Ohio Revised Code Search
| Section |
|---|
|
Section 3731.04 | Types of accommodations offered by hotels.
...s. (C) All of the requirements for the construction and operation of transient hotels and extended stay hotels, including the provisions applicable to transient sleeping rooms and temporary residence dwelling units, apply to hotels as defined in division (A)(1) of section 3731.01 of the Revised Code with a total number of guestrooms, including transient sleeping rooms or extended stay dwelling units, that is g... |
|
Section 3733.42 | Labor camp rules.
...ssuance of licenses, location, layout, construction, approval of plans, sanitation, safety, operation, use, and maintenance of agricultural labor camps. The rules shall establish minimum standards of habitability with which a licensee shall comply in operating an agricultural labor camp. The rules shall establish, beyond minimum standards of habitability, additional standards of habitability for those camps an... |
|
Section 3734.021 | Standards for generators and transporters of infectious wastes and owners and operators of treatment facilities.
...or; (b) Govern the location, design, construction, and operation of infectious waste treatment facilities. The rules adopted under division (B)(2)(b) of this section shall require that a new infectious waste incineration facility be located so that the incinerator unit and all areas where infectious wastes are handled on the premises where the facility is proposed to be located are at least three hundred feet insi... |
|
Section 3734.041 | Explosive gas monitoring plan for landfill.
... the numbers, locations, and design and construction of monitoring wells; quality control procedures to be followed by persons conducting those evaluations to ensure the accuracy of the monitoring; the frequency for sampling the monitoring wells, which shall be at least quarterly, except as otherwise provided in this division; and the frequency of reporting monitoring results to the director and board of health. The ... |
|
Section 3734.06 | Annual fee for solid waste facility license - special fund - special infectious waste fund.
...r the purpose of regulating the design, construction, and operation of a solid waste facility. For the purpose of determining applicable license fees under this section, the authorized maximum daily waste receipt so stated shall be converted from cubic yards to tons as the unit of measurement based upon a conversion factor of three cubic yards per ton for compacted wastes generally and one cubic yard per ton for bale... |
|
Section 3734.061 | Waste management fund.
...to solid wastes, infectious wastes, and construction and demolition debris. The agency also shall use money in the fund to address violations of Chapters 3704. and 6111. of the Revised Code at facilities regulated under this chapter and Chapter 3714. of the Revised Code. |
|
Section 3734.123 | Assessment of commercial hazardous waste incinerator capacity in state.
...n of the hazardous waste incinerator or construction of a new hazardous waste incinerator prior to the effective date of this amendment. |
|
Section 3734.23 | Acquiring facility constituting imminent and substantial threat - restoration contracts.
...e plan by contracting for the services, construction, and necessary repairs. (D) The director shall keep an itemized record of the costs of any acquisition under division (A) of this section and the costs of cleanup under division (B) of this section. |
|
Section 3734.281 | Environmental protection remediation fund.
...e facility, a solid waste facility, a construction and demolition debris facility licensed under Chapter 3714. of the Revised Code, or another location at which the director has reason to believe there is a substantial threat to public health or safety or the environment. Remediation may include the direct and indirect costs associated with the overseeing, supervising, performing, verifying, or revi... |
|
Section 3734.48 | Coal combustion residuals.
...itoring requirements; (4) Design and construction requirements; (5) Financial assurance requirements; (6) Closure and post-closure requirements; (7) Any other requirement that the director determines is necessary for the administration of this section. (C) Except as provided in division (D) of this section, a coal combustion residuals unit that is subject to rules adopted under this section or 40 C.F.R... |
|
Section 3734.52 | Establishing county or joint solid waste management districts.
...of the district prohibits or limits the construction, operation, use, repair, or maintenance of the facility or the establishment and collection of rates or charges for use of the facility, regardless of whether the facility complies with the district's plan or amended plan, until such time as the principal of and interest on any such bonds or loan have been paid in full or until the owner abandons the facility. The... |
|
Section 3734.57 | Fees for waste disposal.
... materials or products disposed of at a construction and demolition debris facility that is licensed under Chapter 3714. of the Revised Code or at a solid waste facility that is licensed under this chapter. (2) Except as provided in section 3734.571 of the Revised Code, any fees levied under division (B)(1) of this section apply to solid wastes originating outside the boundaries of a county or joint district that ... |
|
Section 3734.573 | Fee for generation of solid wastes within district.
...materials or products disposed of at a construction and demolition debris facility that is licensed under Chapter 3714. of the Revised Code or at a solid waste facility that is licensed under this chapter. (I) When solid wastes that are burned in a disposal facility that is an incinerator or energy recovery facility are delivered to a solid waste transfer facility prior to being transported to the incinerator ... |
|
Section 3734.71 | Scrap tire storage facilities rules.
