Sections
Section
Section 153.311 | Construction of public building in stages.

...ounty commissioners from constructing a public building in stages and letting contracts from time to time for various portions of the work, so long as the total cost of construction of a project, which may include more than one building, is reasonably estimated by the board to exceed fifteen million dollars.

Section 153.32 | Contracts for erection and repair of superstructures.

...When it becomes necessary to erect a bridge, the board of county commissioners shall determine the length and width of the superstructure, and whether it shall be single or double track, and it shall advertise for bids for performing the labor and furnishing the materials necessary to the erection thereof in accordance with sections 307.86 to 307.92 of the Revised Code.

Section 153.33 | Bids on other plans may be considered.

...The board of county commissioners may also invite, receive, and consider bids on any other plan at the option of bidders, and shall require that any such plan together with specifications shall be filed in the office of the county auditor for a period of fifteen days prior to the date for receiving bids. Such plans and specifications shall show the number of spans, the length of each, the nature, quality, and size of...

Section 153.34 | Contents of advertisement.

...In its advertisement, the board of county commissioners shall invite bidders to make bids for furnishing all the materials and performing all the work, or for such parts thereof as bidders deem proper, and include such other matter as is required in section 307.87 of the Revised Code.

Section 153.35 | Plans shall be kept on file in county auditor's office.

...The plans and specifications upon which the contracts are awarded, shall be kept on file in the office of the board of county commissioners and made a part of the contract with the successful bidder. When it is necessary to alter, repair, or make an addition to a bridge, the board of county commissioners in making contracts therefor, shall conform to sections 153.01 to 153.60, inclusive, of the Revised Code, in relat...

Section 153.36 | Approval of plans for courthouse or jail.

...(A) If the plans, drawings, representations, bills of material, and specifications of work, and estimates of the cost thereof in detail and in the aggregate, required in sections 153.31 to 153.35, inclusive, of the Revised Code, relate to the building of a courthouse or jail, or an addition to or alteration, repair, or improvement thereof, they shall be submitted to the board of county commissioners. If the estimated...

Section 153.37 | Approval of plans for county home.

...If the plans, drawings, representations, bills of material, and specifications of work and estimates of the cost thereof relate to the building, addition to, or alteration of a county home, they shall be submitted to the board of county commissioners. If approved by a majority of the board, a copy thereof shall be deposited in the office of the board of county commissioners and kept for the inspection and use of part...

Section 153.38 | Approval of plans for bridge.

...If the plans, drawings, representations, bills of material, specifications of work, and estimates relate to the building of a bridge, they shall be submitted to the board of county commissioners and the county engineer. If approved by a majority of them, a copy thereof shall be deposited in the office of county engineer and kept for the inspection of parties interested.

Section 153.39 | Approval of plans for children's home.

... erecting, repairing, or altering other public buildings.

Section 153.44 | Contracts submitted to prosecuting attorney.

...county commissioners to the prosecuting attorney of the county. If found to be in accordance with sections 153.01 to 153.60, inclusive, of the Revised Code, and a certificate to that effect is indorsed thereon by the prosecuting attorney, such contracts shall have full effect, otherwise the contract shall be void.

Section 153.45 | Commissioners may annul old and make new contracts.

...If a contractor fails or refuses to proceed with the work specified in his contract in accordance with the plans, descriptions, and specifications attached to and made part thereof, the board of county commissioners may annul such contract, and shall proceed to make another contract for the completion thereof, in accordance with sections 153.01 to 153.60, inclusive, of the Revised Code.

Section 153.49 | Duty of county treasurer.

...The county treasurer shall pay the warrants drawn for materials and labor furnished on county contracts pursuant to estimates prepared under section 153.14 of the Revised Code, place them on file, and keep a register of the names of the persons to whom they are paid.

Section 153.50 | Separate bids for work and materials.

...ns constructing and managing an entire public improvement project, including the branches or classes of work specified in division (B) of this section, under the award of a single aggregate lump sum contract. (6) "General contracting firm" means a person capable of performing general contracting. (B) Except for contracts made with a construction manager at risk, with a design-build firm, or with a general cont...

