Skip to main content
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
construction
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"construction","start":1401,"pageSize":25,"sort":"BestMatch","title":""}
Results 1,401 - 1,425 of 1,989
Sort Options
Sort Options
Sections
Section
Section 4906.101 | No power siting board certificate or amendment in restricted area.

...d shall not grant a certificate for the construction, operation, and maintenance of, or material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, to be constructed in a restricted area of the unincorporated area of a county, as designated by that county's board of county commissioners under sections 303.58 and 303.59 of the Revised Code, if the utility faci...

Section 4906.14 | Joint proceedings.

...ooperative efforts in certificating the construction, operation, and maintenance of major utility facilities in accord with the purposes of such sections and for the enforcement of the respective state laws regarding such facilities.

Section 4906.20 | Certificate required to construct certain wind farms.

...t limited to, their location, erection, construction, reconstruction, change, alteration, maintenance, removal, use, or enlargement and including erosion control, aesthetics, recreational land use, wildlife protection, interconnection with power lines and with regional transmission organizations, independent transmission system operators, or similar organizations, ice throw, sound and noise levels, blade shear, shado...

Section 4906.21 | Decommissioning plan for solar and wind generation required.

...sixty days prior to the commencement of construction of a utility facility, the applicant shall submit a comprehensive decommissioning plan for review and approval by the power siting board.

Section 4906.211 | Decommissioning plan requirements and estimated costs.

...hich the facility is located to its pre-construction state. The estimate shall not take into account the salvage value of any materials from the facility.

Section 4906.22 | Decommissioning performance bond required.

...(A) Prior to beginning construction, the applicant shall post a performance bond to ensure that funds are available for the decommissioning of the facility. (B) The power siting board shall be the obligee of the bond.

Section 4906.30 | No power siting board certificate or amendment for nonconformity.

...d shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, to be constructed in the unincorporated area of a county, if the facility has any of the following: (1) A nameplate capacity exceeding that which was provided to that county's board of county commissioners und...

Section 4907.15 | Map and profile of new railroad.

...Within a reasonable time after the construction of a railroad, or at any time when required by the public utilities commission, such railroad shall make and file with the commission a map and profile of such railroad, which shall be drawn on a scale, and certified and signed by the president or engineer of such railroad. A railroad company which violates this section is subject to the forfeiture provided in section ...

Section 4907.53 | Hearing as to necessity of safety device.

...prescribe the proportion of the cost of construction and of the expense of maintaining and operating such device which each company or person concerned shall pay. The order shall also fix the time within which such appliance shall be put in and the time within which such order shall be complied with.

Section 4909.059 | Construction of sections.

...Sections 4905.481, 4905.49, 4905.491, and 4909.051 to 4909.057 of the Revised Code shall be exclusively applied to voluntary and mutually agreeable acquisitions.

Section 4909.15 | Fixation of reasonable rate.

...enses of the utility in connection with construction work. (B) The commission shall compute the gross annual revenues to which the utility is entitled by adding the dollar amount of return under division (A)(3) of this section to the cost, for the test period used for the determination under division (C)(1) of this section, of rendering the public utility service under division (A)(4) of this section. (C)(1) Exce...

Section 4925.10 | Construction with other laws.

...(A) Chapters 4111., 4121., 4123., 4141., and sections 4113.15 and 4113.16 of the Revised Code do not apply to transportation network companies with regard to transportation network company drivers and transportation network company drivers are not employees for purposes of those chapters or sections, except where agreed to by written contract. If the parties agree to the application of one or more of these laws in...

Section 4927.11 | Access to basic local exchange service.

...ny's facilities or equipment during the construction or development phase of the multitenant real estate; (b) Accepts or agrees to accept incentives or rewards that are offered by a telecommunications service provider to the owner, operator, developer, or occupants of the multitenant real estate and are contingent on the provision of telecommunications service by that provider to the occupants, to the exclusion of s...

Section 4928.01 | Competitive retail electric service definitions.

