Section 4906.102 | No power siting board certificate or amendment where prohibited.
...(A) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, to be constructed in the unincorporated area of a county, if the board of county commissioners of the county in which a utility facility is to be located has adopted a resolution prohibi... |
Section 4906.103 | No power siting board certificate or amendment where limited.
...If a board of county commissioners has adopted a resolution which limits the boundaries of the proposed utility facility to a smaller geographic area of the county, completely within what was proposed by the applicant, as described in section 303.62 of the Revised Code, the power siting board shall not grant a certificate or material amendment that includes an area outside of the geographic area approved by the board... |
Section 4906.105 | [Repealed effective 8/14/2025 by H.B. 15, 136th General Assembly] Report to the general assembly.
... utility's larger transmission plan; (4) That the project has been considered in the context of the regional transmission planning process of PJM interconnection regional transmission organization, L.L.C.; (5) That the project could not have been deferred or redesigned to achieve the same operational result at a lower overall cost; (6) That the project has provided historical information for an existing transmi... |
Section 4906.11 | Opinion stating reason for decision.
...In rendering a decision on an application for a certificate, the power siting board shall issue an opinion stating its reasons for the action taken. |
Section 4906.12 | Procedures of public utilities commission to be followed.
...he same manner as if the board were the public utilities commission under such sections. |
Section 4906.13 | No local jurisdiction.
...nection to the electrical grid. (B) No public agency or political subdivision of this state may require any approval, consent, permit, certificate, or other condition for the construction or operation of a major utility facility or economically significant wind farm authorized by a certificate issued pursuant to Chapter 4906. of the Revised Code. Nothing herein shall prevent the application of state laws for the pro... |
Section 4906.14 | Joint proceedings.
...e discharge of its duties under Chapter 4906. of the Revised Code, may make joint investigations, hold joint hearings within or without the state, and issue joint or concurrent orders in conjunction or concurrence with any official or agency of any state or of the United States, whether in the holding of such investigations or hearings, or in the making of such orders, the board is functioning under agreements or com... |
Section 4906.20 | Certificate required to construct certain wind farms.
...hin one hundred twenty days after June 24, 2008. (1) The rules shall provide for an application process for certificating economically significant wind farms that is identical to the extent practicable to the process applicable to certificating major utility facilities under sections 4906.06, 4906.07, 4906.08, 4906.09, 4906.10, 4906.11, and 4906.12 of the Revised Code and shall prescribe a reasonable schedule of app... |
Section 4906.201 | Setback requirements.
...board under division (B)(2) of section 4906.20 of the Revised Code. (B)(1) For any existing certificates and amendments thereto, and existing certification applications that have been found by the chairperson to be in compliance with division (A) of section 4906.06 of the Revised Code before the effective date of the amendment of this section by H.B. 59 of the 130th general assembly, September 29, 2013, the ... |
Section 4906.21 | Decommissioning plan for solar and wind generation required.
...e purposes of this section and sections 4906.21 to 4906.232 of the Revised Code: (1) "Applicant" means an applicant for a certificate, or a material amendment to an existing certificate, from the power siting board to construct, operate, or maintain a utility facility, and includes any subsequent person to whom the certificate is transferred. (2) "Material amendment" and "utility facility" have the same meanings ... |
Section 4906.211 | Decommissioning plan requirements and estimated costs.
...to the power siting board under section 4906.21 of the Revised Code shall be prepared by a professional engineer registered with the state board of registration for professional engineers and surveyors. The board may reject the engineer chosen by the applicant and to require the applicant to choose another qualified engineer. (B) The plan shall contain the following: (1) A list of all parties responsible for deco... |
Section 4906.212 | Decommissioning estimated costs recalculation.
...described in division (B)(3) of section 4906.211 of the Revised Code, shall be recalculated every five years by an engineer retained by the applicant. |
Section 4906.22 | Decommissioning performance bond required.
...(A) Prior to beginning construction, the applicant shall post a performance bond to ensure that funds are available for the decommissioning of the facility. (B) The power siting board shall be the obligee of the bond. |
Section 4906.221 | Decommissioning performance bond amount.
...he performance bond required by section 4906.22 of the Revised Code shall be equal to the estimate of the costs of decommissioning included in the decommissioning plan described in section 4906.211 of the Revised Code. |
Section 4906.222 | Decommissioning performance bond update.
...cent estimates, as described in section 4906.212 of the Revised Code. (B) If the costs of decommissioning are greater in the most recent estimate than the costs of the immediately preceding estimate, the performance bond shall be increased proportionately. (C) If the costs of decommissioning are lower in the most recent estimate than the costs of the immediately preceding estimate, the performance bond shall not ... |
Section 4906.30 | No power siting board certificate or amendment for nonconformity.
...or purposes of this section and section 4906.31 of the Revised Code, "material amendment" and "utility facility" have the same meanings as in section 303.57 of the Revised Code. (B) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, to be ... |
Section 4906.31 | Power siting board application provided to township and county.
...compliance with division (A) of section 4906.06 of the Revised Code by the chairperson of the power siting board or the chairperson's designee, is accepted by the power siting board, and the filing fee is paid by the applicant, the board shall provide a full and complete copy of the application to each board of trustees and each board of county commissioners of the townships or counties in which the facility is to be... |
Section 4906.97 | Notice and hearing of complaint.
...son has violated a provision of section 4906.98 of the Revised Code, the board shall fix a time for hearing such complaint and shall notify the person. The notice shall be served not less than fifteen days before the date of hearing and shall state the matters that are the subject of the complaint. Parties to the complaint are entitled to be heard, to be represented by counsel, and to have process to enforce the atte... |
Section 4906.98 | Prohibited acts.
...required under division (B) of section 4906.97 of the Revised Code. |
Section 4906.99 | Penalty.
...fully violates any provision of section 4906.98 of the Revised Code may be fined not less than one thousand dollars nor more than ten thousand dollars for each day of violation, or imprisoned for not more than one year, or both. |
Section 4907.01 | Definitions.
...to 4907.63 of the Revised Code: (A) "Public utility" has the same meaning as in section 4905.02 of the Revised Code. (B) "Telephone company," "street railway company," and "interurban railroad company" have the same meanings as in section 4905.03 of the Revised Code. (C) "Railroad" has the same meaning as in section 4907.02 of the Revised Code. (D) "Public highway" has the same meaning as in section 4921.0... |
Section 4907.02 | Railroad defined.
...ted or not, operating such agencies for public use in the conveyance of persons or property within this state. All duties required of, and penalties imposed upon, a railroad or an officer or agent thereof insofar as they are applicable, are required and imposed upon express companies, water transportation companies, and interurban railroad companies, and upon their officers and agents. The public utilities co... |
Section 4907.03 | Regulation of service.
...Regulation of service applicable to railroads shall include: (A) The transportation of passengers and property between points within this state; (B) The receiving, switching, delivering, storing, and handling of such property; (C) All charges connected with divisions (A) and (B) of this section, including icing charges and mileage charges; (D) All railroad companies, sleeping car companies, equipment companies, e... |
Section 4907.04 | Exception.
...Chapters 4901., 4903., 4905., 4907., and 4909. of the Revised Code do not apply to street and electric railways engaged solely in the transportation of passengers within the limits of cities, or to other private railroads not doing business as common carriers. |
Section 4907.05 | Power to confer with commissioners of other states.
...The public utilities commission may confer on any matters relating to railroads by correspondence, by attending conventions, or otherwise, with the railroad commissioners of other states and with the interstate commerce commission. |