Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
construction
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"construction","start":951,"pageSize":25,"sort":"BestMatch","title":""}
Results 951 - 975 of 1,984
Sort Options
Sort Options
Sections
Section
Section 151.08 | State capital improvements bond service fund.

...vement projects" means the acquisition, construction, reconstruction, improvement, planning, and equipping of roads and bridges, waste water treatment systems, water supply systems, solid waste disposal facilities, flood control systems, and storm water and sanitary collection, storage, and treatment facilities, including real property, interests in real property, facilities, and equipment related or incidental to th...

Section 1513.07 | Coal mining and reclamation permit - application or renewal - reclamation plan.

...nced coal mining operations at the time construction of the synthetic fuel or generating facility is initiated. (4)(a) Any permit issued pursuant to this chapter shall carry with it the right of successive renewal upon expiration with respect to areas within the boundaries of the permit. The holders of the permit may apply for renewal and the renewal shall be issued unless the chief determines by written findings, ...

Section 1513.081 | Priority lien where permittee becomes insolvent or alternative not provided.

...rect costs of the development, design, construction, management, and administration of the reclamation and, if applicable, the long-term water treatment or long-term alternative water supply. The statement shall constitute a lien on the assets of the permittee as of the date of the filing. The lien shall continue in force so long as any portion of the lien remains unpaid or until the chief issues a certificate ...

Section 1513.372 | Immunity from liability.

...or omission of the division during the construction, operation, and maintenance of the reclamation project; (3) For any failure of an acid mine drainage abatement facility constructed or installed during a reclamation project that is supervised by the division; (4) For the operation, maintenance, or repair of any acid mine drainage abatement facility constructed or installed during a reclamation project unles...

Section 1514.02 | Surface or in-stream mining permit - application contents.

...n adopted that governs land uses or the construction of public improvements and utilities for an area that includes the area sought to be mined, ensure that future land uses within the site will not conflict with the plan. On and after March 15, 2002, division (A)(10)(b) of this section does not apply to any surface or in-stream mining permit or applications for a surface or in-stream mining permit, any renewal...

Section 1514.051 | Forfeiture of performance bond - priority lien.

...irect costs of the development, design, construction, management, and administration of the reclamation. The statement shall constitute a lien on the assets of the operator as of the date of the filing. The lien shall continue in force so long as any portion of the lien remains unpaid or until the chief issues a certificate of release of the lien. If the chief issues a certificate of release of the lien, the chief sh...

Section 1517.02 | Chief of division - powers and duties.

...pact reviews of any planned or proposed construction, modification, renovation, or development project that is subject to approval under section 1517.15 of the Revised Code and may potentially impact a designated wild, scenic, or recreational river. Such fees and charges shall be credited to the natural areas and preserves fund created in section 1517.11 of the Revised Code. (7) Provide facilities and improvements ...

Section 1517.09 | Construction of chapter.

...Nothing contained in this chapter shall be construed as interfering with the purposes stated in the establishment of or pertaining to any state or local park, forest, preserve, wildlife refuge or other area or the proper management and development thereof, except that any agency administering an area dedicated as a nature preserve under section 1517.05 of the Revised Code shall be responsible for preserving the chara...

Section 1517.16 | Expenditures for wild, scenic, and recreational rivers.

...l rivers and scenic river lands and for construction of facilities on publicly owned lands that are administered by the division and are within the watersheds of those rivers. The chief, with the approval of the director of natural resources, may expend for the purpose of administering the state programs for wild, scenic, and recreational rivers money that is: (1) Appropriated by the general assembly for that pu...

Section 1521.04 | Use of water management fund.

... to amortize and defray the cost of the construction, maintenance, and operation of those facilities.

Section 1521.09 | Reservoirs - reduction of assessed valuation.

...oration in this state, who shall by the construction of a dam across any watercourse form upon his own land one or more reservoirs for the collection and storage of surface water, and who maintains such reservoirs in such condition as to collect and store such water, or who donates to the state or any of its agencies a tract of land on which the state or any of its agencies may erect and maintain a reservoir for the...

Section 1521.13 | Floodplain management activities.

