Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Ohio Revised Code Search

Titles
Busy
 
Keywords
:
monedas FC 26 precio Visité Buyfc26coins.com. ¡Excelente! Recomendado al 100%..SVbM
{"removedFilters":"","searchUpdateUrl":"\/ohio-revised-code\/search\/update-search","keywords":"monedas+FC++26+precio+Visit%C3%A9+Buyfc26coins.com.+%C2%A1Excelente%21+Recomendado+al+100%25..SVbM","start":7776,"pageSize":25,"sort":"BestMatch","title":""}
Results 7,776 - 7,800 of 15,258
Sort Options
Sort Options
Sort Options
Sections
Section
Section 3781.25 | One-call utility protection service definitions.

... center, but not an owner of an individual utility, that exists for the purpose of receiving notice from persons that prepare plans and specifications for or that engage in excavation work, that distributes this information to its members and participants, and that has registered by March 14, 1989, with the secretary of state and the public utilities commission of Ohio under former division (F) of section 153.64 of t...

Section 3781.26 | Protection service for underground utility facilities.

...rates underground utility facilities shall participate in and register the location of its underground utility facilities with a protection service that serves the area where the facilities are located. A utility may elect to participate in the service on a limited basis and if it does so, it shall register the location of its underground utility facilities by identifying the municipal corporations, and outsid...

Section 3781.261 | Protection of underground utility facilities training.

...y that utilizes a protection service shall obtain training in the protection of underground utility facilities. An excavator, contractor, or utility shall be deemed to have obtained that training if the excavator, contractor, or utility is a member of a protection service or a statewide association representing excavators, contractors, or utilities and the service or association provides that training. An exca...

Section 3781.27 | Developer or designer notifying protection service of intended excavation.

...oyed by the developer for the project shall notify a protection service of the location of the proposed excavation site. (B) Except in the case of limited basis participants, the protection service shall provide notice of the proposed excavation to each participant in the service that has underground utility facilities in the area of the proposed excavation site. Except as provided in section 3781.271 of the Revis...

Section 3781.271 | Modification of one-call notification system.

...uly 1, 2013, each protection service shall reasonably modify its one-call notification system so as to permit the reasonable identification of the location of a proposed excavation site in a manner in which the protection service may then notify any potentially affected limited basis participants. Each member of a protection service, including limited basis participants, shall be responsible for providing curr...

Section 3781.28 | Excavator notifying protection service or pipeline owner.

...commencing excavation, the excavator shall notify a protection service of the location of the excavation site and the date on which excavation is planned to commence. (B) On receipt of notice under division (A) of this section, the protection service shall provide to each utility with underground utility facilities located at the excavation site, notice of the proposed excavation. (C) In the case of an inter...

Section 3781.29 | Marking location of facilities or give notice of no facilities at site.

...information provided under section 3781.26 of the Revised Code has facilities located within the designated area of the emergency excavation. (3) Any utility notified of an emergency excavation may inspect all of its underground utility facilities located at the emergency excavation site and may take any otherwise lawful action it considers necessary to prevent disturbance to or interference with its facilities du...

Section 3781.30 | Duties of excavator.

... When making excavations using traditional or trenchless technologies, the excavator shall do all of the following: (1) Maintain reasonable clearance between any underground facility and the cutting edge or point of powered equipment; (2) Protect and preserve the markings of tolerance zones of underground utility facilities until those markings are no longer required for proper and safe excavations; (3) When...

Section 3781.31 | Notifying of commencement of excavation or of removal of markings.

... prior notice to the utility of the actual commencement of the excavation. An excavator that receives a request for notice under this division shall provide the notice to the utility at least one full working day prior to the commencement of excavation. The excavator may make this notice by telephone. (B) If the markings of underground utility facilities made under section 3781.29 of the Revised Code are destr...

Section 3781.32 | Connections or tie-ins within right-of-way.

...services within a public right-of-way shall comply with permit requirements of the public authority that has jurisdiction over that right-of-way. (B) A developer or the designer employed by the developer shall not require, as a condition for entering into a contract for a project that will require excavation, that responsibility for performance of duties imposed under sections 3781.25 to 3781.32 of the Revise...

Section 3781.34 | Underground technical committee.

...s hereby created the underground technical committee. (B) The committee shall consist of four members from the stakeholder group of the commercial excavator industry, in accordance with division (C) of this section, and one member from each of the following stakeholder groups: (1) The natural gas transmission pipeline industry, appointed by the president of the senate; (2) The natural gas distribution industry,...

Section 3781.341 | Conflicts of interest.