Section 153.501 | Subcontracts awarded by construction manager at risk, design-build firm, or general contracting firm; utilization of design-assist firm; self-performed portions of work.

...(A) A public authority may accept a subcontract awarded by a construction manager at risk, a design-build firm, or a general contracting firm, or may reject any such subcontract if the public authority determines that the bidder is not responsible. (B) A public authority may authorize a construction manager at risk or design-build firm to utilize a design-assist firm on any public improvement project without ...

Section 153.502 | Construction management or design-build contracts; prequalification of bidders.

...hall be subject to the approval of the public authority involved in the project and shall be consistent with the rules adopted by the Ohio facilities construction commission pursuant to section 153.503 of the Revised Code. (B) For each subcontract to be awarded, the construction manager at risk or design-build firm shall identify at least three prospective bidders that are prequalified to bid on that subcont...

Section 153.503 | Adoption of rules.

...the contract documents to be used by a public authority when entering into a contract with a construction manager at risk or design-build firm.

Section 153.51 | Separate contracts - single, aggregate contract.

... bids in the aggregate. (B)(1) If the public authority awards a single, aggregate contract for the entire project pursuant to division (A) of this section, the award shall be made to the bidder who is the lowest responsive and responsible bidder or the lowest and best bidder, as applicable, as specified in section 153.52 of the Revised Code. (2) The public authority may assign all or any portion of its intere...

Section 153.52 | Awarding of contracts to separate bidders.

...ials therefor, shall be awarded by the public authority referred to in section 153.50 of the Revised Code, in its discretion, to the lowest responsive and responsible separate bidder therefor, in accordance with section 9.312 of the Revised Code in the case of any public authority of the state or any public institution belonging thereto, and to the lowest and best separate bidder in the case of a county, townsh...

Section 153.53 | Adjusting threshold in section 153.01 for inflation.

...(A) As used in this section, "rate of inflation" has the same meaning as in section 107.032 of the Revised Code. (B) Five years after September 29, 2011, and every five years thereafter, the executive director of the Ohio facilities construction commission shall evaluate the monetary threshold specified in section 153.01 of the Revised Code and adopt rules adjusting that amount based on the average rate of in...

Section 153.54 | Bid guaranty to be filed with bid.

...e department of transportation, for any public improvement shall file with the bid, a bid guaranty in the form of either: (1) A bond in accordance with division (B) of this section for the full amount of the bid; (2) A certified check, cashier's check, or letter of credit pursuant to Chapter 1305. of the Revised Code, in accordance with division (C) of this section. Any such letter of credit is revocable only a...

Section 153.55 | Dividing project into parts to avoid threshold prohibited; costs included in threshold amount.

...urposes of calculating the amount of a public improvement project to determine whether it is subject to section 153.01 of the Revised Code, no officer, board, or other authority of the state or any institution supported by the state shall subdivide a public improvement project into component parts or separate projects in order to avoid the threshold of that section, unless the component parts or separate projec...

Section 153.56 | Creditor shall furnish statement of amount due - service of notice of furnishing.

...k performed or materials furnished in a public improvement as provided in section 153.54 of the Revised Code, at any time after performing the labor or work or furnishing the materials, but not later than ninety days after the completion of the contract by the principal contractor or design-build firm and the acceptance of the public improvement for which the bond was provided by the duly authorized board or of...

Section 153.57 | Form of bond.

...(A) The bond provided for in division (C)(1) of section 153.54 of the Revised Code shall be in substantially the following form, and recovery of any claimant thereunder shall be subject to sections 153.01 to 153.60 of the Revised Code, to the same extent as if the provisions of those sections were fully incorporated in the bond form: "KNOW ALL PERSONS BY THESE PRESENTS, that we, the undersigned _____________________...

Section 153.571 | Form of bond.

...The bond provided for in division (B) of section 153.54 of the Revised Code shall be in substantially the following form, and recovery of any claimant thereunder shall be subject to sections 153.01 to 153.60 of the Revised Code, to the same extent as if the provisions of such sections were fully incorporated in the bond form: "KNOW ALL PERSONS BY THESE PRESENTS, that we, the undersigned _________________ as principa...

Section 153.58 | Prohibition.