Ohio Revised Code Search
| Section |
|---|
|
Section 153.64 | Protecting underground utility facilities during construction of public improvement.
...(b) of this section. (3) "Underground utility facilities" includes any item buried or placed below ground or submerged under water for use in connection with the storage or conveyance of water or sewage; or electronic, telephonic, or telegraphic communications; electricity; petroleum products; manufactured, mixed, or natural gas; synthetic or liquified natural gas; propane gas; or other substances. "Underground uti... |
|
Section 1728.13 | Public utilities.
...ch would be competitive with any public utility as the same is defined in section 4905.02 of the Revised Code or used by any public utility subject to regulation, supervision, or control by any federal regulatory body. (B) A municipal corporation may not acquire by the exercise of the right of eminent domain, for any of the purposes of Chapter 1728. of the Revised Code, any property used by any public utility as the... |
|
Section 3781.25 | One-call utility protection service definitions.
...nter, but not an owner of an individual utility, that exists for the purpose of receiving notice from persons that prepare plans and specifications for or that engage in excavation work, that distributes this information to its members and participants, and that has registered by March 14, 1989, with the secretary of state and the public utilities commission of Ohio under former division (F) of section 153.64 of the ... |
|
Section 3781.27 | Developer or designer notifying protection service of intended excavation.
... In order to ascertain the name of each utility with underground utility facilities located at the proposed excavation site and the types and tolerance zones of those facilities based on current records of the utility, any developer who is planning a project that will require excavation or the designer employed by the developer for the project shall notify a protection service of the location of the proposed excavati... |
|
Section 3781.29 | Marking location of facilities or give notice of no facilities at site.
...ction 3781.28 of the Revised Code, each utility shall review the status of its facilities within the excavation site, locate and mark its underground utility facilities at the excavation site in such a manner as to indicate their course, and report the appropriate information to the protection service for its positive response system. If a utility does not mark its underground utility facilities or contact the excava... |
|
Section 3781.30 | Duties of excavator.
...ings of tolerance zones of underground utility facilities until those markings are no longer required for proper and safe excavations; (3) When approaching and excavating within the tolerance zone of underground utility facilities with powered equipment, require an individual other than the equipment operator, to visually monitor the excavation activity for any indication of the underground utility facility; ... |
|
Section 4905.05 | Scope of jurisdiction.
...ties commission extend to every public utility and railroad, the plant or property of which lies wholly within this state and when the property of a public utility or railroad lies partly within and partly without this state to that part of such plant or property which lies within this state; to the persons or companies owning, leasing, or operating such public utilities and railroads; to the records and accoun... |
|
Section 4905.10 | Assessment for expenses.
...sessed against each railroad and public utility within this state by the commission by first computing an assessment as though it were to be made in proportion to the intrastate gross earnings or receipts, excluding earnings or receipts from sales to other public utilities for resale, of the railroad or public utility for the calendar year next preceding that in which the assessment is made. The commission may inclu... |
|
Section 4905.13 | System of accounts for public utilities.
...or memorandums to be kept by any public utility or railroad for any of its business, no such public utility or railroad shall keep any accounts, records, or memorandums for such business other than those so prescribed, or those prescribed by or under the authority of any other state or of the United States, except such accounts, records, or memorandums as are explanatory of and supplemental to the accounts, records, ... |
|
Section 4905.40 | Issuance of stocks, bonds, and notes.
...(A) A public utility or a railroad may, when authorized by order of the public utilities commission, issue stocks, bonds, notes, and other evidences of indebtedness, payable at periods of more than twelve months after their date of issuance, when necessary: (1) For the acquisition of property, the construction, completion, extension, renewal, or improvement of its facilities, or the improvement of its service... |
|
Section 4905.402 | Acquiring or merging with domestic telephone or electric utility company or holding company.
...ent and policies of a domestic electric utility or a holding company of a domestic electric utility through the ownership of voting securities, by contract, or otherwise, but does not include the power that results from holding an official position or the possession of corporate office with the domestic company or utility or the holding company. Control is presumed to exist if any person, directly or indirectly, owns... |
|
Section 4905.73 | Jurisdiction.
...905.72 of the Revised Code by a public utility. (B) Upon complaint or initiative under division (A) of this section, if the commission finds, after notice and hearing pursuant to section 4905.26 of the Revised Code, that a public utility has violated section 4905.72 of the Revised Code, the commission, by order, shall do all of the following: (1) Rescind the aggrieved consumer's change in service provider; ... |
|
Section 4909.15 | Fixation of reasonable rate.
...ine: (1)(a) With respect to a public utility that is a natural gas, water-works, or sewage disposal system company, or that is an electric light company that chooses not to file a forecasted test period under section 4909.18 of the Revised Code, the valuation as of the date certain of the property of the public utility that is used and useful or, with respect to a natural gas, water-works, or sewage disposal syste... |
|
Section 4909.34 | Power of municipal corporation or group of corporations to fix rate, price, and charge.
