Ohio Revised Code Search
| Section |
|---|
|
Section 153.25 | Vacancies.
...dge of the court of common pleas as provided in section 153.21 of the Revised Code. |
|
Section 153.26 | Contracts.
..., the building commission shall invite bids and award contracts in accordance with sections 307.86 to 307.92, inclusive, of the Revised Code, for the building and for furnishing, heating, lighting, and ventilating it, and for the sewerage thereof. Until the building is completed and accepted by the commission, the commission may determine all questions connected therewith. The commission shall be governed by section... |
|
Section 153.27 | Architects - superintendents - employees.
...The building commission may employ architects, superintendents, and other necessary employees during the construction of a courthouse or other county building and fix their compensation and bond. |
|
Section 153.28 | Plans, drawings, and cost estimates filed with county auditor.
...e shall be made until the price to be paid therefor has been agreed upon in writing between the commission and the contractor. |
|
Section 153.29 | Proceedings of building commission.
...compensation, the approval of bonds or bid guaranties, and the allowance of estimates shall be in writing and shall require for their adoption the votes of five members of the building commission, taken by yeas and nays recorded on the journal of the board of county commissioners. When signed by five members of the commission, the county auditor shall draw his warrant on the county treasurer for the payment of all bi... |
|
Section 153.30 | Record of proceedings.
...Full and accurate records of all proceedings of the building commission shall be kept by the county auditor upon the journal of the board of county commissioners. He shall carefully preserve in his office all plans, drawings, representations, bills of material, specifications of work, and estimates of costs in detail and in the aggregate pertaining to the building. |
|
Section 153.31 | Plans and estimates for construction - construction project manager or consultants.
...(A) Except as provided in division (D) of this section, when it becomes necessary for the board of county commissioners of a county to erect or cause to be erected a public building, or a substructure for a bridge, or an addition to or alteration thereof, before entering into any contract therefor or repair thereof or for the supply of any materials therefor, they shall cause to be made by a registered architect or r... |
|
Section 153.311 | Construction of public building in stages.
...Nothing contained in Chapter 153. of the Revised Code shall prevent a board of county commissioners from constructing a public building in stages and letting contracts from time to time for various portions of the work, so long as the total cost of construction of a project, which may include more than one building, is reasonably estimated by the board to exceed fifteen million dollars. |
|
Section 153.32 | Contracts for erection and repair of superstructures.
...When it becomes necessary to erect a bridge, the board of county commissioners shall determine the length and width of the superstructure, and whether it shall be single or double track, and it shall advertise for bids for performing the labor and furnishing the materials necessary to the erection thereof in accordance with sections 307.86 to 307.92 of the Revised Code. |
|
Section 153.33 | Bids on other plans may be considered.
...oners may also invite, receive, and consider bids on any other plan at the option of bidders, and shall require that any such plan together with specifications shall be filed in the office of the county auditor for a period of fifteen days prior to the date for receiving bids. Such plans and specifications shall show the number of spans, the length of each, the nature, quality, and size of the materials to be used, t... |
|
Section 153.34 | Contents of advertisement.
...d of county commissioners shall invite bidders to make bids for furnishing all the materials and performing all the work, or for such parts thereof as bidders deem proper, and include such other matter as is required in section 307.87 of the Revised Code. |
|
Section 153.35 | Plans shall be kept on file in county auditor's office.
...rt of the contract with the successful bidder. When it is necessary to alter, repair, or make an addition to a bridge, the board of county commissioners in making contracts therefor, shall conform to sections 153.01 to 153.60, inclusive, of the Revised Code, in relation to the erection of bridges as nearly as the nature of the case will permit. |
|
Section 153.36 | Approval of plans for courthouse or jail.
...(A) If the plans, drawings, representations, bills of material, and specifications of work, and estimates of the cost thereof in detail and in the aggregate, required in sections 153.31 to 153.35, inclusive, of the Revised Code, relate to the building of a courthouse or jail, or an addition to or alteration, repair, or improvement thereof, they shall be submitted to the board of county commissioners. If the estimated... |
|
Section 153.37 | Approval of plans for county home.
