Ohio Revised Code Search
| Section |
|---|
|
Section 1509.061 | Request to revise existing tract upon which exists producing or idle well.
...An owner of a well who has been issued a permit under section 1509.06 of the Revised Code may submit to the chief of the division of oil and gas resources management, on a form prescribed by the chief, a request to revise an existing tract upon which exists a producing or idle well. The chief shall adopt, and may amend and rescind, rules under section 1509.03 of the Revised Code that are necessary for the admin... |
|
Section 1509.062 | Temporary inactive well status.
...the well within a reasonable period of time; (6) A demonstration that the well poses no threat to the health or safety of persons, property, or the environment; (7) Any other relevant information that the chief prescribes by rule. The chief may waive any of the requirements established in divisions (B)(1) to (6) of this section if the division of oil and gas resources management possesses a current copy of th... |
|
Section 1509.07 | Liability insurance coverage.
...orn financial statement, may file a one-time fee of fifty dollars, which shall be deposited in the oil and gas well plugging fund created in section 1509.071 of the Revised Code. (C) An owner, operator, producer, or other person shall not operate a well or produce from a well at any time if the owner, operator, producer, or other person has not satisfied the requirements established in this section. |
|
Section 1509.071 | Forfeiting bond.
...ociated equipment and shall specify the price for doing the work. The contractor shall be insured. Expenditures made under division (E)(2)(a) of this section shall be consistent with the expenditures for activities described in division (E)(1) of this section. In addition, expenditures made under division (E)(2) of this section are not subject to section 127.16 of the Revised Code. The application constitutes an a... |
|
Section 1509.072 | Duty to restore disturbed land surface.
... resources management approves a longer time period, within three months after the date upon which the surface drilling of a well is commenced in an urbanized area and within six months after the date upon which the surface drilling of a well is commenced in all other areas, the owner or the owner's agent shall grade or terrace and plant, seed, or sod the area disturbed that is not required in production of the... |
|
Section 1509.073 | Fluid drilling requirements.
...sh fluid drilling conditions prior to penetration of the Onondaga limestone and continue to use fluid drilling until total depth of the well is achieved unless the chief of the division of oil and gas resources management authorizes such drilling without using fluid. |
|
Section 1509.074 | Analysis and disposition of material resulting from construction, operation, or plugging of a horizontal well.
...ion, the owner shall determine the concentration of radium-226 and of radium-228 in representative samples of the material if the material is technologically enhanced naturally occurring radioactive material. The owner shall provide for the collection and analysis of the representative samples of the material. The collection and analysis of the representative samples shall be performed in accordance with requi... |
|
Section 1509.08 | Determinations if well in coal bearing township.
...nal nonappealable order of a court of competent jurisdiction for damage to streets, roads, highways, bridges, culverts, or drainways pursuant to section 4513.34 or 5577.12 of the Revised Code until the applicant provides the chief with evidence of compliance with the order. No applicant shall attempt to circumvent this provision by applying for a permit under a different name or business organization name, by ... |
|
Section 1509.09 | Changing location of well after issuance of permit.
...ost hole under such circumstances that completion of the well is not feasible at the original location. If a permit holder requests a change of location, the permit holder shall return the original permit and file an amended map indicating the proposed new location. Drilling shall not be commenced at a new location until the original permit bearing a notation of approval by the chief or chiefs is posted at th... |
|
Section 1509.10 | Well log to be filed with division - contents - form.
...ore than six months, or such additional time as may be granted by the chief in writing, after the completion of the well substantially to the depth shown in the application required by section 1509.06 of the Revised Code. (2) If a well is not completed within sixty days after the completion of drilling operations, the owner shall file with the division of oil and gas resources management a supplemental well co... |
|
Section 1509.11 | Statement of production of oil, gas and brine.
...all not disclose information received from the department of taxation under section 5703.21 of the Revised Code until the statement of production required by division (A) of this section and related to that information is filed with the chief. |
|
Section 1509.12 | Defective wells and well plugging.
...rder a reasonable time within which to comply. No person shall fail or refuse to plug a well within the time specified in the order. Each day on which such a well remains unplugged thereafter constitutes a separate offense. Where the plugging method prescribed by rules adopted pursuant to section 1509.15 of the Revised Code cannot be applied or if applied would be ineffective in carrying out the protection that the... |
|
Section 1509.13 | Permit to plug and abandon well - application.
