Ohio Revised Code Search
| Section |
|---|
|
Section 1514.30 | Interstate mining compact - interstate mining commission.
...rnor of the withdrawing state has given notice in writing of the withdrawal to the governors of all other party states. No withdrawal shall affect any liability already incurred by or chargeable to a party state prior to the time of such withdrawal. ARTICLE IX EFFECT ON OTHER LAWS Nothing in this compact shall be construed to limit, repeal, or supersede any other law of any party state. ARTICLE X CONSTRUCTION AN... |
|
Section 1514.45 | Annual safety performance evaluation.
..., as amended, at the same time that the notice is filed with the mine safety and health administration in the United States department of labor. |
|
Section 1514.50 | Right of entry to perform inspections or reclamation.
... chief shall provide reasonable advance notice to the owner of any land to be entered for the purpose of access for reclamation under this chapter. The division shall return the land that was used to access the former surface mining operation to the same or an improved grade, topography, and condition that existed prior to its use by the division. (C) When conducting investigations pursuant to section 1514.13 of the... |
|
Section 1517.24 | Prohibited acts.
..., or tamper with any posted sign giving notice against unauthorized access to or presence in a cave or citing any of the provisions of sections 1517.21 to 1517.26 or division (B) of section 1517.99 of the Revised Code; (4) Place refuse, garbage, dead animals, sewage, or toxic substances harmful to cave life or humans in a cave; (5) Burn within a cave any substance other than acetylene gas burned in a carbide lamp t... |
|
Section 1520.07 | Sale of timber or spoils of a dredging operation.
...rces within thirty days after receiving notice of the gift or sale that the spoils shall be disposed of in accordance with Chapter 3734. of the Revised Code, the director of natural resources may proceed with the gift or sale. (C) Proceeds from the sale of timber or dredge spoils under this section shall be deposited into the state treasury to the credit of the canal lands fund created in section 1520.05 of the Revi... |
|
Section 1521.06 | Construction permits for dams or levees required; exceptions.
...ired inspection reports shall be deemed notice that the engineer's inspections are not being performed. (G) The chief may order construction to cease on any dam or levee that is being built in violation of this section, and may prohibit the retention of water behind any dam or levee that has been built in violation of this section. (H) The chief may adopt rules in accordance with Chapter 119. of the Revised Code,... |
|
Section 1521.35 | Owners within geographic area; diminution or interruption water supply; complaint.
...d the presumption. Upon receipt of that notice, the permittee may cease providing a supply of water to the owner under division (C) of this section. (G) If, within fourteen days after receipt of the complaint, the permittee fails to submit to the chief information showing that the withdrawal is not the proximate cause of the diminution or interruption of the owner's water supply, such failure shall be considered a... |
|
Section 1522.12 | Program for issuance of withdrawal and consumptive use permits.
...y with the requirements regarding prior notice established in Section 4.6 of the compact. The chief shall issue or deny a permit through issuance of an order. The chief shall issue a permit if all applicable criteria for receiving the permit are met as provided in sections 1522.10 to 1522.30 of the Revised Code and neither of the following applies: (1) A withdrawal or consumptive use will result in a significant lo... |
|
Section 1522.24 | Owners within geographic area; dimunition or interruption of water supply; complaint.
...d the presumption. Upon receipt of that notice, the permittee may cease providing a supply of water to the owner under division (C) of this section. (G) If, within fourteen days after receipt of the complaint, the permittee fails to submit to the chief information showing that the withdrawal is not the proximate cause of the diminution or interruption of the owner's water supply, such failure shall be considered a ... |
|
Section 153.011 | Using domestic steel products in state supported projects.
...mination in writing. (E) The following notice shall be included in boldface type and capital letters in all bid notifications and specifications between all parties to any contract authorized under Chapter 153. of the Revised Code or subject to this section and section 153.99 of the Revised Code: "Domestic steel use requirements as specified in section 153.011 of the Revised Code apply to this project. Copies ... |
|
Section 153.02 | Debarment of contractor from contract awards.
...ve director shall send the contractor a notice of proposed debarment indicating the grounds for the proposed debarment and the procedure for requesting a hearing on the proposed debarment. The hearing shall be conducted in accordance with Chapter 119. of the Revised Code. If the contractor does not respond with a request for a hearing in the manner specified in Chapter 119. of the Revised Code, the executive director... |
|
Section 153.06 | Form of bids.
... of the Revised Code shall give public notice of the time and place when and where bids will be received for performing the labor and furnishing the materials of such construction, improvement, alteration, addition, or installation, and a contract awarded, except for materials manufactured by the state or labor supplied by a county department of job and family services that may enter into the same. The form of... |
|
Section 153.08 | Opening bids and awarding contract.
...n the day and at the place named in the notice provided for in section 153.06 of the Revised Code, the owner referred to in section 153.01 of the Revised Code shall open the bids and shall publicly, with the assistance of the architect or engineer, immediately proceed to tabulate the bids. For a bid filed electronically, the public bid opening may be broadcast by electronic means pursuant to rules established by the ... |
|
Section 153.17 | Requisition upon contractor for additional specific force or materials.
...t requires. Not less than five days' notice in writing of such action shall be served upon the contractor or the contractor's agent in charge of the work. If the contractor fails to comply with such requisition within fifteen days, such owner with the written consent of the Ohio facilities construction commission, may employ upon the work the additional force, or supply the special materials or such part of either... |
|
Section 153.571 | Form of bond.
...d advertising, and printing and mailing notices to prospective bidders, whichever is less, then this obligation shall be null and void, otherwise to remain in full force and effect; if the obligee accepts the bid of the principal and the principal within ten days after the awarding of the contract enters into a proper contract in accordance with the bid, plans, details, specifications, and bills of material, which sa... |