Section 4906.08 | Parties - testimony.
...rtification proceeding shall include: (1) The applicant; (2) Each person entitled to receive service of a copy of the application under division (B) of section 4906.06 of the Revised Code, if the person has filed with the power siting board a notice of intervention as a party, within thirty days after the date the person was served with a copy of the application; (3) Any person residing in a municipal corporation ... |
Section 4906.20 | Certificate required to construct certain wind farms.
...dred twenty days after June 24, 2008. (1) The rules shall provide for an application process for certificating economically significant wind farms that is identical to the extent practicable to the process applicable to certificating major utility facilities under sections 4906.06, 4906.07, 4906.08, 4906.09, 4906.10, 4906.11, and 4906.12 of the Revised Code and shall prescribe a reasonable schedule of application fi... |
Section 4906.201 | Setback requirements.
...ion 4906.20 of the Revised Code. (B)(1) For any existing certificates and amendments thereto, and existing certification applications that have been found by the chairperson to be in compliance with division (A) of section 4906.06 of the Revised Code before the effective date of the amendment of this section by H.B. 59 of the 130th general assembly, September 29, 2013, the distance shall be seven hundred fif... |
Section 4906.21 | Decommissioning plan for solar and wind generation required.
...oses of this section and sections 4906.21 to 4906.232 of the Revised Code: (1) "Applicant" means an applicant for a certificate, or a material amendment to an existing certificate, from the power siting board to construct, operate, or maintain a utility facility, and includes any subsequent person to whom the certificate is transferred. (2) "Material amendment" and "utility facility" have the same meanings as in ... |
Section 4906.211 | Decommissioning plan requirements and estimated costs.
... power siting board under section 4906.21 of the Revised Code shall be prepared by a professional engineer registered with the state board of registration for professional engineers and surveyors. The board may reject the engineer chosen by the applicant and to require the applicant to choose another qualified engineer. (B) The plan shall contain the following: (1) A list of all parties responsible for decommissi... |
Section 4906.30 | No power siting board certificate or amendment for nonconformity.
...poses of this section and section 4906.31 of the Revised Code, "material amendment" and "utility facility" have the same meanings as in section 303.57 of the Revised Code. (B) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, to be constr... |
Section 4906.31 | Power siting board application provided to township and county.
...ded in any of the following formats: (1) Paper copy; (2) Electronic format; (3) An electronic communication containing a link to the application, if posted on the board's web site. |
Section 4906.97 | Notice and hearing of complaint.
... shall consider all of the following: (1) The gravity of the violation; (2) The person's history of prior violations; (3) The person's good faith efforts to comply and undertake corrective action; (4) The person's ability to pay the forfeiture; (5) The cost of the project; (6) The effect of the forfeiture on the person's ability to continue as an applicant; (7) Such other matters as justice requires. (D) The ... |
Section 4907.472 | Grade crossing protection fund.
...ction fund for the purpose of paying: (1) The public share of the cost of reducing hazards at public highway-railway crossings at any location where a railway and a public highway intersect each other at a common grade, when such protection is ordered by the public utilities commission pursuant to section 4907.47, 4907.471, or 4907.49 of the Revised Code; (2) The costs incurred by the commission in administering se... |
Section 4909.04 | Valuation of property to determine justice of rates.
...ery public utility or railroad shall: (1) Furnish to the commission, or to its agents, as the commission requires, maps, profiles, schedules of rates and tariffs, contracts, reports of engineers, and other documents, records, and papers, or copies of any of them, in aid of any investigation and ascertainment of the value of its property; (2) Grant to the commission or its agents free access to all of its premises a... |
Section 4909.052 | Evaluation of petition for purchase of municipal water-works or sewage disposal system; acceptance of cost report.
...petition submitted under section 4905.481 of the Revised Code shall accept the original cost, reported under division (C)(3) of section 4909.05 of the Revised Code, of the acquisition of a municipal water-works or sewage disposal system company that is acquired by a large water-works or sewage disposal system company, provided that the original cost is determined according to all of the following requirements: (A) ... |
Section 4909.159
...recasted test period under division (C)(1)(a) of section 4909.15 of the Revised Code shall provide any financial information required by that section from the company's full books. The public utilities commission shall ensure appropriate protections against the disclosure of the company's trade secrets or proprietary information. |
Section 4909.174 | Water-works company reimburse customer for replacement of water service line.
