Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
solar
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"solar","start":26,"pageSize":25,"sort":"BestMatch","title":""}
Results 26 - 50 of 113
Sort Options
Sort Options
Sections
Section
Section 5709.53 | Exemption of solar, wind or hydrothermal energy system and of certain energy facilities.

...(A) A solar, wind, or hydrothermal energy system on which construction or installation is completed during the period from August 14, 1979, through December 31, 1985, that meets the guidelines established under division (B) of section 1551.20 of the Revised Code is exempt from real property taxation. (B) Any fixture or other real property included in an energy facility with an aggregate nameplate capacity of two hu...

Section 5727.01 | Public utilities definitions.

...turbine tower, connected to and behind solar radiation collector areas and designed to convert the radiant energy of the sun into electricity or heat, or connected to any other property used to generate electricity from an energy resource, through which electricity is transferred to controls, transformers, or power electronics and to the transmission interconnection point. "Energy conversion equipment" include...

Section 717.25 | Low-cost alternative energy revolving loan program.

...ernative energy technologies limited to solar photovoltaic projects, solar thermal energy projects, geothermal energy projects, and customer-generated energy projects; (2) Energy efficiency technologies, products, and activities that reduce or support the reduction of energy consumption, allow for the reduction in demand, or support the production of clean, renewable energy. (C) If the legislative authority de...

Section 1551.11 | Director of development - powers and duties.

...mental demonstrations or development of solar heating and cooling and potentially energy-efficient construction in public buildings, schools, offices, commercial establishments, and residential homes; development of programs or experimental demonstrations of the utilization of waste products in energy production and mineral and energy conservation; and development of programs or experimental demonstrations of technol...

Section 156.01 | Energy conservation measure and energy saving measure definitions.

...tems that harvest renewable energy from solar, wind, water, biomass, bio-gas, or geothermal sources, for use primarily within a building or complex of buildings; (11) Retro-commissioning or recommissioning energy-related systems to verify that they are installed and calibrated to optimize energy and operational performance within a building or complex of buildings; (12) Consolidation, virtualization, and optimizati...

Section 166.01 | Economic development program definitions.

...cilities" includes, without limitation, solar, geothermal, biofuel, biomass, wind, hydro, wave, and other advanced energy projects as defined in section 3706.25 of the Revised Code. (Q) "Research and development financial assistance" means inducements under section 166.17 of the Revised Code, research and development loans under section 166.21 of the Revised Code, and research and development tax credits under sect...

Section 303.58 | Restricted area resolution by county commissioners.

... (2) A large wind farm; (3) A large solar facility. (B) A resolution described in division (A) of this section may designate one or more restricted areas and shall fix restricted area boundaries within the unincorporated area of the county. (C)(1) The board may adopt a resolution designating a restricted area at a regular meeting of the board or at a special meeting called for the purpose of discussing such a...

Section 303.61 | Public meeting before power siting board application for certificate or amendment.

...nificant wind farm; or (iii) A large solar facility. (b) The maximum nameplate capacity of the utility facility; (c) A map of the proposed geographic boundaries of the project within that county. (2) The person intending to apply for a material amendment that makes any change or modification to an existing certificate shall comply with the requirements of this section when providing information regarding ...

Section 3313.378

...nsist of the funds transferred from the solar generation fund, repayments of loans from this fund, interest on amounts in the school energy performance contracting loan fund, and any appropriations, grants, or gifts made to the fund. (B) The fund shall be administered by the Ohio facilities construction commission, and the commission shall request the treasurer of state to create the account for the fund. The trea...

Section 3706.43 | [Repealed effective 8/14/2025 by H.B. 15, 136th General Assembly] Review and approval.

...ce meets the definition of a qualifying solar resource in section 3706.40 of the Revised Code.

Section 3706.46 | [Repealed effective 8/14/2025 by H.B. 15, 136th General Assembly] Revenue requirements.

...on 3706.55 of the Revised Code from the solar generation fund. (2) The public utilities commission shall determine the method by which the revenue is allocated or assigned to each electric distribution utility for billing and collection, provided that the method of allocation shall be based on the relative number of customers, relative quantity of kilowatt hour sales, or a combination of the two. The level and stru...

Section 4906.21 | Decommissioning plan for solar and wind generation required.

...(A) For the purposes of this section and sections 4906.21 to 4906.232 of the Revised Code: (1) "Applicant" means an applicant for a certificate, or a material amendment to an existing certificate, from the power siting board to construct, operate, or maintain a utility facility, and includes any subsequent person to whom the certificate is transferred. (2) "Material amendment" and "utility facility" have the same...

