Ohio Revised Code Search
| Section |
|---|
|
Section 4909.059 | Construction of sections.
...Sections 4905.481, 4905.49, 4905.491, and 4909.051 to 4909.057 of the Revised Code shall be exclusively applied to voluntary and mutually agreeable acquisitions. |
|
Section 4909.06 | Additional facts.
...f the Revised Code shall show, when the public utilities commission deems it necessary, the amounts, dates, and rates of interest of all bonds outstanding against each public utility or railroad, the property upon which such bonds are a lien, the amounts paid for them, and, the original capital stock and the moneys received by any such public utility or railroad by reason of any issue of stock, bonds, or other securi... |
|
Section 4909.07 | Revision and correction of valuations.
...The public utilities commission, during the making of the valuation provided for in sections 4909.04 to 4909.13 of the Revised Code, and after its completion, shall in like manner keep itself informed through its engineers, experts, and other assistants of all extensions, improvements, or other changes in the condition and value of the property of all public utilities or railroads and shall ascertain the value of suc... |
|
Section 4909.08 | Notice and hearing before valuation becomes final.
...When the public utilities commission has completed the valuation of the property of any public utility or railroad and before such valuation becomes final, it shall give notice by registered letter to such public utility or railroad, and if a substantial portion of said public utility or railroad is situated in a municipal corporation, then to the mayor of such municipal corporation, stating the valuations placed upo... |
|
Section 4909.09 | Ascertainment of valuation.
...d or the obligation is imposed upon the public utilities commission to ascertain the value of any public utility or railroad, such valuation shall be made in accordance with sections 4901.01 to 4901.14, 4901.17 to 4901.24, 4903.10, 4903.12 to 4903.19, and 4909.04 to 4909.15 of the Revised Code. |
|
Section 4909.10 | Hearing to ascertain value of property - notice.
...aining the value of the property of any public utility or railroad in this state, including municipally owned or operated public utilities, the public utilities commission may cause a hearing to be held at such time and place as the commission designates. Before any hearing is had, the commission shall give the public utility or railroad affected thereby, and if a substantial portion of said public utility or railroa... |
|
Section 4909.11 | Filing and review of findings.
...The public utilities commission shall make and file its findings of fact in writing upon all matters, concerning which evidence has been introduced before it, which in its judgment have bearing on the value of the property of the public utility or railroad affected. Such findings shall be subject to review by the supreme court in the same manner and within the same time as other orders and decisions of the commission... |
|
Section 4909.12 | Admissibility of findings in evidence.
...The findings of the public utilities commission made and filed under section 4909.11 of the Revised Code, when properly certified under the seal of the commission, are admissible in evidence in any action, proceeding, or hearing before the commission or any court, in which the commission, the state or any officer, department, or institution thereof, or any county, municipal corporation, or other body politic, and the... |
|
Section 4909.13 | Additional hearings.
...The public utilities commission may cause further hearings and investigations to be had for the purpose of making revaluations or ascertaining the value of any betterments, improvements, additions, or extensions made by any public utility or railroad subsequent to any prior hearing or investigation, and may examine into all matters which may change, modify, or affect any finding of fact previously made, and may at su... |
|
Section 4909.14 | Wrongful valuation.
...No member of the public utilities commission shall willfully overvalue the property of a public utility for the purpose of enabling such public utility to exact a higher rate for service than could lawfully be exacted, or willfully undervalue such property for the purpose of preventing such public utility from charging a lawful rate for such service. |
|
Section 4909.15 | Fixation of reasonable rate.
...(A) The public utilities commission, when fixing and determining just and reasonable rates, fares, tolls, rentals, and charges, shall determine: (1)(a) With respect to a public utility that is a natural gas, water-works, or sewage disposal system company, or that is an electric light company that chooses not to file a forecasted test period under section 4909.18 of the Revised Code, the valuation as of the date ce... |
|
Section 4909.151 | Consideration of costs attributable to service.
...observed and charged for service by any public utility, the public utilities commission may consider the costs attributable to such service. The utility shall file with the commission an allocation of the cost, except cost related to sparsity of population, for services for which a change in rates is proposed when evidence relating thereto is presented which indicates that the rate or rates do not generally reflect t... |
|
Section 4909.152 | Consideration of efficiency, sufficiency, adequacy of facilities.
...observed and charged for service by any public utility, the public utilities commission may consider the efficiency, sufficiency, and adequacy of the facilities provided and the services rendered by the public utility, the value of such service to the public, and the ability of the public utility to improve such service and facility. If the commission determines that the facility or service is inefficient, insuffici... |
|
Section 4909.153 | Hearing service complaints.