...ine, if both of the following occur: (1) The company confirms that the customer-owned water service line was composed of lead or other composition that was mandated or ordered to be replaced by law or a state or federal regulatory agency; (2) The customer submits the reimbursement request to the company not later than twelve months after the completion of the water line replacement. (B) A water-works company th... |
Section 4909.19 | Publication of notice - investigation.
... increase provided for by section 4909.18 of the Revised Code the public utility shall forthwith publish notice of such application, in a form approved by the public utilities commission, once a week for two consecutive weeks in a newspaper published and in general circulation throughout the territory in which such public utility operates and directly affected by the matters referred to in said application. Th... |
Section 4909.191 | Submission of rate or charge adjustments or recalculations after actual data acquired.
...on, under division (D) of section 4909.15 of the Revised Code, incorporated proposed adjustments to revenues and expenses into the commission's determination under that section, the natural gas, water-works, or sewage disposal system company shall, not later than ninety days after actual data for all of the incorporated adjustments becomes known, submit to the commission proposed rate or charge adjustments tha... |
Section 4909.21 | Rules and regulations relative to carload shipments of livestock.
...s for carload lot shipments in cares: (1) Of a length of thirty-six and seven-tenths feet or under, the rate charged shall be on a basis of a minimum weight of not more than sixteen thousand pounds for single-deck cars, and twenty-two thousand pounds for double-deck cars; (2) Of a length exceeding thirty-six and seven-tenths feet, and not more than forty feet, the rate charged shall be on a basis of minimum weight ... |
Section 4911.01 | Consumers' counsel definitions.
...not for profit, except the following: (1) Electric light companies that operate their utilities not for profit; (2) Public utilities, other than telephone companies, that are owned and operated exclusively by and solely for the utilities' customers; (3) Public utilities that are owned or operated by any municipal corporation; (4) Railroads as defined in sections 4907.02 and 4907.03 of the Revised Code. (B) ... |
Section 4911.02 | Consumers' counsel - powers and duties.
...ce at the pleasure of the board. (B)(1) The counsel may sue or be sued and has the powers and duties granted the counsel under this chapter, and all necessary powers to carry out the purposes of this chapter. (2) Without limitation because of enumeration, the counsel: (a) Shall have all the rights and powers of any party in interest appearing before the public utilities commission regarding examination and c... |
Section 4911.18 | Assessments - consumers' counsel operating fund.
...in this state, as defined in section 4911.01 of the Revised Code, by first computing an assessment as though it were to be made in proportion to the intrastate gross earnings or receipts of the public utility for the calendar year next preceding that in which the assessment is made, excluding earnings or receipts from sales to other public utilities for resale. The office may include in that first computation any am... |
Section 4913.05 | Request for imposition of fine or penalty.
...(A) Beginning January 1, 2016, an aggrieved person may request an inquiry with the staff of the public utilities commission seeking the imposition, in accordance with this chapter, of a fine or penalty on the person responsible for the alleged compliance failure described in division (A) of section 4913.01 of the Revised Code. The person shall make the request not later than ninety days after discovering the alleged ... |
Section 4913.20 | Factors to be considered.
... action should be taken under section 4913.15, 4913.16, 4913.171, 4913.19, or 4913.25 of the Revised Code, the underground technical committee, the public utilities commission, and the commission staff, as applicable, shall consider the following factors, as they apply: (A) The person's demonstrated history of one-call, design, and excavation practices, including the following: (1) The number of locate requests rec... |
Section 4913.31 | Underground utility damage prevention grant program.
...ts for any of the following purposes: (1) Public awareness programs established by a protection service; (2) Training and education programs for excavators, operators, designers, persons who locate underground utility facilities, or other persons; (3) Programs providing incentives for excavators, operators, persons who locate underground utility facilities, or other persons to reduce the number and severity of com... |
Section 4913.43 | Annual report.
...t shall be submitted on or before April 1. Each report shall be made publicly available on the commission's web site. |
Section 4921.03 | Certificate required.
...erson who does all of the following: (1) Files with the commission, in accordance with rules adopted under section 4921.05 of the Revised Code, a complete and accurate application that shall include a certification that (a) the person understands and is in compliance with the applicable service, operation, and safety laws of this state and (b) the person meets the requirements of section 4921.09 of the Revised... |
Section 4921.25 | Towing entities subject to chapter.
...mission shall adopt rules under Chapter 119. of the Revised Code that do all of the following: (1) Establish the acceptable scope of public safety regulations applicable to a for-hire motor carrier engaged in the towing of motor vehicles under section 4513.60, 4513.601, or 4513.61 of the Revised Code that a county or township may adopt pursuant to a resolution; (2) Establish safety standards for the type of equipme... |