Section 4928.642 | [Repealed effective 8/14/2025 by H.B. 15, 136th General Assembly] Reduction from compliance amount.

...urs produced, if any, by all qualifying solar resources, as defined in section 3706.40 of the Revised Code, during the preceding compliance year, allocating that total among all electric distribution utilities and electric services companies in proportion to their baselines for the subject compliance year, and subtracting that allocated amount from the utility's or company's compliance amount as otherwise determined ...

Section 4933.32 | Application of schedules and orders for curtailment of residential service.

... residence of such consumers utilizes a solar, wind, or hydrothermal energy system, as defined in section 1551.20 of the Revised Code.

Section 5501.70 | Definitions for ORC sections 5501.70 to 5501.83.

...enewable energy sources such as wind or solar, or any other similar commodity, including a fire or police signal system or street lighting system that directly or indirectly serves the public.

Section 303.01 | County rural zoning - agriculture defined.

...As used in sections 303.02 to 303.25 of the Revised Code, "agriculture" includes farming; ranching; algaculture meaning the farming of algae; aquaculture; apiculture; horticulture; viticulture; animal husbandry, including, but not limited to, the care and raising of livestock, equine, and fur-bearing animals; poultry husbandry and the production of poultry and poultry products; dairy production; the production ...

Section 303.02 | County commissioners may regulate building and land use in unincorporated territory.

...(A) Except as otherwise provided in this section, in the interest of the public health and safety, the board of county commissioners may regulate by resolution, in accordance with a comprehensive plan, the location, height, bulk, number of stories, and size of buildings and other structures, including tents, cabins, and trailer coaches, percentages of lot areas that may be occupied, set back building lines, sizes of ...

Section 303.021 | Designating street names and assigning numbers to buildings.

...The board of county commissioners may designate street names and assign numbers to buildings along streets in unincorporated areas. The owners of such buildings shall number or renumber such buildings in accordance with the numbers assigned by the county commissioners.

Section 303.022 | Establishing or modifying planned-unit developments.

...A county zoning resolution or amendment adopted in accordance with this chapter may establish or modify planned-unit developments. Planned-unit development regulations shall apply to property only at the election of the property owner and shall include standards to be used by the board of county commissioners or, if the board so chooses, by the county zoning commission, in determining whether to approve or disapprov...

Section 303.023 | Prior planned-unit developments continue to be governed by regulations in effect at time of approval or modification.

...Any planned-unit development regulations adopted in accordance with section 303.12 of the Revised Code, or any planned-unit developments constructed or approved in a preliminary or final form, under the provisions of a zoning resolution adopted prior to the effective date of this section, if otherwise lawful had they originated on that date, shall be deemed to have been lawful from their origin and the developments s...

Section 303.03 | Adoption of resolution of intention to proceed with county rural zoning.

...Before availing itself of the powers conferred in section 303.02 of the Revised Code, the board of county commissioners shall pass a resolution declaring its intention to proceed under sections 303.01 to 303.25 of the Revised Code. The board may act in the following manner: (A) It may adopt such a resolution upon its own initiative. (B) It shall adopt such a resolution if there is presented to it a petition, signed...

Section 303.04 | County rural zoning commission.

...The board of county commissioners of any county proceeding under sections 303.01 to 303.25 of the Revised Code, shall create and establish a county rural zoning commission. The commission shall be composed of five members who reside in the unincorporated area of the county to be zoned, to be appointed by the board. The board of county commissioners may appoint two alternate members to the county rural zoning commissi...

Section 303.05 | Recommendations of county rural zoning commission - powers and duties of commission.

...The county rural zoning commission shall submit a plan, including both text and maps, representing the recommendations of the zoning commission for the carrying out by the board of county commissioners of the powers, purposes, and provisions set forth in sections 303.01 to 303.99, inclusive, of the Revised Code, including additions to territory in which a county zoning plan is in effect. The zoning commission may, w...

Section 303.06 | Public hearing on recommendations - notice.

...Before certifying its recommendations of a zoning plan to the board of county commissioners, the county rural zoning commission shall hold at least one public hearing in each township affected by the proposed zoning plan, notice of which shall be given by one publication at least thirty days before the date of such hearing using at least one of the following methods: (A) In the print or digital edition of a newspap...

Section 303.07 | Submission of proposed zoning resolution to county or regional planning commission.

...Following the hearing provided for in section 303.06 of the Revised Code, the county rural zoning commission shall submit the proposed zoning resolution, including text and maps, to the county or regional planning commission of the county or district in which the county is located, if there is such a commission, for approval, disapproval, or suggestions. The approval of the planning commission shall be conclusively ...