...observed and charged for service by any public utility, the public utilities commission may hear service complaints, if any, that may be presented by customers and the public during any proceeding involving such rates, joint rates, tolls, classifications, charges, or rentals. No complaint shall be considered by the commission unless the public utility has been given notice of the complaint to be considered at the hea... |
|
Section 4909.154 | Consideration of management policies, practices, and organization of public utility.
...observed and charged for service by any public utility, the public utilities commission shall consider the management policies, practices, and organization of the public utility. The commission shall require such public utility to supply information regarding its management policies, practices, and organization. If the commission finds after a hearing that the management policies, practices, or organization of the p... |
|
Section 4909.155 | Filing report on bonds, stock and money.
...observed and charged for service by any public utility, the public utilities commission may require the utility to file a report showing: (A) The amounts, date of issuance, due date, terms, and rates of interest of all bonds and debentures outstanding against such utility; (B) The face value of any outstanding preferred stock and the stated value of all outstanding common stock issued by such utility; (C) The tota... |
|
Section 4909.156 | Filing report showing property valuation.
...observed and charged for service by any public utility, the public utilities commission shall, in action upon an application filed pursuant to section 4909.18 of the Revised Code, require a public utility to file a report showing the proportionate amounts of the valuation of the property of the utility, as determined under section 4909.042 or 4909.05 of the Revised Code, and the proportionate amounts of the revenues ... |
|
Section 4909.159 | Financial information for forecasted test period from full books.
...tion from the company's full books. The public utilities commission shall ensure appropriate protections against the disclosure of the company's trade secrets or proprietary information. |
|
Section 4909.16 | Power to amend, alter, or suspend schedule of rates.
...When the public utilities commission deems it necessary to prevent injury to the business or interests of the public or of any public utility of this state in case of any emergency to be judged by the commission, it may temporarily alter, amend, or, with the consent of the public utility concerned, suspend any existing rates, schedules, or order relating to or affecting any public utility or part of any public utilit... |
|
Section 4909.161 | Recovering increased excise tax levy and kilowatt-hour tax.
...ed to be a normal expense incurred by a public utility in the course of rendering service to the public, and may be recovered as such in accordance with an order of the public utilities commission. Any public utility required to pay any such increased excise tax levy may file with the public utilities commission revised rate schedules that will permit full recovery on an interim or permanent basis in its rates, of th... |
|
Section 4909.17 | Approval required for change in rate.
...classification, charge, or rental of a public utility shall become effective until the public utilities commission, by order, determines it to be just and reasonable, except as provided in this section and sections 4909.18, 4909.19, and 4909.191 of the Revised Code. Such sections do not apply to any rate, joint rate, toll, classification, charge, or rental, or any regulation or practice affecting the same, of ... |
|
Section 4909.171 | Basing waterworks rate charge on change in water cost imposed by local government.
...ompany may submit an application to the public utilities commission for an increase or decrease in any rate or charge for, respectively, water or sewage treatment, if both of the following conditions are met: (1) The water or sewage treatment is provided to the company by either of the following: (a) A municipal corporation or other local governmental unit of this state whose rates are not subject to regulation b... |
|
Section 4909.172 | Application for approval to collect infrastructure improvement surcharge.
...wage disposal system company, that is a public utility may file an application with the public utilities commission for approval to collect an infrastructure improvement surcharge, determined in accordance with this section, from customers located in the company's affected service areas and subject to affected schedules filed by the company under section 4905.32 of the Revised Code. The application shall be in such f... |
|
Section 4909.173 | Water-works company replacement of water service line.
...n 4905.03 of the Revised Code that is a public utility under section 4905.02 of the Revised Code. (B) A water-works company may do any of the following: (1) Replace lead customer-owned water service lines concurrently with a scheduled utility main replacement project, an emergency replacement, or company-initiated lead water service line replacement program; (2) Replace lead customer-owned water service lines... |
|
Section 4909.174 | Water-works company reimburse customer for replacement of water service line.
...(A) A water-works company shall reimburse a customer who replaces the customer's customer-owned water service line, if both of the following occur: (1) The company confirms that the customer-owned water service line was composed of lead or other composition that was mandated or ordered to be replaced by law or a state or federal regulatory agency; (2) The customer submits the reimbursement request to the company ... |
|
Section 4905.911 | Compliance with federal design requirements.