...andards governing the location, design, construction, operation, and closure of scrap tire storage facilities, including, without limitation, standards governing facilities for the storage of scrap tires by submergence in a body of water; (B) Specify the criteria that the owner or operator of an existing or proposed scrap tire storage facility shall consider in determining whether to apply for a registration certifi... |
|
Section 3734.72 | Scrap tire monocell and monofill facilities rules.
...andards governing the location, design, construction, operation, closure, and post-closure care of scrap tire monocell and monofill facilities, including, without limitation, standards governing facilities for the storage or disposal of whole scrap tires by submergence in a body of water; (B) Require submission to the director of a surety bond, a letter of credit, or other acceptable financial assurance, as specifie... |
|
Section 3734.73 | Scrap tire recovery facilities rules.
...andards governing the location, design, construction, operation, and closure of scrap tire recovery facilities; (C) Specify the criteria that the owner or operator of an existing or proposed scrap tire recovery facility shall consider in determining whether to apply for a registration certificate or a permit for the facility, which shall be based on the approximate number or quantity in weight or volume of scrap tir... |
|
Section 3735.31 | Metropolitan housing authority - powers and duties.
... older; engage in, or contract for, the construction, reconstruction, alteration, or repair, or both, of any housing project or part of any housing project; participate in partnerships or joint ventures relating to the development of housing or projects with other public or private entities; include in any contract let in connection with a project, stipulations requiring that the contractor and any subcontractors com... |
|
Section 3735.40 | Housing project definitions.
... demolition of existing structures, the construction, reconstruction, alteration, and repair of the improvements, and all other work in connection therewith. (D) "Families of low income" and "persons of low income" mean persons or families who lack the amount of income which is necessary, as determined by the metropolitan housing authority undertaking the housing project, to enable them, without financial assistanc... |
|
Section 3735.47 | Additional powers of authority relative to issuance of bonds.
...on of special funds for moneys held for construction or operating costs, contingencies, debt service, reserves, or other purposes, and covenant as to the deposit, use, and disposition of the moneys held in such funds; (F) Prescribe the procedure by which the terms of any contract with bondholders may be amended or abrogated, the amount of bonds the holders of which must consent thereto, and the manner in which such ... |
|
Section 3735.65 | Community reinvestment area definitions.
...ignificance are located and new housing construction and repair of existing facilities or structures are discouraged. (C) "Remodeling" means any change made in a structure for the purpose of making it structurally more sound, more habitable, or for the purpose of improving its appearance. (D) "Structure of historical or architectural significance" means those designated as such by resolution of the legislative ... |
|
Section 3737.17 | Small government fire department services revolving loan program.
...ces; (2) To expedite projects for the construction or renovation of fire department buildings. A loan for either purpose under the small government fire department services revolving loan program is not to carry interest, and is to be repaid within a term of not longer than twenty years. A qualifying small government is not eligible to receive a loan for a project or purchase under the program unless the qualifyi... |
|
Section 3737.81 | State fire council.
...uids industry, one shall represent the construction industry, and one shall represent the public. At no time shall more than six members be members of or associated with the same political party. Membership on the council shall not constitute holding a public office, and no person shall forfeit or otherwise vacate the person's office or position of employment because of membership on the council. (B) The ex ... |
|
Section 3737.832 | Fire and safety standards relating to shale oil processing premises.
... fire safety standards relating to the construction at a shale oil processing premise of any structure subject to the nonresidential building codes established pursuant to section 3781.10 of the Revised Code. Notwithstanding any other provisions of the Revised Code, the state fire marshal shall have the sole and exclusive authority to adopt all other fire safety standards relating to a shale oil processing pre... |
|
Section 3737.833 | Temporary fire permit for retail establishments.
...ng a retail establishment that is under construction and not yet open to the public, is unable to conduct an inspection or issue a permit required by the state fire code adopted pursuant to sections 3737.82 and 3737.83 of the Revised Code, for more than five business days, the owner, operator, or developer of the retail establishment may seek a temporary permit from any fire code official authorized to conduct such a... |
|
Section 3743.25 | Safety requirements for fireworks showroom structures.
... (b) A fireworks showroom that, through construction of a new showroom, expansion of an existing showroom, or similar means, first exceeds five thousand square feet, to which the public has access for retail purposes, after February 7, 2022, shall be equipped with a sprinkler system that meets the criteria for sprinkler systems in extra hazard (group 2) occupancies under "NFPA 13, Standard for the Installation of Spr... |