Section
Section 4906.022 | Ad hoc member designation.

...(A) Voting ad hoc members of the power siting board under section 4906.021 of the Revised Code shall be designated not later than thirty days after a board of county commissioners or a board of township trustees receives notification that an application, for which an ad hoc member shall be included, has been found to be in compliance with division (A) of section 4906.06 of the Revised Code by the chairperson of the p...

Section 4906.023 | Limitation on ad hoc member of intervening township or county.

...If a board of township trustees or board of county commissioners seeks to adopt a resolution to intervene in a power siting board case for which it is entitled to have a voting ad hoc member under section 4906.02 of the Revised Code, the member shall not vote on the resolution to intervene, unless the member designates another individual to serve as the ad hoc member. A designee under this section shall meet the re...

Section 4906.024 | Ex parte communication exemption and requirements for ad hoc members.

...(A) A voting ad hoc member of the power siting board under section 4906.02 of the Revised Code shall be exempt from any limitations on ex parte communications. (B) If such an ad hoc member communicates with a party, including any party who is an intervenor, to a board proceeding, the ad hoc member and the party shall disclose the following to the board: (1) The date of the conversation; (2) All participants in ...

Section 4906.025 | Ad hoc member confidentiality requirements.

...No present or former voting ad hoc member of the power siting board shall disclose or use, without appropriate authorization, information acquired in the course of official duties that is confidential because of either of the following: (A) Statutory law; (B) Notice the ad hoc member received designating the information as confidential and both of the following apply: (1) The status of the proceedings, or the ...

Section 4906.03 | Powers and duties of power siting board.

...The power siting board shall: (A) Require such information from persons subject to its jurisdiction as it considers necessary to assist in the conduct of hearings and any investigations or studies it may undertake; (B) Conduct any studies or investigations that it considers necessary or appropriate to carry out its responsibilities under this chapter; (C) Adopt rules establishing criteria for evaluating the ...

Section 4906.04 | Certificate required for construction of major utility facility.

...No person shall commence to construct a major utility facility in this state without first having obtained a certificate for the facility. The replacement of an existing facility with a like facility, as determined by the power siting board, shall not constitute construction of a major utility facility. Such replacement of a like facility is not exempt from any other requirements of state or local laws or regulations...

Section 4906.05 | Certificate exemptions.

...No certificate is required for a major utility facility on which construction had already commenced on October 23, 1972, or within two years thereafter. This section does not exempt such a facility from any other requirements of state and local laws and regulations. No certificate is required for any major utility facility already in operation on October 23, 1972, and the facility shall not be exempt from any...

Section 4906.06 | Certificate application.

...if ordered, and shall be available for public inspection. The application shall be filed not more than five years prior to the planned date of commencement of construction. The five-year period may be waived by the board for good cause shown. (B) Each application shall be accompanied by proof of service of a copy of such application on the chief executive officer of each municipal corporation and county, and t...

Section 4906.07 | Public hearing on application.

...g board shall promptly fix a date for a public hearing thereon, not less than sixty nor more than ninety days after such receipt, and shall conclude the proceeding as expeditiously as practicable. (B) On an application for an amendment of a certificate, the board shall hold a hearing in the same manner as a hearing is held on an application for a certificate if the proposed change in the facility would result...

Section 4906.08 | Parties - testimony.

...ty within thirty days after the date of publication of the notice required by division (C) of section 4906.06 of the Revised Code, and if that petition has been granted by the board for good cause shown. (B) The board, in extraordinary circumstances for good cause shown, may grant a petition, for leave to intervene as a party to participate in subsequent phases of the proceeding, that is filed by a person identified...

Section 4906.09 | Record of hearing.

...A record shall be made of the hearing and of all testimony taken. Rules of evidence, as specified by the power siting board, shall apply to the proceeding. The board may provide for the consolidation of the representation of parties having similar interests.

Section 4906.10 | Basis for decision granting or denying certificate.

... (6) That the facility will serve the public interest, convenience, and necessity; (7) In addition to the provisions contained in divisions (A)(1) to (6) of this section and rules adopted under those divisions, what its impact will be on the viability as agricultural land of any land in an existing agricultural district established under Chapter 929. of the Revised Code that is located within the site and alterna...