...el cell; (f) Advanced solid waste or construction and demolition debris conversion technology, including, but not limited to, advanced stoker technology, and advanced fluidized bed gasification technology, that results in measurable greenhouse gas emissions reductions as calculated pursuant to the United States environmental protection agency's waste reduction model (WARM); (g) Demand-side management and any en...

Section 4928.62 | Energy efficiency revolving loan program.

...ulting engineers, architects, managers, construction experts, attorneys, technical monitors, energy evaluators, or other employees or agents as the director considers necessary, and fix their compensation; (5) Adopt rules prescribing the application procedures for financial assistance under the advanced energy program; the fees, charges, interest rates, payment schedules, local match requirements, and other terms a...

Section 4929.02 | Policy of state as to natural gas services and goods.

...alter the public utilities commission's construction or application of division (E) of section 4905.03 of the Revised Code.

Section 4929.111 | Implementation of capital expenditure program.

...to any allowance for funds used during construction. (G)(1) Any accrual for deferral or recovery under division (D) of this section shall be calculated in accordance with the system of accounts established by the commission under section 4905.13 of the Revised Code. (2) The natural gas company shall calculate the post-in-service carrying costs, described in division (D)(1) of this section, for every investmen...

Section 4931.02 | Acquisition or construction of other lines.

...(A) A telephone company may construct, own, use, and maintain telecommunications lines and facilities, whether described in its original articles of incorporation or not, and whether such lines or facilities are wholly within or partly beyond the limits of this state. It may join with another company or association in conducting, leasing, owning, using, or maintaining such lines or facilities, on terms agreed u...

Section 4933.151 | Appropriation of property by water works companies.

...s deemed necessary for the acquisition, construction, installation, operation, or maintenance of pumps, storage tanks, aqueducts, and water pipes, and for the protection thereof, and other structures and appliances necessary for the maintenance of pressure and the purification of water, and for rights of way over such land and adjacent for the purpose of access to any part of such land. The right of appropriation sha...

Section 4933.23 | Interfering with pipes and meters.

...asuring device or appliance used in the construction or operation of any plant furnishing or distributing hot water or steam for heating purposes. No person shall willfully or maliciously prevent any meter or other measuring device or appliance used in any such heating plant from duly registering the quantity of hot water or steam supplied. No person shall, without the consent of the owner of such heating plant, will...

Section 4933.81 | Certified territories for electric suppliers definitions.

... existence on January 1, 1977, or under construction on that date. (E) "Electric load center" means all the electric-consuming facilities of any type or character owned, occupied, controlled, or used by a person at a single location, which facilities have been, are, or will be connected to and served at a metered point of delivery and to which electric service has been, is, or will be rendered. (F) "Electric serv...

Section 4935.04 | Energy information and reports.

...nd routes and the approximate year when construction is expected to commence, and to make such information readily available to the public, to each newspaper of daily or weekly circulation within the area affected by the proposed site and route, and to interested federal, state, and local agencies; (3) Hold a public hearing upon the showing of good cause to the commission by an interested party. If a hearing is h...

Section 4937.03 | Powers and duties of utility radiological safety board.

...ty and national security aspects of the construction and operation of nuclear electric facilities, except for certain authority over air emissions. Sections 4937.01 to 4937.05 of the Revised Code do not affect the state's responsibilities for emergency preparedness and offsite safety requirements. (E) None of the powers or duties of the board under sections 4937.01 to 4937.05 of the Revised Code in any way supersede...

Section 4939.0311 | Consent not required.

...he public way, and do not authorize the construction and operation of a wireline backhaul facility.

Section 4939.0312 | [Former R.C 4939.0313, amended and renumbered by H.B. 478, 132nd General Assembly, effective 8/1/2018] Consolidated requests.

...ion and receive a single permit for the construction, modification, collocation, or replacement of the small cell facilities or wireless support structures. However, this single application may only address multiple small cell facilities or multiple wireless support structures if they each involve substantially the same type of small cell facilities or substantially the same type of wireless support structures. A mun...