... to the expenditure of money for or the construction of buildings, structures, roads, bridges, or other facilities in locations that may be subject to flooding or flood damage, all state agencies and political subdivisions shall notify and consult with the division of water resources and shall furnish information that the division reasonably requires in order to avoid the uneconomic, hazardous, or unnecessary use of ...

Section 153.012 | Preference to contractors having principal place of business in Ohio.

...ct to the award of any contract for the construction, reconstruction, improvement, enlargement, alteration, repair, painting or decoration of a public improvement, including any highway improvement, made by the state or in whole or in part supported by the state, except for a contract for products produced or mined in Ohio or for a contract financed in whole or in part by contributions or loans from any agency of the...

Section 153.04 | Forms for providing bidding information - life-cycle costs.

... are prescribed by the Ohio facilities construction commission. The life-cycle costs shall be a primary consideration in the selection of a design. The same shall be deposited and safely kept in the office of the owner as defined in section 153.01 of the Revised Code as the property of the state.

Section 153.07 | Publishing notice of bids.

...apers as ordered by the Ohio facilities construction commission, the last publication to be at least eight days preceding the day for opening the bids, and in such form and with such phraseology as the commission orders. Copies of the plans, details, estimates of cost, and specifications shall be open to public inspection at all business hours between the day of the first publication and the day for opening the...

Section 153.09 | New proposals when necessary - change in work or materials.

... such newspaper as the Ohio facilities construction commission directs. All contracts shall provide that such owner may make any change in work or materials on the conditions and in the manner provided in sections 153.10 and 153.11 of the Revised Code.

Section 153.16 | Policy and procedure guidelines for contract documents in conjunction with administration of public works contracts.

...cutive director of the Ohio facilities construction commission shall establish policy and procedure guidelines for contract documents in conjunction with the administration of public works contracts that the state or any institution supported in whole or in part by the state enters into for any project subject to sections 153.01 to 153.11 of the Revised Code. (B) Notwithstanding any contract provision to the ...

Section 153.17 | Requisition upon contractor for additional specific force or materials.

... written consent of the Ohio facilities construction commission, may employ upon the work the additional force, or supply the special materials or such part of either as is considered proper, and may remove improper materials from the grounds. (B) When the original contractor has defaulted on a contract and the surety has declined to take over the project, the owner may contract with one or more takeover contracto...

Section 153.27 | Architects - superintendents - employees.

...nd other necessary employees during the construction of a courthouse or other county building and fix their compensation and bond.

Section 153.53 | Adjusting threshold in section 153.01 for inflation.

...cutive director of the Ohio facilities construction commission shall evaluate the monetary threshold specified in section 153.01 of the Revised Code and adopt rules adjusting that amount based on the average rate of inflation during each of the previous five years immediately preceding such adjustment.

Section 153.55 | Dividing project into parts to avoid threshold prohibited; costs included in threshold amount.

...associated with the work; (3) Project construction costs; (4) A contingency reserve fund.

Section 153.56 | Creditor shall furnish statement of amount due - service of notice of furnishing.

...of the Revised Code, and may include a "construction manager at risk" as defined in section 9.33 of the Revised Code.

Section 153.59 | Discrimination and intimidation on account of race, religion, sex, disability, national origin or ancestry.

...cipal corporation of the state, for the construction, alteration, or repair of any public building or public work in the state shall contain provisions by which the contractor agrees to both of the following: (A) That, in the hiring of employees for the performance of work under the contract or any subcontract, no contractor, subcontractor, or any person acting on a contractor's or subcontractor's behalf, by reason...

Section 153.63 | Agreement for escrow account for contractor.

...le sections of the Revised Code for the construction, reconstruction, improvement, enlargement, alteration, repair, painting, or decoration of a public improvement shall, on the day it is due, be paid to the contractor or deposited in an escrow account, whichever is applicable, with one or more banks or building and loan associations in the state selected by mutual agreement between the contractor and the public owne...

Section 153.693 | Evaluation of design-build firms.

... schedule; (d) A description of any preconstruction services; (e) A description of the proposed design services; (f) A description of a guaranteed maximum price, including the estimated level of design on which such guaranteed maximum price is based; (g) The form of the design-build services contract; (h) A request for a pricing proposal that shall be divided into a design services fee and a preconstruction a...