...If the plans, drawings, representations, bills of material, and specifications of work and estimates of the cost thereof relate to the building, addition to, or alteration of a county home, they shall be submitted to the board of county commissioners. If approved by a majority of the board, a copy thereof shall be deposited in the office of the board of county commissioners and kept for the inspection and use of part... |
|
Section 153.38 | Approval of plans for bridge.
...estimates relate to the building of a bridge, they shall be submitted to the board of county commissioners and the county engineer. If approved by a majority of them, a copy thereof shall be deposited in the office of county engineer and kept for the inspection of parties interested. |
|
Section 153.39 | Approval of plans for children's home.
... of the county, to be appointed by a resident judge of the court of common pleas, or a judge residing in the same subdivision of the judicial district. If approved by a majority of them, a copy thereof shall be deposited in the office of the board of county commissioners and kept by the board for the inspection of interested parties. Before such plans are adopted, they shall be submitted to the department of children... |
|
Section 153.44 | Contracts submitted to prosecuting attorney.
...fect, otherwise the contract shall be void. |
|
Section 153.45 | Commissioners may annul old and make new contracts.
...If a contractor fails or refuses to proceed with the work specified in his contract in accordance with the plans, descriptions, and specifications attached to and made part thereof, the board of county commissioners may annul such contract, and shall proceed to make another contract for the completion thereof, in accordance with sections 153.01 to 153.60, inclusive, of the Revised Code. |
|
Section 153.49 | Duty of county treasurer.
...names of the persons to whom they are paid. |
|
Section 153.50 | Separate bids for work and materials.
...ist firm" means a person capable of providing design-assist services. (4) "Design-build firm" has the same meaning as in section 153.65 of the Revised Code. (5) "General contracting" means constructing and managing an entire public improvement project, including the branches or classes of work specified in division (B) of this section, under the award of a single aggregate lump sum contract. (6) "General cont... |
|
Section 153.501 | Subcontracts awarded by construction manager at risk, design-build firm, or general contracting firm; utilization of design-assist firm; self-performed portions of work.
...e public authority determines that the bidder is not responsible. (B) A public authority may authorize a construction manager at risk or design-build firm to utilize a design-assist firm on any public improvement project without transferring any design liability to the design-assist firm. (C) If the construction manager at risk or design-build firm intends and is permitted by the public authority to self-perform... |
|
Section 153.502 | Construction management or design-build contracts; prequalification of bidders.
...y which it will prequalify prospective bidders on subcontracts awarded for work to be performed under the construction management or design-build contract. The criteria established by a construction manager at risk or design-build firm shall be subject to the approval of the public authority involved in the project and shall be consistent with the rules adopted by the Ohio facilities construction commission pursuant ... |
|
Section 153.503 | Adoption of rules.
...The Ohio facilities construction commission, pursuant to Chapter 119. of the Revised Code, shall adopt rules to do all of the following: (A) Prescribe the procedures and criteria for determining the best value selection of a construction manager at risk or design-build firm; (B) Set forth standards to be followed by construction managers at risk and design-build firms when establishing prequalification crite... |
|
Section 153.51 | Separate contracts - single, aggregate contract.
...(A) If separate and distinct bids are required pursuant to section 153.50 of the Revised Code, no contract for the entire job, or for a greater portion thereof than is embraced in one such branch or class of work may be awarded, unless the separate bids do not cover all the work and materials required or the bids for the whole or for two or more kinds of work or materials are lower than the separate bids in the... |
|
Section 153.52 | Awarding of contracts to separate bidders.
...t responsive and responsible separate bidder therefor, in accordance with section 9.312 of the Revised Code in the case of any public authority of the state or any public institution belonging thereto, and to the lowest and best separate bidder in the case of a county, township, or municipal corporation, or any public institution belonging thereto, and to the lowest responsive and responsible bidder in the cas... |