Ohio Administrative Code Search
Rule |
---|
Rule 3745-50-11 | Incorporated by reference.
... (High-Precision Method)". (xvi) ASTM D323-20a, "Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method)," approved in 2020. (xvii) Representative sampling methods for: (a) "Standard Guide for Representative Sampling for Management of Waste and Media," ASTM standard D6044-96(2009), approved in 1996 and reapproved in 2009. (b) "Practice for Sampling Soils and Conta... |
Rule 3745-50-11 | Incorporated by reference.
... (High-Precision Method)". (xvi) ASTM D323-20a, "Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method)," approved in 2020. (xvii) Representative sampling methods for: (a) "Standard Guide for Representative Sampling for Management of Waste and Media," ASTM standard D6044-96(2009), approved in 1996 and reapproved in 2009. (b) "Practice for Sampling Soils and Conta... |
Rule 3745-50-11 | Incorporated by reference.
...ts (Reid Method)," ASTM standard D323-20a, approved in 2020. (xvii) Representative sampling methods for: (a) "Standard Guide for Representative Sampling for Management of Waste and Media," ASTM standard D6044-96(2009), approved in 1996 and reapproved in 2009. (b) "Practice for Sampling Soils and Contaminated Media with Hand Operated Bucket Auger," ASTM standard D6907-2005(2010), appro... |
Rule 3745-50-40 | Submittal of hazardous waste permit applications.
...(A) New hazardous waste facilities. (1) No person shall begin physical construction of a new hazardous waste facility without having submitted "Part A" and "Part B" of a permit application to the director and having received an effective Ohio hazardous waste facility installation and operation permit. An application shall be submitted to the director at least one hundred eighty days before physical construction is e... |
Rule 3745-50-40 | Submittal of hazardous waste permit applications.
...) New hazardous waste facilities. (1) No person shall begin physical construction of a new hazardous waste facility without having submitted "Part A" and "Part B" of a permit application to the director and having received an effective Ohio hazardous waste facility installation and operation permit. An application shall be submitted to the director at least one hundred eighty days before phys... |
Rule 3745-50-40 | Submittal of hazardous waste permit applications.
...) New hazardous waste facilities. (1) No person shall begin physical construction of a new hazardous waste management facility without having submitted "Part A" and "Part B" of a permit application to the director and having received an effective Ohio hazardous waste facility installation and operation permit. An application shall be submitted to the director at least one hundred eighty days ... |
Rule 3745-50-41 | Application for a permit.
...quirements for specific permits: (1) Persons covered by paragraph (A) of rule 3745-50-46 of the Administrative Code need not apply. (2) Persons currently authorized with a permit by rule under paragraph (C) of rule 3745-50-40 of the Administrative Code shall submit to the director a "Part B" application for a hazardous waste facility installation and operation permit for the facility wi... |
Rule 3745-50-42 | Signatories to permit applications and reports.
...tions shall be signed as follows: (1) For a corporation. By a responsible corporate officer. For the purpose of this rule, a "responsible corporate officer" means: (a) A president, secretary, treasurer, or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation; or (... |
Rule 3745-50-44 | Contents of "Part B" of the permit application.
... information specified in paragraph (C)(14) of this rule is required in "Part B" of the permit application. As used in this rule, "in operation" has the same meaning as in paragraph (A) of rule 3745-50-10 of the Administrative Code. "Part B" of the permit application includes the following: (A) The following information is required for all hazardous waste facilities, except as rule 3745-54-01 of the Administrative C... |
Rule 3745-50-44 | Contents of "Part B" of the permit application.
... information specified in paragraph (C)(14) of this rule is required in "Part B" of the permit application. As used in this rule, "in operation" has the same meaning as in rule 3745-50-10 of the Administrative Code. "Part B" of the permit application includes the following: (A) The following information is required for all hazardous waste facilities, except as rule 3745-54-01 of the Administrative Co... |
Rule 3745-50-44 | Contents of "Part B" of the permit application.
... information specified in paragraph (C)(14) of this rule is required in "Part B" of the permit application. As used in this rule, "in operation" has the same meaning as in rule 3745-50-10 of the Administrative Code. "Part B" of the permit application includes the following: (A) General information requirements. The following information is required for all hazardous waste management facilities, excep... |
Rule 3745-50-44 | Contents of "Part B" of the permit application.
... information specified in paragraph (C)(14) of this rule is required in "Part B" of the permit application. As used in this rule, "in operation" has the same meaning as in rule 3745-50-10 of the Administrative Code. "Part B" of the permit application includes: (A) General information requirements. The following information is required for all hazardous waste management facilities, except as rule 3745... |
Rule 3745-50-45 | Special inclusions and exclusions for hazardous waste permits.
...s identified or listed in Chapter 3745-51 of the Administrative Code. The terms "treatment," "storage," "disposal," and "hazardous waste" are defined in rule 3745-50-10 of the Administrative Code. Owners and operators of hazardous waste management units shall have permits during the active life (including the closure period) of the unit. Owners or operators of surface impoundments, landfills, ... |
Rule 3745-50-45 | Special inclusions and exclusions for hazardous waste permits.