...s shall give written notice at the same time to the owner of the land upon which the well is located and to all lessors that receive gas from the well pursuant to an agreement. If the well penetrates or passes within one hundred feet of the excavations and workings of a mine, the owner of the well shall give written notice to the owner or lessee of that mine of the intention to abandon the well and of the time when t... |
|
Section 1509.14 | Report of abandonment of well.
...he owner or operator of the well at the time of abandonment and the post-office address of the owner or operator; (C) The location of the well as to township and county and the name of the owner of the surface upon which the well is drilled, with the address thereof; (D) The date of the permit to drill; (E) The date when drilled; (F) The depth of the well; (G) The depth of the top of the formation to which t... |
|
Section 1509.15 | Rules for methods of plugging.
...When any well is to be abandoned, it shall first be plugged in accordance with a method of plugging adopted by rule by the chief of the division of oil and gas resources management. The abandonment report shall show the manner in which the well was plugged. |
|
Section 1509.151 | Plugging at expense of operator.
...If a mine operator is about to encounter or encounters an orphaned well whose existence is detrimental to the mining operation, the mine operator may plug the well at the mine operator's own expense in accordance with this chapter and rules adopted under it. |
|
Section 1509.16 | Disclosure forms for oil country tubular goods.
...orm and consult with representatives from the natural gas, oil, and steel industries when developing the form. The division shall use the information specified on the form to establish a quality well infrastructure catalog. (C) The division shall determine the date on which the disclosure form shall be filed. |
|
Section 1509.17 | Encasing wells.
...an oil and gas resources inspector each time that the owner or the authorized representative notifies a person to perform the cementing of the conductor casing, the surface casing, or the production casing. In addition, not later than sixty days after the completion of the cementing of the production casing, an owner shall submit to the chief a copy of the cement tickets for each cemented string of casing and a... |
|
Section 1509.18 | Well drilled within limits of mining operation.
...no water is encountered between the bottom of the drive pipe and the approximate casing shoulder above the roof of the mine, in lieu of the casing method outlined above, it is permissible to use the following casing method: the hole shall be drilled thirty feet below the floor of the mine and a string of casing shall be extended from the surface to a point thirty feet below the floor of the mine with a packer o... |
|
Section 1509.181 | Suspension of drilling or reopening of well in coal bearing townships.
...under this section to the reclamation commission in accordance with section 1513.13 of the Revised Code. |
|
Section 1509.19 | Well stimulation.
...t later than twenty-four hours before commencing the stimulation of a well, the owner or the owner's authorized representative shall notify an oil and gas resources inspector. If during the stimulation of a well damage to the production casing or cement occurs and results in the circulation of fluids from the annulus of the surface production casing, the owner shall immediately terminate the stimulation of the ... |
|
Section 1509.20 | Prevention of waste - gas flaring.
...ized or shut in within ten days after completion. The owner of any well producing both oil and gas may burn such gas in flares when it is necessary to protect the health and safety of the public or when the gas is lawfully produced and there is no economic market at the well for the escaping gas. |
|
Section 1509.21 | Permits for secondary or additional recovery operations.
...vision of oil and gas resources management, conduct secondary or additional recovery operations, including any underground injection of fluids or carbon dioxide for the secondary or tertiary recovery of oil or natural gas or for the storage of hydrocarbons that are liquid at standard temperature or pressure, unless a rule of the chief expressly authorizes such operations without a permit. The permit shall be i... |
|
Section 1509.22 | Storage or disposal of brine, crude oil, natural gas, or other fluids.
...st of obtaining a water supply from the time of the contamination, diminution, or interruption by the operation until the owner has complied with an order of the chief for compliance with this division or such an order has been revoked or otherwise becomes not effective. If the owner elects to pay the difference in fair market values, but the owner and the holder have not agreed on the difference within thirty days a... |
|
Section 1509.221 | Requiring permit to drill well or inject substance into well for exploration for or extraction of minerals or energy.
...vision of oil and gas resources management, shall drill a well or inject a substance into a well for the exploration for or extraction of minerals or energy, other than oil or natural gas, including, but not limited to, the mining of sulfur by the Frasch process, the solution mining of minerals, the in situ combustion of fossil fuel, or the recovery of geothermal energy to produce electric power, unless a rule ... |