Section 4906.101 | No power siting board certificate or amendment in restricted area.

...(A) For purposes of this section and sections 4906.102 and 4906.103 of the Revised Code, "material amendment" and "utility facility" have the same meanings as in section 303.57 of the Revised Code. (B) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or material amendment to an existing certificate for, a utility facility, either as proposed or as modified by...

Section 4906.102 | No power siting board certificate or amendment where prohibited.

...(A) The power siting board shall not grant a certificate for the construction, operation, and maintenance of, or a material amendment to an existing certificate for, a utility facility, either as proposed or as modified by the board, to be constructed in the unincorporated area of a county, if the board of county commissioners of the county in which a utility facility is to be located has adopted a resolution prohibi...

Section 4906.103 | No power siting board certificate or amendment where limited.

...If a board of county commissioners has adopted a resolution which limits the boundaries of the proposed utility facility to a smaller geographic area of the county, completely within what was proposed by the applicant, as described in section 303.62 of the Revised Code, the power siting board shall not grant a certificate or material amendment that includes an area outside of the geographic area approved by the board...

Section 4906.105 | Report to the general assembly.

...mers. The board shall hold at least one public meeting before completing the report. The board shall complete the report in consultation with JobsOhio and may consult with or request the assistance of PJM interconnection regional transmission organization, L.L.C., the independent market monitor for PJM interconnection regional transmission organization, L.L.C. and other interested stakeholders, such as transmission o...

Section 4906.11 | Opinion stating reason for decision.

...In rendering a decision on an application for a certificate, the power siting board shall issue an opinion stating its reasons for the action taken.

Section 4906.12 | Procedures of public utilities commission to be followed.

...he same manner as if the board were the public utilities commission under such sections.

Section 4906.13 | No local jurisdiction.

...nection to the electrical grid. (B) No public agency or political subdivision of this state may require any approval, consent, permit, certificate, or other condition for the construction or operation of a major utility facility or economically significant wind farm authorized by a certificate issued pursuant to Chapter 4906. of the Revised Code. Nothing herein shall prevent the application of state laws for the pro...

Section 4906.14 | Joint proceedings.

...The power siting board, in the discharge of its duties under Chapter 4906. of the Revised Code, may make joint investigations, hold joint hearings within or without the state, and issue joint or concurrent orders in conjunction or concurrence with any official or agency of any state or of the United States, whether in the holding of such investigations or hearings, or in the making of such orders, the board is functi...

Section 4906.20 | Certificate required to construct certain wind farms.

...(A) No person shall commence to construct an economically significant wind farm in this state without first having obtained a certificate from the power siting board. An economically significant wind farm with respect to which such a certificate is required shall be constructed, operated, and maintained in conformity with that certificate and any terms, conditions, and modifications it contains. A certificate shall b...

Section 4906.201 | Setback requirements.

...(A) An electric generating plant that consists of wind turbines and associated facilities with a single interconnection to the electrical grid that is designed for, or capable of, operation at an aggregate capacity of fifty megawatts or more is subject to the minimum setback requirements established in rules adopted by the power siting board under division (B)(2) of section 4906.20 of the Revised Code. (B)(1...

Section 4906.21 | Decommissioning plan for solar and wind generation required.

...(A) For the purposes of this section and sections 4906.21 to 4906.232 of the Revised Code: (1) "Applicant" means an applicant for a certificate, or a material amendment to an existing certificate, from the power siting board to construct, operate, or maintain a utility facility, and includes any subsequent person to whom the certificate is transferred. (2) "Material amendment" and "utility facility" have the same...

Section 4906.211 | Decommissioning plan requirements and estimated costs.

...(A) The decommissioning plan submitted to the power siting board under section 4906.21 of the Revised Code shall be prepared by a professional engineer registered with the state board of registration for professional engineers and surveyors. The board may reject the engineer chosen by the applicant and to require the applicant to choose another qualified engineer. (B) The plan shall contain the following: (1) A l...

Section 4906.212 | Decommissioning estimated costs recalculation.

...The estimate of the total decommissioning costs of a utility facility, as described in division (B)(3) of section 4906.211 of the Revised Code, shall be recalculated every five years by an engineer retained by the applicant.