...sion (A)(2) of this section: (a) The public utilities commission shall require an operator of either of the following types of pipelines that was completely constructed on or after September 10, 2012, and that transports gas produced by a horizontal well to comply with the applicable pipe design requirements of 49 C.F.R. 192 subpart C: (i) A gas gathering pipeline; (ii) A processing plant gas stub pipeline. ... |
|
Section 4905.92 | Assessments against operators - pipe-line safety fund.
...ection 4905.10 of the Revised Code, the public utilities commission shall assess against all operators an amount equal to the appropriation in each fiscal year from the pipe-line safety fund. The assessment against each operator shall be based on the total Mcfs of gas it supplied or delivered in this state during the calendar year next preceding the assessment. The commission shall not assess against any operator an ... |
|
Section 4905.93 | Duties of operator.
...Each operator shall do all of the following: (A) Comply with sections 4905.90 to 4905.96 of the Revised Code and the pipe-line safety code. For the purpose of that compliance, the act or omission of any officer, employee, or agent of an operator, while acting within the scope of his duties or employment, is deemed the act or omission of the operator. (B) Establish and maintain any record, make any report, and provi... |
|
Section 4905.94 | Operator of master-meter system.
...to perform a safety inspection when the public interest so requires, when an operator of a master-meter system has violated or failed to comply with division (B) of this section or has failed to conduct any safety inspection required by sections 4905.90 to 4905.96 of the Revised Code and the pipe-line safety code, or upon request of the operator of the master-meter system. When the commission directs or orders a safe... |
|
Section 4905.95 | Notices, hearings and orders of commission.
...ivision (C) of this section: (1) The public utilities commission, regarding any proceeding under this section, shall provide reasonable notice and the opportunity for a hearing in accordance with rules adopted under section 4901.13 of the Revised Code. (2) Sections 4903.02 to 4903.082, 4903.09 to 4903.16, and 4903.20 to 4903.23 of the Revised Code apply to all proceedings and orders of the commission under t... |
|
Section 4905.96 | Civil action against operator.
... the written request of or order by the public utilities commission, the attorney general shall bring a civil action against an operator in the name of the state to enforce orders of the commission issued under section 4905.95 of the Revised Code, including orders assessing forfeitures under division (B)(1) of that section, and for other appropriate relief, including a temporary restraining order or a preliminary or ... |
|
Section 4905.99 | Penalty.
...(A) Whoever violates section 4905.52 of the Revised Code shall be fined not less than fifty nor more than five hundred dollars. (B) Whoever violates section 4905.56 of the Revised Code is guilty of a felony of the fifth degree. (C) Whoever violates section 4905.74 of the Revised Code is guilty of a misdemeanor of the third degree. |
|
Section 4906.01 | Power siting definitions.
...cate of environmental compatibility and public need issued by the power siting board under section 4906.10 of the Revised Code or a construction certificate issued by the board under rules adopted under divisions (E) to (H) of section 4906.03 of the Revised Code. (E) "Gas" means natural gas, flammable gas, or gas that is toxic or corrosive. (F) "Natural gas liquids finished product pipeline" means a pipeline that... |
|
Section 4906.02 | Power siting board organization.
...)(1) There is hereby created within the public utilities commission the power siting board, composed of the chairperson of the public utilities commission, the director of environmental protection, the director of health, the director of development, the director of natural resources, the director of agriculture, and a representative of the public who shall be an engineer and shall be appointed by the governor, from ... |
|
Section 4906.021 | Ad hoc member requirement, qualifications.
...(A) For the purposes of this section and section 4906.022 of the Revised Code: (1) "Immediate family member" means a person's: (a) Spouse; (b) Brother or sister of the whole, or of the half, blood, or by marriage; (c) Children, including adopted children; and (d) Parents. (2) "Material amendment" and "utility facility" have the same meanings as in section 303.57 of the Revised Code. (B) Whenever an app... |
|
Section 4906.022 | Ad hoc member designation.
...(A) Voting ad hoc members of the power siting board under section 4906.021 of the Revised Code shall be designated not later than thirty days after a board of county commissioners or a board of township trustees receives notification that an application, for which an ad hoc member shall be included, has been found to be in compliance with division (A) of section 4906.06 of the Revised Code by the chairperson of the p... |
|
Section 4906.023 | Limitation on ad hoc member of intervening township or county.
...If a board of township trustees or board of county commissioners seeks to adopt a resolution to intervene in a power siting board case for which it is entitled to have a voting ad hoc member under section 4906.02 of the Revised Code, the member shall not vote on the resolution to intervene, unless the member designates another individual to serve as the ad hoc member. A designee under this section shall meet the re... |
|
Section 4906.024 | Ex parte communication exemption and requirements for ad hoc members.