...A member of the underground technical committee who has a conflict of interest in a particular review under section 4913.15 of the Revised Code shall declare the conflict to the committee and recuse self from committee discussions and voting regarding that review.

Section 3781.342 | Meetings.

...(A) The underground technical committee may conduct meetings in person, by teleconference, or by video conference. (B) The committee shall establish a primary meeting location that is open and accessible to the public. (C) Before convening a meeting by teleconference or video conference, the committee shall send, via electronic mail, or United States postal service, a copy of meeting-related documents to each c...

Section 3781.343 | Disclosure requirements.

...A member of the underground technical committee is not subject to the disclosure requirements of sections 102.02 and 102.021 of the Revised Code by virtue of membership on the committee.

Section 3781.36 | Duties of committee.

...(A) The underground technical committee shall do the following: (1) Coordinate with the public utilities commission in carrying out its duties under Chapter 4913. of the Revised Code; (2) Provide subject matter expertise when requested during inquiries conducted under section 4913.09 of the Revised Code; (3) Review reports in accordance with section 4913.15 of the Revised Code; (4) Make recommendations under ...

Section 3781.361 | OHIO811 nonvoting advisory member.

...ber appointed to the underground technical committee under division (B)(14) of section 3781.34 of the Revised Code shall do the following: (1) Provide support to the committee during discussions regarding the enforcement provisions of the Ohio underground protection service law; (2) Provide subject matter expertise and education regarding the "Contact 811 Before You Dig" process and stakeholder responsibilities t...

Section 3781.38 | Member immunity.

...Every member of the underground technical committee shall be immune, individually and jointly, from civil liability for any act or omission done or made in performance of the member's duties while serving as a member of the committee, but only in the absence of willful misconduct.

Section 3781.40 | Welding standards.

..., and other methods used to ensure that all structural steel welds meet, at minimum, the codes and standards for such welds established in the American welding society structural steel welding code D1.1 and the nonresidential building code adopted under section 3781.10 of the Revised Code. (2) "Certified welding inspector" means a person who has been certified by the American welding society to inspect structural s...

Section 3781.55 | Breast-feeding in places of public accommodation.

...A mother is entitled to breast-feed her baby in any location of a place of public accommodation wherein the mother otherwise is permitted. "Place of public accommodation" has the same meaning as in section 4112.01 of the Revised Code.

Section 3781.99 | Penalty.

... section 3781.111 of the Revised Code shall be issued a warning for a first offense. On each subsequent offense, the person shall be fined twenty-five dollars for each parking location that is not properly marked or whose markings are not properly maintained. (B) Whoever violates this chapter or any rule adopted or order issued pursuant to it that relates to the construction, alteration, or repair of any building, a...

Section 3783.01 | Building standards - electrical safety standards definitions.

...ve, of the Revised Code: (A) "Electrical safety inspector" means a person who is certified as provided in Chapter 3783. of the Revised Code. (B) The "practice of electrical inspection" includes any ascertainment of compliance with the Ohio building code, or the electrical code of a political subdivision of this state by a person, who, for compensation, inspects the construction and installation of electrical cond...

Section 3783.02 | Exemptions.

...783.01 to 3783.07 of the Revised Code shall apply to inspection of the design, construction, maintenance, or replacement of any of the following: (A) Installations in ships, watercraft, railway rolling stock, aircraft, or automotive vehicles; (B) Installations underground in mines; (C) Installations of railways for the generation, transformation, transmission, or distribution of power used exclusively for opera...

Section 3783.03 | Certificate of competency.

...(A) The board of building standards shall issue a certificate of competency as an electrical safety inspector to any person who successfully passes an examination pursuant to division (B) of this section or who qualifies for renewal pursuant to section 3783.04 of the Revised Code. Each certificate of competency issued by the board shall be signed by the chairperson and the secretary of the board and shall show on its...

Section 3783.04 | Renewing certificates.

...All certificates of competency issued to electrical safety inspectors shall expire three years from the date of issuance unless renewed according to the standard renewal procedure of sections 4745.01 to 4745.03 of the Revised Code. The board of building standards shall establish the amount of the renewal fee. Each renewal certificate shall be signed by the chairman and the secretary of the board, and shall show on i...

Section 3783.05 | Board of building standards rules - fees credited to industrial compliance operating fund.

...3781., and 3791. of the Revised Code, shall adopt, amend, or repeal such rules as may be reasonably necessary to administer this chapter. All fees collected by the board pursuant to this chapter shall be paid into the state treasury to the credit of the industrial compliance operating fund created in section 121.084 of the Revised Code.