Skip to main content
Back To Top Top Back To Top
This website publishes administrative rules on their effective dates, as designated by the adopting state agencies, colleges, and universities.

Ohio Administrative Code Search

Busy
 
Keywords
:
1-719-323-9442
{"removedFilters":"","searchUpdateUrl":"\/ohio-administrative-code\/search\/update-search","keywords":"1-719-323-9442","start":1501,"pageSize":25,"sort":"BestMatch"}
Results 1,501 - 1,525 of 10,196
Sort Options
Sort Options
Rules
Rule
Rule 1501:13-11-02 | Support facilities and utility installations.

...n paragraphs (A)(30) to (A)(36) of rule 1501:13-4-08 of the Administrative Code and paragraph (A)(23) of rule 1501:13-4-08.1 of the Administrative Code, submittal of narrative explanations and descriptions as required in paragraphs (A)(2)(b) and (B)(1)(d) of rules 1501:13-4-05 and 1501:13-4-14 of the Administrative Code, and submittal of descriptions, including maps and cross-sections, as required in paragraph (M) of...

Rule 1501:13-11-02 | Support facilities and utility installations.

...n paragraphs (A)(30) to (A)(36) of rule 1501:13-4-08 of the Administrative Code and paragraph (A)(23) of rule 1501:13-4-08.1 of the Administrative Code, submittal of narrative explanations and descriptions as required in paragraphs (A)(2)(b) and (B)(1) of rules 1501:13-4-05 and 1501:13-4-14 of the Administrative Code, and submittal of descriptions, including maps and cross-sections, as required in...

Rule 1501:13-12-01 | Underground operations.

...d operations shall comply with Chapters 1501:13-1 to 1501:13-14 of the Administrative Code except where indicated otherwise. (B) Underground operations shall comply with all applicable requirements of Chapter 1513. of the Revised Code.

Rule 1501:13-12-03 | Subsidence control.

...(A) The permittee shall either: (1) Adopt measures consistent with known technology which prevent subsidence from causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of surface lands; or (2) Adopt mining technology which provides for planned subsidence in a predictable and controll...

Rule 1501:13-12-03 | Subsidence control.

...(A) The permittee shall either: (1) Adopt measures consistent with known technology which prevent subsidence from causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of surface lands; or (2) Adopt mining technology which provides for planned subsidence in a predictable and controll...

Rule 1501:13-13-03 | Operations on prime farmland.

...hall meet the following requirements: (1) A permit shall be obtained for those operations under paragraph (F) of rule 1501:13-4-12 of the Administrative Code; and (2) Soil materials to be used in the reconstruction of the prime farmland soil shall be removed before drilling, blasting, or mining, in accordance with paragraphs (B) and (C) of this rule and in a manner that prevents mixing or contaminating these materi...

Rule 1501:13-13-08 | Restoration off the permit area by means of mitigation.

...(A) General requirements. (1) The permittee shall restore on the permit area streams and wetlands affected by mining operations unless the chief approves restoration off the permit area by means of mitigation pursuant to division (A)(25) of section 1513.16 of the Revised Code and this rule. (2) An applicant's or permittee's request for restoration off the permit area pursuant to division (A)...

Rule 1501:13-13-08 | Restoration off the permit area by means of mitigation.

...(A) General requirements. (1) The permittee shall restore on the permit area streams and wetlands affected by mining operations unless the chief approves restoration off the permit area by means of mitigation pursuant to division (A)(25) of section 1513.16 of the Revised Code and this rule. (2) An applicant's or permittee's request for restoration off the permit area pursuant to division (A)...

Rule 1501:13-14-01 | Inspections.

...(A) For purposes of this rule: (1) "Chief" shall mean the chief, his or her authorized representative, or any inspection officer. (2) "Inactive coal mining and reclamation operation" means an operation: (a) For which the chief has secured from the permittee the written notice required under paragraph (A) of rule 1501:13-9-16 of the Administrative Code; or (b) For which reclamation phase II...

Rule 1501:13-14-01 | Inspections.

...(A) For purposes of this rule: (1) "Chief" shall mean the chief, his or her authorized representative, or any inspection officer. (2) "Inactive coal mining and reclamation operation" means an operation: (a) For which the chief has secured from the permittee the written notice required under paragraph (A) of rule 1501:13-9-16 of the Administrative Code; or (b) For which reclamation phase II...

Rule 1501:13-14-02 | Enforcement.

...(A) Cessation orders. (1) Imminent danger; significant harm. (a) An authorized representative of the chief shall immediately order a cessation of coal mining and reclamation operations or of the relevant portion thereof, if he or she finds on the basis of any inspection, any condition or practice, or any violation of Chapter 1513. of the Revised Code or rules adopted thereunder, or any condition...

Rule 1501:13-14-03 | Civil penalties.

...he penalty, the chief shall consider: (1) The permittee's history of previous violations at the particular coal mining operation; (2) The seriousness of the violation, including any irreparable harm to the environment and any hazard to the health or safety of the public; (3) Whether the permittee was negligent; (a) "Negligence" means the failure of a permittee to prevent the occurrence of any violation of the con...

Rule 1501:13-14-03 | Civil penalties.