...icipal corporations in which any public utility is established may, by ordinance or ordinances, at any time within one year before the expiration of any contract entered into under sections 715.34, 743.26, and 743.28 of the Revised Code between the municipal corporation or group of municipal corporations and such public utility with respect to the rate, price, charge, toll, or rental to be made, charged, demanded, co... |
|
Section 4911.18 | Assessments - consumers' counsel operating fund.
... among and assessed against each public utility within this state, as defined in section 4911.01 of the Revised Code, by first computing an assessment as though it were to be made in proportion to the intrastate gross earnings or receipts of the public utility for the calendar year next preceding that in which the assessment is made, excluding earnings or receipts from sales to other public utilities for resale. The ... |
|
Section 4921.21 | Public utilities transportation safety fund.
...(A) As used in this section, "adjusted credit amount" means the aggregate amount credited to the public utilities transportation safety fund, less the sum of both of the following: (1) The fees collected by the public utilities commission, in accordance with the unified carrier registration plan under section 4921.11 of the Revised Code, that exceed the federal certification of revenue for each year of the plan; (2... |
|
Section 4928.01 | Competitive retail electric service definitions.
... or otherwise controlled by an electric utility, electric services company, electric cooperative, or governmental aggregator subject to certification under section 4928.08 of the Revised Code, to the extent that the agent is under contract with such utility, company, cooperative, or aggregator solely to provide billing and collection for retail electric service on behalf of the utility company, cooperative, or aggreg... |
|
Section 4928.142 | Standard generation service offer price - competitive bidding.
... Revised Code, an electric distribution utility shall establish a standard service offer price for retail electric generation service that is delivered to the utility under a market-rate offer. (1) The market-rate offer shall be determined through a competitive bidding process that provides for all of the following: (a) Open, fair, and transparent competitive solicitation; (b) Clear product definition; (c) S... |
|
Section 4928.34 | Determinations for approval or prescribing of plan.
...l electric service, as specified in the utility's rate unbundling plan required by division (A)(1) of section 4928.31 of the Revised Code, equal the tariff rates determined by the federal energy regulatory commission that are in effect on the date of the approval of the transition plan under sections 4928.31 to 4928.40 of the Revised Code, as each such rate is determined applicable to each particular customer class a... |
|
Section 4928.35 | Schedules containing unbundled rate components set in approved plan.
...928.40 of the Revised Code, an electric utility shall file in accordance with section 4905.30 of the Revised Code schedules containing the unbundled rate components set in the approved plan in accordance with section 4928.34 of the Revised Code. The schedules shall be in effect for the duration of the utility's market development period, shall be subject to the cap specified in division (A)(6) of section 4928.34... |
|
Section 4928.37 | Receiving transition revenues.
...of the Revised Code provide an electric utility the opportunity to receive transition revenues that may assist it in making the transition to a fully competitive retail electric generation market. An electric Utility for which transition revenues are approved pursuant to sections 4928.31 to 4928.40 of the Revised Code shall receive those revenues through both of the following mechanisms beginning on the starting date... |
|
Section 4928.40 | Establishing transition charge for each customer class.
...lowable transition costs of an electric utility authorized for collection as transition revenues under sections 4928.31 to 4928.40 of the Revised Code, the public utilities commission, by order under section 4928.33 of the Revised Code, shall establish the transition charge for each customer class of the electric utility and, to the extent possible, each rate schedule within each such customer class, with all such tr... |
|
Section 4928.64 | Electric distribution utility to provide electricity from qualifying renewable energy resources.
...egration into the electric distribution utility's demand-response, energy efficiency, or peak demand reduction programs as provided under division (A)(2)(c) of section 4928.66 of the Revised Code, including, but not limited to, any of the following: (i) A resource that has the effect of improving the relationship between real and reactive power; (ii) A resource that makes efficient use of waste heat or other th... |
|
Section 4928.66 | Implementing energy efficiency programs.
...nning in 2009, an electric distribution utility shall implement energy efficiency programs that achieve energy savings equivalent to at least three-tenths of one per cent of the total, annual average, and normalized kilowatt-hour sales of the electric distribution utility during the preceding three calendar years to customers in this state. An energy efficiency program may include a combined heat and power system pla... |
|
Section 4935.04 | Energy information and reports.
... As used in this chapter: (1) "Major utility facility" means: (a) An electric transmission line and associated facilities of a design capacity of one hundred twenty-five kilovolts or more; (b) A gas or natural gas transmission line and associated facilities designed for, or capable of, transporting gas or natural gas at pressures in excess of one hundred twenty-five pounds per square inch. "Major utility fac... |