilities commission, by order, determines it to be just and reasonable, except as provided in this section and sections 4909.18, 4909.19, and 4909.191 of the Revised Code. Such sections do not apply to any rate, joint rate, toll, classification, charge, or rental, or any regulation or practice affecting the same, of railroads, street and electric railways, for-hire motor ...

Section 4909.171 | Basing waterworks rate charge on change in water cost imposed by local government.

...may submit an application to the public utilities commission for an increase or decrease in any rate or charge for, respectively, water or sewage treatment, if both of the following conditions are met: (1) The water or sewage treatment is provided to the company by either of the following: (a) A municipal corporation or other local governmental unit of this state whose rates are not subject to regulation by the c...

Section 4909.173 | Water-works company replacement of water service line.

...(A) As used in this section and section 4909.174 of the Revised Code: (1) "Customer-owned water service line" means the water service line connected to the water-works company's water service line at the curb of a customer's property. (2) "Water-works company" means an entity defined under division (G) of section 4905.03 of the Revised Code that is a public utility under section 4905.02 of the Revised Code. (...