... penalty, the chief shall consider: (1) The permittee's history of previous violations at the particular coal mining operation; (2) The seriousness of the violation, including any irreparable harm to the environment and any hazard to the health or safety of the public; (3) Whether the permittee was negligent; (a) "Negligence" means the failure of a permittee to prevent the occurrence of ...

Rule 1501:13-14-04 | Petition for fees.

...(A) Award of costs and expenses. (1) Any person may file a petition for award of costs and expenses including attorneys' fees reasonably incurred as a result of that person's participation in any administrative proceeding under Chapter 1513. of the Revised Code which results in a final order being issued by the chief. (2) The petition for an award of costs and expenses including attorneys' fees must be filed with t...

Rule 1501:13-14-05 | Informal conferences.

...n accordance with paragraph (E) of rule 1501:13-7-02 of the Administrative Code, may, in writing, request that the chief hold an informal conference on the application for a permit or application for significant revision or renewal of a permit or on the proposed performance security adjustment. The request shall: (1) Briefly summarize the issues to be raised at the conference by the person requesting the conference;...

Rule 1501:13-14-06 | Individual civil penalties.

...tions. For the purposes of this rule: (1) "Violation" means a violation of any requirement of Chapter 1513. of the Revised Code, rules adopted thereunder, or of any permit condition. (2) "Failure or refusal" means a failure or refusal to comply with any notice of violation or order of the chief issued under Chapter 1513. of the Revised Code, except that non-payment of civil penalties assessed against a corporate pe...

Rule 1501:14-1-01 | Definitions.

...As used in Chapters 1501:14-1 to 1501:14-6 of the Administrative Code, except as may be otherwise specifically provided in the rules adopted pursuant to Chapter 1514. of the Revised Code: (A) "Accident," as used in division (C) of section 1514.40 of the Revised Code, means an accident as defined in paragraph (h) of 30 C.F.R. 50.2. (B) "Acid Drainage" means the flow of acid water resulting from a sur...

Rule 1501:14-1-01 | Definitions.

...As used in Chapters 1501:14-1 to 1501:14-6 of the Administrative Code, except as may be otherwise specifically provided in the rules adopted pursuant to Chapter 1514. of the Revised Code: (A) "Accident," as used in division (C) of section 1514.40 of the Revised Code, means an accident as defined in paragraph (h) of 30 C.F.R. 50.2. (B) "Acid Drainage" means the flow of acid water resulting from a sur...

Rule 1501:14-1-04 | Procedure for filing applications.

...tantial information required by Chapter 1514. of the Revised Code and rules adopted pursuant thereto. (B) Each application for a surface mining permit or for an amendment to a surface mining permit shall be in the format required by the chief and shall be filed at the address, "Division of Mineral Resources Management, 2045 Morse Road, Building H, Columbus, Ohio 43229." (C) Each application for ...

Rule 1501:14-1-04 | Procedure for filing applications.

...tantial information required by Chapter 1514. of the Revised Code and rules adopted pursuant thereto. (B) Each application for a surface mining permit or for an amendment to a surface mining permit shall be in the format required by the chief and shall be filed at the address, "Division of Mineral Resources Management, 2045 Morse Road, Building H, Columbus, Ohio 43229." (C) Each application for ...

Rule 1501:14-1-04 | Procedure for filing applications.

...tantial information required by Chapter 1514. of the Revised Code and rules adopted pursuant thereto. (B) Each application for a surface mining permit or for an amendment to a surface mining permit shall be in the format required by the chief and be filed at the address, "Division of Mineral Resources Management, 2045 Morse Road, Building H, Columbus, Ohio 43229." (C) Each application for a surf...

Rule 1501:14-1-05 | Permit transfers.

...(A) Transfer of permit rights. (1) Any person seeking to succeed by transfer to the rights granted by a permit shall submit an application for a transfer of a surface mining permit. Such application shall be on forms prescribed by the chief and shall include at a minimum: (a) The name and address of the existing permittee and the permit number; (b) The information required by divisions (A)(1), (A)(7), and (A)(8) o...

Rule 1501:14-1-05 | Permit transfers.

...(A) Transfer of permit rights. (1) Submission of an application for transfer of a surface mining permit is necessary for any person seeking to succeed by transfer to the rights granted by a permit. The chief will prescribe forms for the application that request, at a minimum: (a) The name and address of the existing permittee and the permit number; (b) The information required by divisions ...

Rule 1501:14-1-09 | Payment of fees and filing of performance bond.

...amendment to a surface mining permit. (1) The requirement of division (A) of section 1514.04 of the Revised Code that the applicant file a surety bond, cash, an irrevocable letter of credit, or certificates of deposit in the amount of ten thousand dollars shall not apply to permits of twenty or fewer acres issued prior to August 15, 2002. These permits shall instead file a surety bond, cash, an i...

Rule 1501:14-1-09 | Payment of fees and filing of performance bond.

...amendment to a surface mining permit. (1) The requirement of division (A) of section 1514.04 of the Revised Code that the applicant file a surety bond, cash, an irrevocable letter of credit, or certificates of deposit in the amount of ten thousand dollars do not apply to permits of twenty or fewer acres issued prior to August 15, 2002. For these permits, any of the following is to be filed: a sur...