Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Section 5525.10 | Contracts not to be awarded for more than cost plus five per cent.

 

Except as provided in section 5525.15 of the Revised Code, no contract for any road improvement shall be awarded for a greater sum than the estimated cost thereof plus five per cent. The bids received for an improvement shall be opened at the time and place stated in the notice and the bids shall conform to such other requirements as the director of transportation prescribes. If no acceptable bid is made the director may readvertise the work at the original estimate or amend the estimate and again proceed to advertise for bids. The director may contract for the construction or improvement of bridges and culverts or the grading required in connection with an improvement and may defer making contracts for the remainder of said improvement until such grade has become stable and solid.

Available Versions of this Section