...s identified or listed in Chapter 3745-51 of the Administrative Code. The terms "treatment," "storage," "disposal," and "hazardous waste" are defined in rule 3745-50-10 of the Administrative Code. Owners and operators of hazardous waste management units shall have permits during the active life (including the closure period) of the unit. Owners or operators of surface impoundments, landfills, ... |
Rule 3745-50-46 | Permits by rule.
...works meets the following conditions: (1) Has an Ohio national pollutant discharge elimination system (NPDES) permit that complies with the following: (a) The conditions of the NPDES permit. (b) The following rules: (i) Rule 3745-54-11 of the Administrative Code, U.S. EPA identification number. (ii) Rule 3745-54-71 of the Administrative Code, use of manifest system. (iii) Rule 3745-54-72 of ... |
Rule 3745-50-46 | Permits by rule.
...the following conditions are met: (1) The POTW has an Ohio national pollutant discharge elimination system (NPDES) permit that complies with: (a) The conditions of the NPDES permit; and (b) The following rules: (i) Rule 3745-54-11 of the Administrative Code, U.S. EPA identification number; (ii) Rule 3745-54-71 of the Administrative Code, use of manifest system; (iii) Rule 3745-54-72 of ... |
Rule 3745-50-46 | Permits by rule.
...the following conditions are met: (1) The POTW has an Ohio national pollutant discharge elimination system (NPDES) permit that complies with: (a) The conditions of the NPDES permit; and (b) The following rules: (i) Rule 3745-54-11 of the Administrative Code, U.S. EPA identification number; (ii) Rule 3745-54-71 of the Administrative Code, use of manifest system; (iii) Rule 3745-54-72 of ... |
Rule 3745-50-49 | Effect of a permit.
...(A) Effect of a permit. (1) Compliance with an Ohio hazardous waste permit during the term of the permit constitutes compliance, for purposes of enforcement, with Chapters 3745-51 to 3745-53, 3745-54 to 3745-57 and 3745-205, 3745-65 to 3745-69 and 3745-256, 3745-266, 3745-270, 3745-273, and 3745-279, and rules 3745-50-40 to 3745-50-235 of the Administrative Code, except for those requirements not... |
Rule 3745-50-49 | Effect of a permit.
...(A) (1) Compliance with an Ohio hazardous waste permit during the term of the permit constitutes compliance, for purposes of enforcement, with Chapters 3745-50 to 3745-53, 3745-54 to 3745-57 and 3745-205, 3745-65 to 3745-69 and 3745-256, 3745-266, 3745-270, 3745-273, and 3745-279 of the Administrative Code, except for those requirements not included in the permit which: (a) Become effective by... |
Rule 3745-50-49 | Effect of a permit.
...(A) (1) Compliance with an Ohio hazardous waste permit during the term of the permit constitutes compliance, for purposes of enforcement, with the hazardous waste rules except for those requirements not included in the permit which: (a) Become effective by Ohio statute; (b) Are promulgated under Chapter 3745-270 of the Administrative Code restricting the placement of hazardous wastes in or on the... |
Rule 3745-50-50 | Schedules of compliance.
...ed Code and rules adopted thereunder. (1) Time for compliance. Any schedule of compliance under this rule shall require compliance as soon as possible. (2) Interim dates. Except as provided in paragraph (B)(1)(b) of this rule, if a permit establishes a schedule of compliance which exceeds one year from the date of permit issuance, the schedule shall provide interim requirements and the dates for their achievement. ... |
Rule 3745-50-51 | Permit modifications.
...only if any of the following applies: (1) The permittee desires to accomplish alterations, additions, or deletions to the permitted facility or to undertake alterations, additions, deletions, or activities that are inconsistent with or not authorized by the existing permit. (2) New information or data justify permit conditions in addition to or different from those in the existing permit. (3) The standards, criter... |
Rule 3745-50-51 | Permit modifications.
...only if any of the following applies: (1) The permittee desires to accomplish alterations, additions, or deletions to the permitted facility or to undertake alterations, additions, deletions, or activities that are inconsistent with or not authorized by the existing permit. (2) New information or data justify permit conditions in addition to or different from those in the existing permit. (3) T... |
Rule 3745-50-51 | Permit modifications.
...request of the permittee only if: (1) The permittee desires to accomplish alterations, additions, or deletions to the permitted facility or to undertake alterations, additions, deletions, or activities that are inconsistent with or not authorized by the existing permit; or (2) New information or data justify permit conditions in addition to or different from those in the existing permit; or ... |
Rule 3745-50-51 | Permit modifications.
...3745-50-320 and 3745-50-700 to 3745-50-711 of the Administrative Code. A hazardous waste facility permit may be modified at the request of the director or upon the written request of the permittee only if: (1) The permittee desires to accomplish alterations, additions, or deletions to the permitted facility or to undertake alterations, additions, deletions, or activities that are inconsistent with or... |