...(A) A voting ad hoc member of the power siting board under section 4906.02 of the Revised Code shall be exempt from any limitations on ex parte communications. (B) If such an ad hoc member communicates with a party, including any party who is an intervenor, to a board proceeding, the ad hoc member and the party shall disclose the following to the board: (1) The date of the conversation; (2) All participants in ... |
|
Section 4906.025 | Ad hoc member confidentiality requirements.
...No present or former voting ad hoc member of the power siting board shall disclose or use, without appropriate authorization, information acquired in the course of official duties that is confidential because of either of the following: (A) Statutory law; (B) Notice the ad hoc member received designating the information as confidential and both of the following apply: (1) The status of the proceedings, or the ... |
|
Section 4906.03 | Powers and duties of power siting board.
...all application requirements set by the public utilities commission by rule. If the chairperson does not issue a determination within the time period required by this division, the application shall be deemed in compliance by operation of law. The board shall render a decision on an application submitted under this division not later than forty-five days after the application is determined in compliance with all re... |
|
Section 4906.04 | Certificate required for construction of major utility facility.
...No person shall commence to construct a major utility facility in this state without first having obtained a certificate for the facility. The replacement of an existing facility with a like facility, as determined by the power siting board, shall not constitute construction of a major utility facility. Such replacement of a like facility is not exempt from any other requirements of state or local laws or regulations... |
|
Section 4906.05 | Certificate exemptions.
...No certificate is required for a major utility facility on which construction had already commenced on October 23, 1972, or within two years thereafter. This section does not exempt such a facility from any other requirements of state and local laws and regulations. No certificate is required for any major utility facility already in operation on October 23, 1972, and the facility shall not be exempt from any... |
|
Section 4906.06 | Certificate application.
... if ordered, and shall be available for public inspection. (7) For an electric transmission line, a summary of any studies that have been made by or for the applicant of cost-effective advanced transmission technologies that maximize the value, expand the capacity, or improve the reliability of the facility. The application shall be filed not more than five years prior to the planned date of commencement of const... |
|
Section 4906.07 | Public hearing on application.
...g board shall promptly fix a date for a public hearing thereon, not less than forty-five nor more than sixty days after such receipt, and shall conclude the proceeding as expeditiously as practicable. (B) On an application for an amendment of a certificate, the board shall hold a hearing in the same manner as a hearing is held on an application for a certificate if the proposed change in the facility would result ... |
|
Section 4906.08 | Parties - testimony.
...ty within thirty days after the date of publication of the notice required by division (C) of section 4906.06 of the Revised Code, and if that petition has been granted by the board for good cause shown. (B) The board, in extraordinary circumstances for good cause shown, may grant a petition, for leave to intervene as a party to participate in subsequent phases of the proceeding, that is filed by a person identified... |
|
Section 4906.09 | Record of hearing.
...A record shall be made of the hearing and of all testimony taken. Rules of evidence, as specified by the power siting board, shall apply to the proceeding. The board may provide for the consolidation of the representation of parties having similar interests. |
|
Section 4906.10 | Basis for decision granting or denying certificate.
... (6) That the facility will serve the public interest, convenience, and necessity; (7) In addition to the provisions contained in divisions (A)(1) to (6) of this section and rules adopted under those divisions, what its impact will be on the viability as agricultural land of any land in an existing agricultural district established under Chapter 929. of the Revised Code that is located within the site and alterna... |
|
Section 4906.101 | No power siting board certificate or amendment in restricted area.
...(A) For purposes of this section and sections 4906.102 and 4906.103 of the Revised Code, "material amendment" and "utility facility" have the same meanings as in section 303.57 of the Revised Code. (B) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or material amendment to an existing certificate for, a utility facility, either as proposed or as modified by... |
|
Section 4906.102 | No power siting board certificate or amendment where prohibited.
...(A) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, to be constructed in the unincorporated area of a county, if the board of county commissioners of the county in which a utility facility is to be located has adopted a resolution prohibi... |
|
Section 4906.103 | No power siting board certificate or amendment where limited.
...If a board of county commissioners has adopted a resolution which limits the boundaries of the proposed utility facility to a smaller geographic area of the county, completely within what was proposed by the applicant, as described in section 303.62 of the Revised Code, the power siting board shall not grant a certificate or material amendment that includes an area outside of the geographic area approved by the board... |